13 State significant and State-assessed projects in Hay Shire are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.

Open for submissions

Nothing in Hay Shire is on exhibition right now. See everything open across NSW.

Coming up for exhibition

These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.

  • Prepare EIS

    Abercrombie Wind Farm

    The project would involve the construction, operation and maintenance and decommissioning of a new wind farm with up to 348 wind turbine generators, associated infrastructure, and battery energy storage systems.

    Hay Shire+1 moreSSD-77340978

  • Prepare EIS

    Wilan Wind Farm

    Development of a wind farm with up to 138 wind turbines, energy storage and associated infrastructure.

    Murray River+1 moreSSD-51306206

Recently assessed or decided

  • Withdrawn

    The Plains Solar Farm

    Development of a 400 MW solar farm with energy storage and associated infrastructure.

    Hay ShireSSD-51219280

  • Determination

    MOD 2 - Battery Storage Facility

    Development of a 29MW/29MWh battery storage facility.

    Hay ShireSSD-8113-Mod-2

  • Determination

    MOD 1 - Site Access Upgrades

    Modification to allow construction to commence at the northern portion of the project prior to completing the southern access point and intersection upgrade on the Mid Western Highway.

    Hay ShireSSD-8113-Mod-1

  • Determination

    Project EnergyConnect (NSW - Eastern Section)

    Development of a new transmission line connecting Buronga Substation and Wagga Wagga Substation, and construction of the new Dinawan Substation (170 km west of Wagga Wagga).

    Wentworth Shire+8 moreSSI-9172452

  • Determination

    MOD 1 - Extension of Offset Timing

    Seeking to extend timing for provision of biodiversity offset package

    Wentworth Shire+8 moreSSI-9172452-Mod-1

  • Determination

    Pottinger Wind Farm

    Construction and operation of a wind farm with up to 247 wind turbines, battery storage and associated infrastructure.

    Edward River+1 moreSSD-59235464

  • Determination

    Hay Solar Farm

    Development of a large-scale solar photovoltaic (PV) generation facility and associated infrastructure with an estimated capacity of 110 megawatts (MW).

    Hay ShireSSD-8113

  • Determination

    Bullawah Wind Farm

    Construction and operation of a wind farm with up to 141 wind turbines and associated infrastructure.

    Hay Shire+2 moreSSD-50505215

  • Recommendation

    Baldon Wind Farm

    Construction and operation of a wind farm with up to 180 wind turbines, battery storage and associated infrastructure.

    Murray River+2 moreSSD-40138508

  • Prepare Mod Report

    MOD 3 - BESS Capacity Increase

    Increase in BESS capacity from the approved 29 MW / 29 MWh to approximately 110 MW / 440 MWh.

    Hay ShireSSD-8113-Mod-3

  • Assessment

    The Plains Wind Farm

    Development of a wind farm with up to 188 wind turbines and associated infrastructure

    Hay ShireSSD-50629707