Planning projects in Forbes Shire
21 State significant and State-assessed projects in Forbes Shire are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Forbes Shire is on exhibition right now. See everything open across NSW.
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Forbes Nutrient Return Centre
Expansion of existing facility to permit 90,000 tpa waste receival including food and garden organics, animal waste, manure and biosolids. Construction of new processing shed, composting bunkers, anaerobic digestion plant, and biogas power generation
Forbes ShireSSD-144801990
Recently assessed or decided
Determination
Mod 7 - Design Changes
Changes to mine sequencing, process plant, accommodation camp and rail siding
Forbes Shire+2 moreDA374-11-00-Mod-7
Determination
Jemalong Solar Farm
Development of a 50 MW solar farm and associated infrastructure.
Forbes ShireSSD-8803
Determination
Peninsula Solar Farm
Development of an 80 MW solar farm with battery storage and associated infrastructure.
Forbes ShireSSD-14757962
Determination
Daroobalgie Solar Farm
Development of a 100 MW solar farm with energy storage and associated infrastructure.
Forbes ShireSSD-10387
Determination
Central West Pipeline (Marsden to Dubbo)
Development for the purpose of the construction and operation of a pipeline to convey natural gas known as the ‘PL25 - Central West Pipeline (Marsden to Dubbo)' authorised under Licence No.25 (granted on 1 October 1997)
Dubbo Regional+3 moreSSI-71022719
Determination
Peninsula Solar Farm: Mod 1 Traffic and Transport Route
Changes to access route and road upgrades.
Forbes ShireSSD-14757962-Mod-1
Determination
MOD 1 - Administrative Change
Administrative change to condition B45
Bland Shire+1 moreSSD-42917792-Mod-1
Determination
Jemalong Solar Farm Modification 4
Minor extension of the development footprint to enable the construction of minor drainage works necessary to reduce waterlogging and improve the success of the landscape screening required by Schedule 3- Condition 10.
Forbes ShireSSD-8803-Mod-4
Determination
Cowal Gold Operations Open Pit Continuation
Continuation of open cut mining with extension of E42 pit and development of three new open cut pits, extension of mine life to 2042 and continuation of ore processing at a rate of 9.8 Mtpa.
Bland Shire+1 moreSSD-42917792
Determination
Jemalong Solar MOD 1 - Subdivision Changes
Administrative modification to amend the subdivision plan for the project site.
Forbes ShireSSD-8803-MOD-1
Determination
Sunrise Nickel/Cobalt MOD 5 - Hazard Studies Timing
/
Forbes Shire+2 moreDA374-11-00-Mod-5
Prepare Mod Report
Cowal Mine MOD 2 - Mine Plan Optimisation
Mine Plan Optimisation
Bland Shire+1 moreSSD-42917792-Mod-2
Response to Submissions
MOD 8 - Scandium Optimisation
Changes to the mine layout for the initial scandium mining phase.
Forbes Shire+2 moreDA374-11-00-Mod-8
Assessment
Forbes Solar Farm
The construction, operation and decommissioning of a 166 MW solar farm, an associated battery energy storage system (BESS) with a capacity 120 MW/960 MWh, and ancillary infrastructure.
Forbes ShireSSD-72383210