Planning projects in Greater Hume Shire
18 State significant and State-assessed projects in Greater Hume Shire are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Greater Hume Shire is on exhibition right now. See everything open across NSW.
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Kilnacroft Creek Battery Energy Storage System
Construction, operation and decommissioning of a BESS with a capacity of 500 MW / 2,000 MWh and ancillary infrastructure
Greater Hume ShireSSD-92160209
Prepare EIS
Morven Solar Farm
Development of an 125 MW solar farm with battery storage and associated infrastructure.
Greater Hume ShireSSD-77462747
Recently assessed or decided
Withdrawn
Morven Solar Farm
Development of an 125 MW solar farm with battery storage and associated infrastructure.
Greater Hume ShireSSD-77404459
Determination
MOD 1 - Panel Height Increase
Modification to increase the solar panel height from 4 m to 4.85 m and revision to HV access route for construction of substation.
Greater Hume ShireSSD-9874-Mod-1
Determination
MOD 2 - Project Layout Changes
Changes to project layout to increase solar array within the existing development footprint and additional creek crossing, and increases to vegetation clearing within site (0.15 ha) and maximum daily truck numbers (from 45 to 110).
Greater Hume ShireSSD-9874-Mod-2
Determination
Walla Walla Solar Farm
Development of a 300 MW solar farm and associated infrastructure.
Greater Hume ShireSSD-9874
Determination
Modification 1 - Underground Transmission Line
Changes to project, including substitution of approved overhead transmission line with new underground transmission line.
Greater Hume ShireSSD-9549-Mod-1
Determination
MOD 1 Road widening and realignment
Alignment revision and widening of the development footprint along Weeamera Road, widening of two creek crossings and amendments to heavy vehicle condition and definitions.
Greater Hume ShireSSD-10288-Mod-1
Determination
Glenellen Solar Farm
Development of a 200 MW solar farm and associated infrastructure.
Greater Hume ShireSSD-9550
Determination
Culcairn Solar Farm
350 megawatt solar farm with energy storage and associated infrastructure.
Greater Hume ShireSSD-10288
Determination
Glenellen Solar Modification 1 Minor section 4.55(1) amendments
Modification to correct minor errors in consent
Greater Hume ShireSSD-9550-Mod-1
Determination
Culcairn Solar Farm MOD 2: BESS size increase
Increase capacity of the approved battery energy storage system to 350 MW / 800 MWh.
Greater Hume ShireSSD-10288-Mod-2
Determination
MOD 2-Transgrid access
Change to the development area to include an access road from the TransGrid Jindera Zone Substation to the Glenellen Solar Farm Collector Substation.
Greater Hume ShireSSD-9550-Mod-2
Determination
Inland Rail - Albury to Illabo
Enhancement works to structures and sections of track along 185 kilometres of existing operational standard gauge rail from the Victorian/New South Wales border to Illabo in regional NSW. The project forms part of the Inland Rail project.
Albury City+4 moreSSI-10055
Determination
Jindera Solar Farm
Development of a 120 MW solar farm with energy storage and associated infrastructure.
Greater Hume ShireSSD-9549
Determination
Albury to Illabo MOD 1 - Kemp Street Bridge
Revisions to the approved Kemp Street Bridge at Junee, to now provide a single, integrated road and pedestrian bridge.
Junee Shire+4 moreSSI-10055-Mod-1
Assessment
Jindera Battery Energy Storage System
Construction, operation and decommissioning of a Battery Energy Storage System (BESS) with a capacity of 250 megawatts (MW) / 500 megawatt hours (MWh), as well as associated infrastructure.
Greater Hume ShireSSD-68815961