Planning projects in Cootamundra-Gundagai Regional

10 State significant and State-assessed projects in Cootamundra-Gundagai Regional are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.

Open for submissions

Nothing in Cootamundra-Gundagai Regional is on exhibition right now. See everything open across NSW.

Coming up for exhibition

These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.

  • Prepare EIS

    CLARA Energy Project Rosedale

    Construction and operation of a green hydrogen production facility, comprised of: - hydrogen production, liquefaction, compression, storage and wholesale distribution - 250MW solar farm - water treatment plant - supplementary power supply

    Cootamundra-Gundagai RegionalSSD-60657974

  • Prepare EIS

    Cootamundra Abattoir Expansion

    Cootamundra Abattoir Expansion

    Cootamundra-Gundagai RegionalSSD-83696209

  • Prepare EIS

    Saddletop Wind Farm

    The construction, operation and decommissioning of a wind farm with up to 123 turbines and ancillary infrastructure.

    Cootamundra-Gundagai Regional+2 moreSSD-96381708

  • Prepare EIS

    Bondo Wind Farm

    Neoen seeks to construct up to 149 wind turbine generators (WTGs), with an electricity generation capacity of approximately 1.2 gigawatts (GW). Along with two BESS infrastructure both with a capacity of 400 MW / 1600 MWh.

    Snowy Valleys+2 moreSSD-86276211

Recently assessed or decided

  • Withdrawn

    Jeremiah Wind Farm

    Development of a 65 turbine wind farm with a maximum tip height of 300m, battery energy storage system and associated ancillary infrastructure

    Cootamundra-Gundagai RegionalSSD-22472709

  • Determination

    Young - Wagga Wagga Gas Pipeline - Stage 2

    Young - Wagga Pipeline - Stage 2

    Cootamundra-Gundagai Regional+3 moreMP10_0163

  • Determination

    Inland Rail Illabo to Stockinbingal

    Construction and operation of around 37 kilometers of single track railway from Illabo to Stockinbingal, including one crossing loop, to accommodate double stacked freight trains.

    Junee Shire+1 moreSSI-9406

  • Determination

    HumeLink

    Development of new transmission lines between the existing substations at Wagga Wagga and Bannaby and the proposed Maragle substation, and a new substation at Gugaa.

    Wagga Wagga City+5 moreSSI-36656827

  • Determination

    I2S Modification 1 Public level crossings

    Inland Rail proposes to modify condition E88 of the infrastructure approval so that the design of any public level crossing requires consultation with, rather than endorsement by, the relevant road authority.

    Junee Shire+1 moreSSI-9406-Mod-1

  • Determination

    Modification 1 Strategic Offset Delivery Agreement

    Modification to allow the project to meet its biodiversity offset obligation via delivery of a Strategic Offset Delivery Agreement (SODA).

    Wagga Wagga City+5 moreSSI-36656827-Mod-1