Councils

Planning projects in Liverpool City

174 State significant and State-assessed projects in Liverpool City are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.

Open for submissions

Nothing in Liverpool City is on exhibition right now. See everything open across NSW.

Coming up for exhibition

These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.

  • SEARs

    Greendale Resource Recovery Facility

    Establishment of a resource recovery facility that will process up to 500,000 tonnes per year of waste and store no more than 100,000 tonnes of waste on site at any given time. The facility will accept non-putrescible solid waste and liquid waste.

    Liverpool CitySSD-9221

  • SEARs

    Airport Support Employment Campus

    Concept proposal for x3 building envelopes supporting manufacturing, hotel, airport shuttle, hire-car and office uses. Stage 1 comprises site preparation, civil and road infrastructure works, and construction of Building A (manufacturing warehouse).

    Liverpool CitySSD-152840242

  • SEARs

    Ingham Battery Energy Storage System

    Construction, operation and decommissioning of a Battery Energy Storage System (BESS) with an up to 40 Megawatt (MW) maximum power output capacity with 6-hour duration (240 MWh) and ancillary infrastructure.

    Liverpool CitySSD-148005990

  • Prepare EIS

    Badgerys Creek Waste Transfer Station

    Construction of a new waste transfer station building, plant maintenance workshop, staff office and amenities and use as a waste transfer station processing up to 300,000 tonnes per year putrescible General Solid Waste, FOGO and wood waste.

    Liverpool CitySSD-82437463

  • Prepare EIS

    Mixed Use Development at 8 Hoxton Park Road

    Demolition of existing industrial commercial buildings and construction of shop top housing consisting of approximately 202 units and ground floor retail with associated basement parking.

    Liverpool CitySSD-124954241

  • Prepare EIS

    Kemps Creek Cemetery Expansion

    Expansion of Kemps Creek Cemetery, including 8000 additional burial plots.

    Liverpool CitySSD-134185740

  • Prepare EIS

    60 Kelvin Park Drive, Bradfield

    The proposal includes the subdivision of two lots and construction of eight residential buildings incorporating ground floor retail and commercial uses.

    Liverpool CitySSD-74765211

  • Prepare EIS

    1320 The Northern Road, Bradfield

    Mixed use development with affordable in-fill housing

    Liverpool CitySSD-141908742

  • Prepare EIS

    170 Willmington Road, Luddenham - Subdivision

    Demolition of existing structures, dam dewatering, bulk earthworks, construction of roads and stormwater infrastructure, site servicing, and staged Torrens title subdivision into eight lots

    Liverpool CitySSD-136558240

  • Prepare EIS

    Shop Top Housing with Infill affordable housing - Edmondson Park

    Three x 8-storey buildings comprising residential flat buildings and shop top housing with 229 apartments with 15% affordable housing, non-residential uses and construction of road infrastructure to facilitate future street network.

    Liverpool CitySSD-93017956

  • Prepare EIS

    Project Velocity – Precinct 3 (Stage 1)

    Proposed site-wide preparation works, infrastructure works and subdivision, as well as construction and operation of a warehouse or distribution centre on Lot 1.

    Liverpool CitySSD-129689490

  • Prepare EIS

    Rossmore Primary School

    New Rossmore Primary School and ELC

    Liverpool CitySSD-143475994

  • Prepare EIS

    Airlink Estate

    Site-wide earthworks, roads and stormwater infrastructure, site servicing, and the staged construction and operation of one office building and four warehouse buildings with ancillary offices, car parking, landscaping and signage,

    Liverpool CitySSD-136138491

  • Prepare EIS

    Project Velocity – Precinct 2

    Site-wide earthworks, demolition and dam decommissioning, construction of internal roads, subdivision, and construction and operation of three warehouse buildings, including one temperature-controlled warehouse, and ancillary offices

    Liverpool CitySSD-144127742

  • Prepare EIS

    Early Works at Lots 4,5 and 8 Buchan Ave, Edmondson Park

    Early works to support HDA EOI 232588 and EOI 246574 including bulk earthworks

    Liverpool CitySSD-118365241

  • Prepare EIS

    Mixed Use Development 2 Old Kurrajong Rd and 1 Kurrajong Rd Casula

    Mixed Use and Residential Development comprising 637 dwellings with 209 dwellings proposed in Stage 1 and 428 in concept Stage 2

    Liverpool CitySSD-108460708

  • Prepare EIS

    Steel Processing Facility, Bradfield

    Construction and operation of a steel processing facility.

    Liverpool CitySSD-81301710

  • Prepare EIS

    Ferndale Industrial Precinct - Stages 2 and 3

    Construction and operation of two warehouse and distribution centres with ancillary office space; site preparation works and and bulk earthworks; construction of roads, stormwater infrastructure and services; and subdivision

    Liverpool CitySSD-99320494

  • Prepare EIS

    126 Kelvin Park Drive, Bringelly

    Liverpool CitySSD-66919458

  • Prepare EIS

    Bradfield City, Affordable Housing

    Construction of two infill affordable housing buildings comprising of 152 units, a child care facility and commercial premises on Lot B22 within the First Land Release of Bradfield City.

    Liverpool CitySSD-129936991

  • Prepare EIS

    320 Badgerys Creek Road - Warehouse Estate

    Concept proposal for an industrial estate with a Stage 1 development including site preparation and bulk earthworks, lot subdivision, roads, stormwater infrastructure, construction and operation of one warehouse building, carparking and landscaping.

    Liverpool CitySSD-113721746

  • Prepare EIS

    Ravenswood Cemetery

    The proposal is for a concept masterplan for a cemetery which would provide for up to 250,000 burial plots

    Liverpool City+1 moreSSD-50748212

  • Prepare EIS

    Project Velocity – Precinct 1 (Stage 1)

    Proposed site-wide preparation and infrastructure works, subdivision, and development of a cold-storage warehouse and distribution centre on Lot 1.

    Liverpool CitySSD-129744490

Recently assessed or decided

Search all 174 projects in Liverpool City

Make your yarns count.

Build a campaign, share with your community, and see the results.