Planning projects in Blayney Shire
20 State significant and State-assessed projects in Blayney Shire are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Blayney Shire is on exhibition right now. See everything open across NSW.
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Cadia Continued Operations Project (CCOP)
Extension of the approved Cadia East Gold/Copper Project, including an extension to the existing Southern Tailings Storage Facility
Blayney Shire+1 moreSSD-71290981
Prepare EIS
McPhillamys Electricity Transmission Line
Development of an electricity transmission line (ETL) to connect the McPhillamys Gold Project (SSD-9505) to the electricity grid.
Blayney Shire+2 moreSSI-99421458
Prepare EIS
McPhillamys Water Supply Pipeline
Development of a water supply pipeline between the Angus Place Colliery and the McPhillamys mine site.
Blayney Shire+2 moreSSI-99419963
Prepare EIS
McPhillamys Integrated Waste Landform
Development of an integrated waste landform (IWL) and supporting infrastructure for the co-disposal of waste rock and tailings.
Blayney ShireSSI-99418956
Recently assessed or decided
Withdrawn
MOD 15 - Various including tailings dam embankment upgrade
Includes changes to tailings dam embankment footprint, infrastructure areas, development of the Ridgeway Mine, realignment of Panuara Road, new site access roads, tailings pilot plant, ventilation shafts and more (refer to scoping letter)
Cabonne Shire+1 moreGA-58523959
Withdrawn
MOD 15 - Various including tailings dam embankment upgrade
Includes changes to tailings dam embankment footprint, infrastructure areas, development of the Ridgeway Mine, realignment of Panuara Road, new site access roads, tailings pilot plant, ventilation shafts and more (refer to scoping letter)
Cabonne Shire+1 moreGA-58522711
Withdrawn
Cadia Continued Operations Project (CCOP)
Extension of the approved Cadia East Gold/Copper Project, including an extension to the existing Southern Tailings Storage Facility
Blayney Shire+1 moreGA-73942707
Withdrawn
MOD 1 - Layout Optimisation
Layout changes to optimise the project’s construction and operation and incorporate the 132 kV electricity transmission line into the project.
Blayney Shire+3 moreSSD-9505-Mod-1
Determination
MOD 13 - Cadia Hill Tailings Completion
Increase tailings level of Cadia Hill open pit to full capacity (approx. 177Mt over 7 yrs), decommission vent adit VR101 & install new vent adit and construct additional buttressing for the STSF embankment.
Cabonne Shire+1 moreMP06_0295-Mod-13
Determination
MOD 5 - Increase easement corridor
Increase the maximum width of a section of the cleared easement corridor from 45m to 70m and minor realignment of the 132kV power line route.
Blayney Shire+1 moreMP08_0252-Mod-5
Determination
Flyers Creek Wind Farm
Construction and operation of a 88-132MW wind farm, with up to 44 turbines and associated infrastructure at Flyers Creek, approximately 20 kilometres south of Orange.
Blayney ShireMP08_0252
Determination
MOD 15 - Various including tailings dam embankment upgrade
Includes changes to tailings dam embankment footprint, infrastructure areas, development of the Ridgeway Mine, realignment of Panuara Road, new site access roads, tailings pilot plant, ventilation shafts and more (refer to scoping letter)
Cabonne Shire+1 moreGA-58526957
Determination
McPhillamys Gold Project
Development of an open cut mine and water supply pipeline.
Blayney Shire+3 moreSSD-9505
Determination
Cadia Continued Operations Project (CCOP)
Extension of the approved Cadia East Gold/Copper Project, including an extension to the existing Southern Tailings Storage and the Cadia East subsidence zone on land located outside of the mining leases held by CHPL that may be classified as BSAL.
Blayney Shire+1 moreGA-74105711
Determination
MOD 15 - Various including tailings dam embankment upgrade
Includes changes to tailings dam embankment footprint, infrastructure areas, development of the Ridgeway Mine, realignment of Panuara Road, new site access roads, tailings pilot plant, ventilation shafts and more (refer to scoping letter)
Cabonne Shire+1 moreMP06_0295-Mod-15
Determination
Flyers Creek Wind MOD 4 - Transmission & Turbine
The proposed modification involves: - an increase to the wind turbine envelope (including a 10 m increase in tip height); and - inclusion of a 132 kV transmission line and switching station to enable the Project to connect to the electrical grid
Blayney ShireMP08_0252-Mod-4
Determination
Flyers Creek Wind MOD 3 - Turbine Reduction
The proposed modification involves: - a reduction in the number of turbines from 42 to 38 and removal of associated land; - an alternative alignment for the approved 33 kilovolt (kv) overhead power line; and - minor changes to access tracks and un
Blayney ShireMP08_0252-Mod-3
Determination
Flyers Creek Wind MOD 2 - Flyers Creek Wind
The modification proposes: - Amendments to Condition B2(c) - A new condition related to the amendment to Condition B2(c) - Removal of approved transmission line from the wind farm substation to the electricity network from Flyers Creek Wind Farm
Blayney ShireMP08_0252-Mod-2
Determination
Flyers Creek Wind MOD 1 - Flyers Creek Wind
The Proponent requests that the time frame permitted for satisfaction of the Deferred Commencement Conditions in Schedule B is amended from 12 months to 24 months. CoC C5(a) will also need to be similarly amended.
Blayney ShireMP08_0252-Mod-1