Planning projects in Mid-Coast
46 State significant and State-assessed projects in Mid-Coast are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Mid-Coast is on exhibition right now. See everything open across NSW.
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Harrington Sewage Treatment Plant Upgrade
Upgrade of the Harrington Sewage Treatment Plant (STP), including construction and operation of new process and treatment infrastructure immediately south of the existing STP.
Mid-CoastSSI-136561743
Prepare EIS
6-12 Head Street, Forster
Demolition of the existing development and construction of a 10-storey hotel comprising approximately 157 guest rooms, with associated conference, hospitality, recreation and wellness facilities, basement parking, servicing and landscaping.
Mid-CoastSSD-143868241
Prepare EIS
Hawks Nest Minerals Sands Rehabilitation Project
Recovery of minerals from minerals waste stockpile
Mid-CoastSSD-55796721
Recently assessed or decided
Withdrawn
Pindimar Abalone Farm
A land-based abalone farm, including land-based tanks, sheds and ponds to accommodate the quarantine, breeding and growing out of 60 tonnes per annum (pa) of Haliotis rubra (Blacklip Abalone) – an edible seafood product.
Mid-CoastSSD-7265
Withdrawn
Palm Lake RACF Forster Lakes
Demolition of all structures, site preparation works and construction of a new 2 storey Residential Aged Care Facility (RACF) consisting of approx. 120 beds, communal facilities, car parking, signage and associated landscaping works.
Mid-CoastSSD-57834709
Withdrawn
Stratford Pumped Hydro and Solar
Development of a 300 MW / 3600 MWh pumped hydro energy storage and generation project, 330 MW solar farm, grid connection and ancillary infrastructure.
Mid-CoastSSD-65479959
Determination
Karuah East Quarry (MOD 9) - Operating hours
Extension of hours of operation for product loading and dispatch, and quarrying operations.
MidCoastMP09_0175-Mod-9
Determination
Mod to Tinonee PA (MP 05_0038 MOD 1) - Amended subdivision layout
The modification seeks approval to amend the subdivision layout and staging of the residential subdivision.
Mid-CoastMP05_0038-Mod-1
Determination
Karuah East Quarry (MOD 10) - Increase disturbance area
Proposed expansion of quarry footprint by approximately 7.4ha.
MidCoastMP09_0175-Mod-10
Make your yarns count.
Build a campaign, share with your community, and see the results.