Councils

Planning projects in Leeton Shire

7 State significant and State-assessed projects in Leeton Shire are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.

Open for submissions

Nothing in Leeton Shire is on exhibition right now. See everything open across NSW.

Recently assessed or decided

  • Withdrawn

    Murrami Solar Farm

    Development of a 120 MW Solar Farm and associated infrastructure.

    Leeton ShireSSD-10301

  • Withdrawn

    Wumbulgal Solar Farm

    Leeton ShireSSD-7344

  • Withdrawn

    MOD 1 - Panel Height Increase

    Increasing the maximum height of solar panels from 2.2 m to 2.8 m, reducing the number of solar panels from 170,000 to 120,000 and burning of agricultural material to clear the land.

    Leeton ShireSSD-9515-Mod-1

  • Determination

    Yanco Solar Farm

    Development of a 60 MW solar farm with energy storage and associated infrastructure.

    Leeton ShireSSD-9515

  • Determination

    Yanco Battery Energy Storage System

    Development of a 250 MW / 1100 MWh battery energy storage system and associated infrastructure and connection works

    Leeton ShireSSD-67478479

  • Determination

    Yanco Battery Energy Storage System - Modification 1

    Minor changes to the project layout.

    Leeton ShireSSD-67478479-Mod-1

  • Response to Submissions

    Comet Park Battery Energy Storage System

    Development of a 150 MW / 600 MWh battery storage system and associated infrastructure including grid connection.

    Leeton ShireSSD-76008209

Make your yarns count.

Build a campaign, share with your community, and see the results.