  • Prepare EIS

    Kilnacroft Creek Battery Energy Storage System

    Construction, operation and decommissioning of a BESS with a capacity of 500 MW / 2,000 MWh and ancillary infrastructure

    Greater Hume ShireSSD-92160209

  • Prepare EIS

    Morven Solar Farm

    Development of an 125 MW solar farm with battery storage and associated infrastructure.

    Greater Hume ShireSSD-77462747

Recently assessed or decided

  • Withdrawn

    Mod 1 - Ladysmith Road Quarry

    Greater Hume Shire+1 moreMP08_0139-Mod-1

  • Withdrawn

    Morven Solar Farm

    Development of an 125 MW solar farm with battery storage and associated infrastructure.

    Greater Hume ShireSSD-77404459

  • Determination

    MOD 1 - Panel Height Increase

    Modification to increase the solar panel height from 4 m to 4.85 m and revision to HV access route for construction of substation.

    Greater Hume ShireSSD-9874-Mod-1

  • Determination

    MOD 2 - Project Layout Changes

    Changes to project layout to increase solar array within the existing development footprint and additional creek crossing, and increases to vegetation clearing within site (0.15 ha) and maximum daily truck numbers (from 45 to 110).

    Greater Hume ShireSSD-9874-Mod-2

  • Determination

    Walla Walla Solar Farm

    Development of a 300 MW solar farm and associated infrastructure.

    Greater Hume ShireSSD-9874

  • Determination

    Modification 1 - Underground Transmission Line

    Changes to project, including substitution of approved overhead transmission line with new underground transmission line.

    Greater Hume ShireSSD-9549-Mod-1

  • Determination

    MOD 1 Road widening and realignment

    Alignment revision and widening of the development footprint along Weeamera Road, widening of two creek crossings and amendments to heavy vehicle condition and definitions.

    Greater Hume ShireSSD-10288-Mod-1

  • Determination

    Glenellen Solar Farm

    Development of a 200 MW solar farm and associated infrastructure.

    Greater Hume ShireSSD-9550

  • Determination

    Culcairn Solar Farm

    350 megawatt solar farm with energy storage and associated infrastructure.

    Greater Hume ShireSSD-10288

  • Determination

    Glenellen Solar Modification 1 Minor section 4.55(1) amendments

    Modification to correct minor errors in consent

    Greater Hume ShireSSD-9550-Mod-1

  • Determination

    Culcairn Solar Farm MOD 2: BESS size increase

    Increase capacity of the approved battery energy storage system to 350 MW / 800 MWh.

    Greater Hume ShireSSD-10288-Mod-2

  • Determination

    MOD 2-Transgrid access

    Change to the development area to include an access road from the TransGrid Jindera Zone Substation to the Glenellen Solar Farm Collector Substation.

    Greater Hume ShireSSD-9550-Mod-2

  • Determination

    Inland Rail - Albury to Illabo

    Enhancement works to structures and sections of track along 185 kilometres of existing operational standard gauge rail from the Victorian/New South Wales border to Illabo in regional NSW. The project forms part of the Inland Rail project.

    Albury City+4 moreSSI-10055

  • Determination

    Jindera Solar Farm

    Development of a 120 MW solar farm with energy storage and associated infrastructure.

    Greater Hume ShireSSD-9549

  • Determination

    Albury to Illabo MOD 1 - Kemp Street Bridge

    Revisions to the approved Kemp Street Bridge at Junee, to now provide a single, integrated road and pedestrian bridge.

    Junee Shire+4 moreSSI-10055-Mod-1

  • Assessment

    Jindera Battery Energy Storage System

    Construction, operation and decommissioning of a Battery Energy Storage System (BESS) with a capacity of 250 megawatts (MW) / 500 megawatt hours (MWh), as well as associated infrastructure.

    Greater Hume ShireSSD-68815961