Planning projects in Griffith City
22 State significant and State-assessed projects in Griffith City are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Griffith City is on exhibition right now. See everything open across NSW.
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Griffith Bio-hub
Construction and operation of a bioenergy facility utilising anaerobic digestion technology to process up to 120,000 tpa of organic waste to produce biomethane for injection into the Jemena gas network.
Griffith CitySSD-80270726
Prepare EIS
Myall Park Broiler Farm
Construction and operation of three new poultry broiler farms with the capacity to accommodate up to 4,636,800 birds.
Carrathool Shire+1 moreSSD-116563990
Recently assessed or decided
Withdrawn
Mod 3 - Green Travel Plan Modifications
Modification of Conditions D19, E9 and E12 of the consent which require a detailed Green Travel Plan (GTP) and its annual update, and landscaping maintenance as per the Landscape Management Plan.
Griffith CitySSD-9838218-Mod-3
Determination
Mod 1 - Offset Strategy
Modification application for the amendment of condition 45 of the project approval to reduce the area of land required to be included in the biodiversity offset for the project.
Griffith CityMP06_0334-Mod-1
Determination
Tharbogang Quarry & Waste Facility
Extending the existing quarry to the south-east (pits 101 and 103); extracting, processing and transporting between 150,000 and 315,000 tonnes of quarry product by road per year, for up to 25 years; extending the landfill operations into the existing
Griffith CityMP06_0334
Determination
Griffith Base Hospital Redevelopment
The proposal includes the construction of a new four-storey hospital building, demolition of remaining buildings vacated after commissioning of the new hospital, site works including roads and on-grade car parking, landscaping and signage.
Griffith CitySSD-9838218
Determination
Modification 5 Minor change to Building 35 entry
Minor refinements to the entrance of Building 35 including retention of a blade wall, a door change and revised form for the awning.
Griffith CitySSD-9838218-Mod-5
Determination
Griffith Solar MOD 3 - Griffith Solar
Modification to temporarily allow construction vehicle access on an alternate route, prior to completion of road upgrades on the approved access route.
Griffith CitySSD-6604-MOD-3
Determination
Griffith Solar MOD 2 - Griffith Solar
Change in a site access point, construction of internal access road and construction of an access way.
Griffith CitySSD-6604-MOD-2
Determination
Griffith Solar MOD 1 - Griffith Solar
Removal of one site access point and construction of internal access roads.
Griffith CitySSD-6604-MOD-1
Determination
Griffith Hospital Redev MOD 1 - Design changes
This modification application seeks consent for modifications including to plant services, façade articulation and detail, the removal of a Eucalyptus tree (tree 170) and the construction of a concrete hardstand for use by fire brigade trucks.
Griffith CitySSD-9838218-Mod-1
Determination
Griffith Hospital Redev MOD 2 - Bld 35 retention
Retention of Building No.35 (Paediatric Building) and changes to its entry, requiring a minor reconfiguration of the parking layout and landscaping.
Griffith CitySSD-9838218-Mod-2
Determination
Griffith Hospital Redev MOD 4 - GTP & landscaping
Modification of conditions D19, E9 and E12 regarding the green travel plan requirements and its annual update, and landscaping maintenance as per the Landscape Management Plan.
Griffith CitySSD-9838218-Mod-4
Determination
De Bortoli Winery MOD 2 - Waste Water Utilisation
The Applicant is seeking to increase the approved waste water utilisation area (WWUA), implement a WWUA rotation plan, install associated infrastructure, construct a warehouse and install fire water tanks.
Griffith CityMP05_0080-Mod-2
Determination
Tharbogang Quarry & Landfill MOD 2 - Design
Change in capping and gas management design of the Existing Landfill Design changes to the existing quarry which will become the new landfill Change in the sequencing of the new quarry pits Removal of green waste from the waste stream.
Griffith CityMP06_0334-Mod-2
Recommendation
Tharbogang Quarry and Landfill MOD 4 - Annual landfilling tonnage increase
Increase yearly landfilling rate from 35,000 tonnes/year to 50,000 t/yr, and amend the consent to permit 22 years of operation from when landfilling in new cells commences (approx. 2027)
Griffith CityMP06_0334-Mod-4
Assessment
Modification 5 - Landfill Gas Management System
Installation and operation of a landfill gas extraction system for use in electricity generation and flaring
Griffith CityMP06_0334-Mod-5
Assessment
Griffith Battery Energy Storage System
Development of a 100 MW / 1000 MWh battery storage system and associated infrastructure including grid connection.
Griffith CitySSD-85372970
Make your yarns count.