Planning projects in Leeton Shire
7 State significant and State-assessed projects in Leeton Shire are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Leeton Shire is on exhibition right now. See everything open across NSW.
Recently assessed or decided
Withdrawn
Murrami Solar Farm
Development of a 120 MW Solar Farm and associated infrastructure.
Leeton ShireSSD-10301
Withdrawn
MOD 1 - Panel Height Increase
Increasing the maximum height of solar panels from 2.2 m to 2.8 m, reducing the number of solar panels from 170,000 to 120,000 and burning of agricultural material to clear the land.
Leeton ShireSSD-9515-Mod-1
Determination
Yanco Solar Farm
Development of a 60 MW solar farm with energy storage and associated infrastructure.
Leeton ShireSSD-9515
Determination
Yanco Battery Energy Storage System
Development of a 250 MW / 1100 MWh battery energy storage system and associated infrastructure and connection works
Leeton ShireSSD-67478479
Determination
Yanco Battery Energy Storage System - Modification 1
Minor changes to the project layout.
Leeton ShireSSD-67478479-Mod-1
Response to Submissions
Comet Park Battery Energy Storage System
Development of a 150 MW / 600 MWh battery storage system and associated infrastructure including grid connection.
Leeton ShireSSD-76008209
Make your yarns count.
Build a campaign, share with your community, and see the results.