Planning projects in Cabonne Shire
39 State significant and State-assessed projects in Cabonne Shire are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Cabonne Shire is on exhibition right now. See everything open across NSW.
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Mullion Creek Wind Farm
Development of a wind farm with up to 33 wind turbines and associated infrastructure.
Cabonne Shire+1 moreSSD-100739958
Prepare EIS
Cadia Continued Operations Project (CCOP)
Extension of the approved Cadia East Gold/Copper Project, including an extension to the existing Southern Tailings Storage Facility
Blayney Shire+1 moreSSD-71290981
Prepare EIS
Four Mile Creek Wind Farm
Development of a wind farm with up to 21 wind turbines and associated infrastructure.
Cabonne ShireSSD-100738458
Prepare EIS
McPhillamys Electricity Transmission Line
Development of an electricity transmission line (ETL) to connect the McPhillamys Gold Project (SSD-9505) to the electricity grid.
Blayney Shire+2 moreSSI-99421458
Recently assessed or decided
Withdrawn
MOD 15 - Various including tailings dam embankment upgrade
Includes changes to tailings dam embankment footprint, infrastructure areas, development of the Ridgeway Mine, realignment of Panuara Road, new site access roads, tailings pilot plant, ventilation shafts and more (refer to scoping letter)
Cabonne Shire+1 moreGA-58523959
Withdrawn
MOD 15 - Various including tailings dam embankment upgrade
Includes changes to tailings dam embankment footprint, infrastructure areas, development of the Ridgeway Mine, realignment of Panuara Road, new site access roads, tailings pilot plant, ventilation shafts and more (refer to scoping letter)
Cabonne Shire+1 moreGA-58522711
Withdrawn
Cadia Continued Operations Project (CCOP)
Extension of the approved Cadia East Gold/Copper Project, including an extension to the existing Southern Tailings Storage Facility
Blayney Shire+1 moreGA-73942707
Withdrawn
MOD 1 - Layout Optimisation
Layout changes to optimise the project’s construction and operation and incorporate the 132 kV electricity transmission line into the project.
Blayney Shire+3 moreSSD-9505-Mod-1
Determination
MOD 13 - Cadia Hill Tailings Completion
Increase tailings level of Cadia Hill open pit to full capacity (approx. 177Mt over 7 yrs), decommission vent adit VR101 & install new vent adit and construct additional buttressing for the STSF embankment.
Cabonne Shire+1 moreMP06_0295-Mod-13
Determination
MOD 5 - Increase easement corridor
Increase the maximum width of a section of the cleared easement corridor from 45m to 70m and minor realignment of the 132kV power line route.
Blayney Shire+1 moreMP08_0252-Mod-5
Determination
MOD 14 - Increased Processing Rate
Includes increasing ore processing rate from 32 Mtpa to 35 Mtpa, upgrading ore processing infrastructure & Southern Tailings Storage Facility (TSF), repairing/using the Northern TSF, constructing/using a Sodium Hydrosulphide Production Plant on-site.
Cabonne ShireMP06_0295-Mod-14
Determination
MOD 15 - Various including tailings dam embankment upgrade
Includes changes to tailings dam embankment footprint, infrastructure areas, development of the Ridgeway Mine, realignment of Panuara Road, new site access roads, tailings pilot plant, ventilation shafts and more (refer to scoping letter)
Cabonne Shire+1 moreGA-58526957
Determination
McPhillamys Gold Project
Development of an open cut mine and water supply pipeline.
Blayney Shire+3 moreSSD-9505
Determination
Cadia Continued Operations Project (CCOP)
Extension of the approved Cadia East Gold/Copper Project, including an extension to the existing Southern Tailings Storage and the Cadia East subsidence zone on land located outside of the mining leases held by CHPL that may be classified as BSAL.
Blayney Shire+1 moreGA-74105711
Determination
MOD 15 - Various including tailings dam embankment upgrade
Includes changes to tailings dam embankment footprint, infrastructure areas, development of the Ridgeway Mine, realignment of Panuara Road, new site access roads, tailings pilot plant, ventilation shafts and more (refer to scoping letter)
Cabonne Shire+1 moreMP06_0295-Mod-15
Determination
Manildra Solar Farm
Development of a 50 MW solar farm and associated infrastructure.
Cabonne ShireMP10_0122
Determination
MOD 17 - Confirmation of Approved Disturbance Footprint
Confirmation of approved disturbance footprint.
Cabonne ShireMP06_0295-Mod-17
Determination
Cadia East Gold/Copper Project
To develop an open cut mine and associated infrastructure to extract approximately 562 million tonnes of gold and copper ore until 2031.
Cabonne ShireMP06_0295