Planning projects in Hay Shire
13 State significant and State-assessed projects in Hay Shire are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Hay Shire is on exhibition right now. See everything open across NSW.
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Abercrombie Wind Farm
The project would involve the construction, operation and maintenance and decommissioning of a new wind farm with up to 348 wind turbine generators, associated infrastructure, and battery energy storage systems.
Hay Shire+1 moreSSD-77340978
Prepare EIS
Wilan Wind Farm
Development of a wind farm with up to 138 wind turbines, energy storage and associated infrastructure.
Murray River+1 moreSSD-51306206
Recently assessed or decided
Withdrawn
The Plains Solar Farm
Development of a 400 MW solar farm with energy storage and associated infrastructure.
Hay ShireSSD-51219280
Determination
MOD 2 - Battery Storage Facility
Development of a 29MW/29MWh battery storage facility.
Hay ShireSSD-8113-Mod-2
Determination
MOD 1 - Site Access Upgrades
Modification to allow construction to commence at the northern portion of the project prior to completing the southern access point and intersection upgrade on the Mid Western Highway.
Hay ShireSSD-8113-Mod-1
Determination
Project EnergyConnect (NSW - Eastern Section)
Development of a new transmission line connecting Buronga Substation and Wagga Wagga Substation, and construction of the new Dinawan Substation (170 km west of Wagga Wagga).
Wentworth Shire+8 moreSSI-9172452
Determination
MOD 1 - Extension of Offset Timing
Seeking to extend timing for provision of biodiversity offset package
Wentworth Shire+8 moreSSI-9172452-Mod-1
Determination
Pottinger Wind Farm
Construction and operation of a wind farm with up to 247 wind turbines, battery storage and associated infrastructure.
Edward River+1 moreSSD-59235464
Determination
Hay Solar Farm
Development of a large-scale solar photovoltaic (PV) generation facility and associated infrastructure with an estimated capacity of 110 megawatts (MW).
Hay ShireSSD-8113
Determination
Bullawah Wind Farm
Construction and operation of a wind farm with up to 141 wind turbines and associated infrastructure.
Hay Shire+2 moreSSD-50505215
Recommendation
Baldon Wind Farm
Construction and operation of a wind farm with up to 180 wind turbines, battery storage and associated infrastructure.
Murray River+2 moreSSD-40138508
Prepare Mod Report
MOD 3 - BESS Capacity Increase
Increase in BESS capacity from the approved 29 MW / 29 MWh to approximately 110 MW / 440 MWh.
Hay ShireSSD-8113-Mod-3
Assessment
The Plains Wind Farm
Development of a wind farm with up to 188 wind turbines and associated infrastructure
Hay ShireSSD-50629707