Councils

Planning projects in Broken Hill City

33 State significant and State-assessed projects in Broken Hill City are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.

Open for submissions

Nothing in Broken Hill City is on exhibition right now. See everything open across NSW.

Recently assessed or decided

  • Withdrawn

    Copi Mineral Sands Project

    Develop a mineral sands mine & associated infrastructure, including extraction & processing of up to 45 Mtpa of ore via dredge mining for ~20 years, road transport of concentrate to Broken Hill for rail load out and progressive site rehabilitation.

    Wentworth Shire+1 moreSVC-58455712

  • Determination

    MOD 6 - Broken Hill Mineral Separation Plant

    Minor upgrades and reconfiguration of the mineral separation plant.

    Broken Hill CityDA345-11-01-Mod-6

  • Determination

    Mod 1

    Broken Hill City+1 moreMP08_0022-Mod-1

  • Determination

    MOD 8 - Mining Extension

    To extend underground mining across the project’s CML7 to mine a predefined region of ML1249 under a sub-lease arrangement with Perilya Broken Hill Limited (Southern Operations).

    Broken Hill CityMP07_0018-Mod-8

  • Determination

    Broken Hill North Project

    Recommencement of underground mining operations at the Broken Hill North Mine.

    Broken Hill CitySSD-7538

  • Determination

    MOD 9 - Extension of Underground Exploration

    To extend underground exploration in the Main Lode to Blocks 13 - 15 within the current Mining Lease (CML7), and install an emergency egress ladder way from Stockpile 1 (SP1) underground to the surface

    Broken Hill CityMP07_0018-Mod-9

  • Determination

    MOD 3 - Ore throughput increase

    Increase the ore throughput to 400,000 tpa, increase the upcast No. 3 Vent Rise ventilation rate to 275 m3/s and construct a 5-m high stack at its opening, and increase the average daily truck movements per calendar year to 21.

    Broken Hill CitySSD-7538-Mod-3

  • Determination

    MOD 7 - Sand Product and HMC Transfer System Changes

    Transport of sand product to Broken Hill and changes to the HMC rail unloading system

    Broken Hill CityDA345-11-01-Mod-7

  • Determination

    MOD 6 – New Tailing Storage Facility

    To use the Kintore Pit a a new tailing storage facility (TSF3), relocate the current mine portal, provide for future waste rock emplacement areas (currently stored in Kintore Pit), and provide for associated service facilities..

    Broken Hill CityMP07_0018-Mod-6

  • Determination

    Broken Hill Battery Energy Storage System

    Development of a 50 MW / 100 MWh battery energy storage facility with associated infrastructure.

    Broken Hill CitySSD-11437498

  • Determination

    MOD 1 - Transmission line connection and design

    Include the option of installing the Battery Energy Storage System (BESS) transmission line underground

    Broken Hill CitySSD-11437498-Mod-1

  • Determination

    Broken Hill MSP

    Broken Hill CityDA345-11-01

  • Determination

    MOD 8 - Ore Transport

    Transport of ore from Atlast-Campaspe mine

    Broken Hill CityDA345-11-01-Mod-8

  • Determination

    MOD 10 - Temporary tailings placement in TSF2

    Construction of a new intake vent and temporary placement of dried tailings in the tailings storage facility

    Broken Hill CityMP07_0018-Mod-10

  • Determination

    MOD 9 - Short Term Transport Route

    The receival of ore by a temporary alternative haulage route, due to unusable flooded roads.

    Broken Hill CityDA345-11-01-Mod-9

  • Determination

    MOD 11 - Ventilation Intake and Underground Exploration

    To install and use a new ventilation intake and further extend underground exploration in the Main Lode to Blocks 13 - 15 within the current Mining Lease (CML7).

    Broken Hill CityMP07_0018-Mod-11

  • Determination

    Broken Hill Solar Farm

    Development of a 53 MW solar farm and associated infrastructure.

    Broken Hill CityMP10_0202

  • Determination

    MOD7 - Additional Crushing and Screening

    To utilise rock fill material stored in BHP Pit for Blackwood Pit (TSF2) embankment construction; and conduct crushing and screen activities within BHP Pit

    Broken Hill CityMP07_0018-Mod-7

  • Determination

    Silverton Wind Farm

    Silverton Wind

    Broken Hill City+1 moreMP08_0022

  • Determination

    MOD 12 - Underground Mining Extension

    To extend underground mining activities in Main Lode (ML) Blocks 13, 14, 15 and 16.

    Broken Hill CityMP07_0018-Mod-12

  • Determination

    Rasp Lead/Zinc/Silver Project

    To develop an underground mine and associated infrastructure to extract 750,000 tonnes of ore per year until 2026, and transport ore concentrate by rail to Port Pirie in SA and Newcastle in NSW.

    Broken Hill CityMP07_0018

  • Determination

    Silver City Energy Storage System

    Development of a 200 MW / 1600 MWh advanced compressed air energy storage facility with associated infrastructure.

    Broken Hill City+1 moreSSD-47065463

  • Determination

    Rasp Mine MOD5 - Cement Transportation and Storage

    To construct a cement silo, import 5,000 tonnes of cement to the site, extend an existing warehouse and update the mine’s air quality monitoring requirements to be consistent with the Environment Protection Licence.

    Broken Hill CityMP07_0018-Mod-5

  • Determination

    Broken Hill North Mine MOD 1 - Haulage Route

    To amend the ore haulage route and reconfigure the approved evaporation ponds.

    Broken Hill CitySSD-7538-MOD-1

Search all 33 projects in Broken Hill City

Make your yarns count.