Planning projects in Camden
60 State significant and State-assessed projects in Camden are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Camden is on exhibition right now. See everything open across NSW.
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Mixed Use at Rickard Road & Byron Road, Leppington
Concept plan and Stage 1 works for a mixed use development comprising of 1500 dwellings (5% for affordable housing), commercial/retail floor space and open space
CamdenSSD-119567490
Prepare EIS
Seniors Living at 79 Rickard Road, Leppington
A seniors living development comprising independent living units, assisted living units, communal and resident amenity areas, landscaped open space, basement car parking, infrastructure works and associated public domain upgrades.
CamdenSSD-129401254
Prepare EIS
Residential development at 99 Byron Rd, Leppington
Staged development: 1. Subdivide to create 5 super lots and infrastructure 2. Subdivide 4 super lots to accommodate 37 dwellings 3. Construct 8 storey residential building with 108 units (10% affordable housing) on 1 super lot
CamdenSSD-128256739
Prepare EIS
Dwyer Road Secondary School (Concept Proposal and Stages 1 and 2 works)
Concept Proposal for a new secondary school, with six two-storey building envelopes for 600 students, with detailed Stages 1 and 2 works comprising three school buildings, open space, landscaping, parking and circulation for up to 300 students
CamdenSSD-82967209
Prepare EIS
Mixed Use Development 297 & 307 Bringelly Road
Construction of mixed use development, in stages, comprising mixed use towers ranging from 4 – 23 storeys, 3 – 4 levels of basement parking, ground floor commercial premises. 966 Dwellings with 5% affordable in perpetuity.
CamdenSSD-133031492
Prepare EIS
122 Dickson Road Leppington
Concept application with stage one for a build-to-rent development. Stage one comprises dwellings, basement parking and landscaping to part of the site.
CamdenSSD-94455963
Prepare EIS
Macarthur FC Sports College
Special sports focused High School and centre-based child care facility
CamdenSSD-101021958
Recently assessed or decided
Withdrawn
Brownlow Hill Sustainability Park
To construct and operate a facility to receive and process 370,000 tonnes per year of C&D waste and organic waste and continue to extract 50,000 tpa of sandstone.
Wollondilly Shire+1 moreSSD-10372
Withdrawn
Modification 3 Modificaiton 3 Oran Park High School and Public School (Mod 3)
Amendments to administrative errors within the consent
CamdenSSD-7968-Mod-3
Withdrawn
Harrington Park Public School Redevelopment
Alterations and additions to the existing public school to accommodate an additional 184 new students and refurbish of the school's existing infrastructure.
CamdenSSD-9478
Withdrawn
Amity College, Leppington - Modification 1
Modification to the approved Amity College new school campus in Leppington involving amendments to the project staging to bring forward the timing and delivery of the school.
CamdenSSD-9227-Mod-1
Withdrawn
52 Turner Road Data Centre
Construction and operation of a data centre with a capacity of 40 MW including emergency back-up generators, cooling plant, diesel and lithium ion battery storage, substation and associated infrastructure.
CamdenSSD-60185233
Withdrawn
Leppington Mixed-Use Precinct -173-183 Rickard Rd
Mixed Use Development comprising 27,000sqm of Retail/Commercial floor space, 1,554 Dwellings, including 100 affordable houses, 200 Room Hotel and 7,000 sqm of public open space.
CamdenSSD-81995211
Withdrawn
Concept and Stage 1 - mixed use development Leppington
Concept plan for mixed-use development with civic amenities, commercial, retail and residential uses, including infill affordable housing.
CamdenSSD-69507469
Determination
New Catherine Field Primary School
The development of a new public primary school to accommodate up to 1,000 students including 44 classrooms, a hall, an administration/staff centre, library resource centre, amenities and storage, staff car parking and site services.
CamdenSSD-9477
Determination
Camden Medical Campus (Concept)
Concept development application for the establishment of the Camden Medical Campus.
CamdenSSD-7387
Determination
New Primary School at Gregory Hills
Construction of a new primary school comprising one and three storey buildings, outdoor play spaces, parking and associated works.
CamdenSSD-41306367
Determination
Amity College New School Campus
Proposed new school comprising a 3-stream primary school and a 3-stream secondary school with a maximum capacity of 1,000 students.
CamdenSSD-9227
Determination
Minarah College
The amended proposal involves the staged operation and construction of a new school and an Early Learning Centre, catering for up to 980 students in Kindergarten to Year 12 in Catherine Field
CamdenSSD-30759158
Make your yarns count.
Build a campaign, share with your community, and see the results.