Planning projects in Narrandera Shire
15 State significant and State-assessed projects in Narrandera Shire are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Narrandera Shire is on exhibition right now. See everything open across NSW.
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
SEARs
Narrandera Solar Farm
Construction, operation, and decommissioning of a Solar Farm with a capacity of approximately 200 MW, a battery energy storage system (BESS) with a capacity of approximately 400 MW / 3200 MWh, and ancillary infrastructure.
Narrandera ShireSSD-102673712
Prepare EIS
Gillenbah Battery Energy Storage System
Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 400 MW / 1600 MWh, and ancillary infrastructure.
Narrandera ShireSSD-104186459
Prepare EIS
Strontian Solar Farm
Construction, operation, and decommissioning of a Solar Farm with up to 393 MW of generating capacity and Battery Energy Storage System with a capacity of approximately 333 MW / 2,664 MWh, and ancillary infrastructure.
Narrandera ShireSSD-95743959
Prepare EIS
Narrandera Solar Farm
Construction, operation, and decommissioning of a Solar Farm with a capacity of approximately 200 MW, a battery energy storage system (BESS) with a capacity of approximately 400 MW / 3200 MWh, and ancillary infrastructure.
Narrandera ShireSSD-102673712
Prepare EIS
Banandra Wind Farm
Development of a wind farm with up to 93 turbines generating up to 558 MW capacity and associated infrastructure
Murrumbidgee+1 moreSSD-132053241
Prepare EIS
Devlins Bridge Wind Farm
Construction and operation of a wind farm with up to 94 wind turbines and associated infrastructure.
Narrandera ShireSSD-76610458
Recently assessed or decided
Withdrawn
MOD 1 - Battery Storage and Transport Route
Development of a 400 MW/1,800 MWh battery storage system and transport route amendments.
Narrandera ShireSSD-9237-Mod-1
Determination
MOD 2 - Changes to Battery Storage System
Move from a centralised to decentralised and increase the capacity of the battery energy storage system.
Narrandera ShireSSD-9031-Mod-2
Determination
Yarrabee Solar Farm
Development of a 900 megawatt solar farm with energy storage and associated infrastructure
Narrandera ShireSSD-9237
Determination
MOD 3 - Administrative Description of Lots
Include an additional land parcel not listed in the EIS that is part of the approved development footprint.
Narrandera ShireSSD-9237-Mod-3
Determination
Avonlie Solar Farm
Development of a 200 megawatt solar farm with battery storage and associated infrastructure.
Narrandera ShireSSD-9031
Determination
MOD 1 - Disturbance footprint and intersection change
Update project layout, redesign internal road network and site access, remove the Basic Left Turn at Muntz and Sandingo Roads intersection.
Narrandera ShireSSD-9031-Mod-1
Determination
MOD 2 – Administrative Description of Lots
Include six lots not listed in the EIS that are part of the approved development footprint.
Narrandera ShireSSD-9237-Mod-2
Determination
Euroley Poultry Production Complex MOD 1 - Access
Increase in Bird Numbers from a maximum of 3.92 to 4.4608 million birds, changes to allow for the use of A-Double heavy vehicles and changes to placement regimes.
Narrandera ShireSSD-6882-Mod-1