Planning projects in Broken Hill City
33 State significant and State-assessed projects in Broken Hill City are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Broken Hill City is on exhibition right now. See everything open across NSW.
Recently assessed or decided
Withdrawn
Copi Mineral Sands Project
Develop a mineral sands mine & associated infrastructure, including extraction & processing of up to 45 Mtpa of ore via dredge mining for ~20 years, road transport of concentrate to Broken Hill for rail load out and progressive site rehabilitation.
Wentworth Shire+1 moreSVC-58455712
Determination
MOD 6 - Broken Hill Mineral Separation Plant
Minor upgrades and reconfiguration of the mineral separation plant.
Broken Hill CityDA345-11-01-Mod-6
Determination
MOD 8 - Mining Extension
To extend underground mining across the project’s CML7 to mine a predefined region of ML1249 under a sub-lease arrangement with Perilya Broken Hill Limited (Southern Operations).
Broken Hill CityMP07_0018-Mod-8
Determination
Broken Hill North Project
Recommencement of underground mining operations at the Broken Hill North Mine.
Broken Hill CitySSD-7538
Determination
MOD 9 - Extension of Underground Exploration
To extend underground exploration in the Main Lode to Blocks 13 - 15 within the current Mining Lease (CML7), and install an emergency egress ladder way from Stockpile 1 (SP1) underground to the surface
Broken Hill CityMP07_0018-Mod-9
Determination
MOD 3 - Ore throughput increase
Increase the ore throughput to 400,000 tpa, increase the upcast No. 3 Vent Rise ventilation rate to 275 m3/s and construct a 5-m high stack at its opening, and increase the average daily truck movements per calendar year to 21.
Broken Hill CitySSD-7538-Mod-3
Determination
MOD 7 - Sand Product and HMC Transfer System Changes
Transport of sand product to Broken Hill and changes to the HMC rail unloading system
Broken Hill CityDA345-11-01-Mod-7
Determination
MOD 6 – New Tailing Storage Facility
To use the Kintore Pit a a new tailing storage facility (TSF3), relocate the current mine portal, provide for future waste rock emplacement areas (currently stored in Kintore Pit), and provide for associated service facilities..
Broken Hill CityMP07_0018-Mod-6
Determination
Broken Hill Battery Energy Storage System
Development of a 50 MW / 100 MWh battery energy storage facility with associated infrastructure.
Broken Hill CitySSD-11437498
Determination
MOD 1 - Transmission line connection and design
Include the option of installing the Battery Energy Storage System (BESS) transmission line underground
Broken Hill CitySSD-11437498-Mod-1
Determination
MOD 8 - Ore Transport
Transport of ore from Atlast-Campaspe mine
Broken Hill CityDA345-11-01-Mod-8
Determination
MOD 10 - Temporary tailings placement in TSF2
Construction of a new intake vent and temporary placement of dried tailings in the tailings storage facility
Broken Hill CityMP07_0018-Mod-10
Determination
MOD 9 - Short Term Transport Route
The receival of ore by a temporary alternative haulage route, due to unusable flooded roads.
Broken Hill CityDA345-11-01-Mod-9
Determination
MOD 11 - Ventilation Intake and Underground Exploration
To install and use a new ventilation intake and further extend underground exploration in the Main Lode to Blocks 13 - 15 within the current Mining Lease (CML7).
Broken Hill CityMP07_0018-Mod-11
Determination
Broken Hill Solar Farm
Development of a 53 MW solar farm and associated infrastructure.
Broken Hill CityMP10_0202
Determination
MOD7 - Additional Crushing and Screening
To utilise rock fill material stored in BHP Pit for Blackwood Pit (TSF2) embankment construction; and conduct crushing and screen activities within BHP Pit
Broken Hill CityMP07_0018-Mod-7
Determination
MOD 12 - Underground Mining Extension
To extend underground mining activities in Main Lode (ML) Blocks 13, 14, 15 and 16.
Broken Hill CityMP07_0018-Mod-12
Determination
Rasp Lead/Zinc/Silver Project
To develop an underground mine and associated infrastructure to extract 750,000 tonnes of ore per year until 2026, and transport ore concentrate by rail to Port Pirie in SA and Newcastle in NSW.
Broken Hill CityMP07_0018
Determination
Silver City Energy Storage System
Development of a 200 MW / 1600 MWh advanced compressed air energy storage facility with associated infrastructure.
Broken Hill City+1 moreSSD-47065463
Determination
Rasp Mine MOD5 - Cement Transportation and Storage
To construct a cement silo, import 5,000 tonnes of cement to the site, extend an existing warehouse and update the mine’s air quality monitoring requirements to be consistent with the Environment Protection Licence.
Broken Hill CityMP07_0018-Mod-5
Determination
Broken Hill North Mine MOD 1 - Haulage Route
To amend the ore haulage route and reconfigure the approved evaporation ponds.
Broken Hill CitySSD-7538-MOD-1