Councils

Planning projects in Narromine Shire

23 State significant and State-assessed projects in Narromine Shire are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.

Open for submissions

Nothing in Narromine Shire is on exhibition right now. See everything open across NSW.

Coming up for exhibition

These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.

  • Prepare EIS

    Burroway Wind Farm

    Construction, operation and decommissioning of a wind farm with up to 75 wind turbines, battery storage and associated infrastructure

    Narromine Shire+1 moreSSD-103903477

  • Prepare EIS

    Narromine Battery Energy Storage System

    A battery energy storage system of 125 MW / 250 MWh including associated infrastructure.

    Narromine ShireSSD-50701505

Recently assessed or decided

  • Withdrawn

    Tomingley Gold Extension Project

    To develop an open cut and underground gold mine and associated infrastructure.

    Narromine ShireGA-35641715

  • Withdrawn

    Macquarie River Re-regulating Storage

    The project involves constructing, operating and maintaining a re-regulating storage on the Macquarie River downstream of Narromine. The new structure for the re-regulating storage will be located approximately 200m downstream of Gin Gin Weir.

    Narromine ShireSSI-10044

  • Determination

    Tomingley Gold Extension Project

    The Project seeks to continue the Tomingley Gold Operations and construct and operate the San Antonio and Roswell open cut and underground gold mine and associated infrastructure until December 2032

    Narromine ShireGA-15823373

  • Determination

    MOD 4 - Increased RSF Capacity

    Increasing the residual storage facility (RSF) capacity and using the mine site and associated infrastructure to support underground exploration operations, including disposal of waste rock and processing of bulk ore samples.

    Narromine ShireMP09_0155-Mod-4

  • Determination

    MOD 5 - New RSF and Extension of Project Life

    Extension of the Mine Site boundary to incorporate construction and use of a new Residual Storage Facility (RSF2), and extension of the project life from 31 December 2022 to 31 December 2025.

    Narromine ShireMP09_0155-Mod-5

  • Determination

    MOD 1 - Project Amendments

    Project Amendments

    Narromine ShireMP09_0155-Mod-1

  • Determination

    MOD 6 - Increase RSF1 Capacity

    Increasing capacity of the Residue Storage Facility 1 (RSF1) by about 400,000 tonnes through construction and use of RSF1 Stage 9 Cell 2 within the approved project site.

    Narromine ShireMP09_0155-Mod-6

  • Determination

    Tomingley Gold Project

    To develop, operate and rehabilitate an open cut and underground gold mine and associated infrastructure for up to 10 years and transport the processed ore from the site via road.

    Narromine ShireMP09_0155

  • Determination

    MOD 7 - Wyoming 1 Open Cut Northern Ramp

    Construction of a new Ramp (Northern Ramp) for the Wyoming 1 Open Cut and associated activities.

    Narromine ShireMP09_0155-Mod-7

  • Determination

    Temporary Relocation of Pastefill Plant and Revised Offset Staging

    Temporary relocation of pastefill plant and revised staging to biodiversity offset credits

    Narromine ShireSSD-9176045-Mod-1

  • Determination

    Central West Pipeline (Marsden to Dubbo)

    Development for the purpose of the construction and operation of a pipeline to convey natural gas known as the ‘PL25 - Central West Pipeline (Marsden to Dubbo)' authorised under Licence No.25 (granted on 1 October 1997)

    Dubbo Regional+3 moreSSI-71022719

  • Determination

    Tomingley Gold Extension Project

    To develop an open cut and underground gold mine and associated infrastructure.

    Narromine ShireSSD-9176045

  • Determination

    Modification 2 - Biodiversity Offset Stages

    Amendment to the biodiversity offset credit retirement stages

    Narromine ShireSSD-9176045-Mod-2

  • Determination

    Inland Rail - Narromine to Narrabri

    This section of the Inland Rail project consists of approximately 300 km of new single track rail line, through private and public property in a “greenfield” environment between Narromine and Narrabri.

    Coonamble Shire+4 moreSSI-9487

  • Determination

    Burroway Solar Farm

    Development of a 100MW solar farm with energy storage and associated infrastructure

    Narromine ShireSSD-55968733

  • Determination

    Tomingley Gold MOD3 - Change to Mining Operation

    Change to Mining Operations

    Narromine ShireMP09_0155-Mod-3

  • Determination

    Tomingley Gold MOD 2 - Stability and Amenity Bond

    Caloma Stability and Amenity Bund

    Narromine ShireMP09_0155-Mod-2

  • Determination

    Parkes to Narromine Inland Rail MOD 1 - Parkes to Narromine

    Modification to Conditions E13 and E47 to update timing requirements for submission of the Operational Noise Compliance Report and Level Crossing Performance Report

    Narromine Shire+1 moreSSI-7475-Mod-1

  • Determination

    Narromine to Narrabri MOD 1 - Admin Changes

    Changes requested to conditions including:1. MCoA E56 Erosion Threshold Velocities (ETV) Report2. MCoA E111 Arrow Travelling Stock Reserve (TSR) Alternative Arrangements3. Other minor amendments to conditions

    Coonamble Shire+4 moreSSI-9487-Mod-1

  • Determination

    Narromine to Narrabri MOD 2 - Credit Retirement

    Modification to MCoA E24, to align with MCoA E26 of the Approval for Inland Rail Illabo to Stockinbingal Project (SSI-9406), which allows for the review and reduction the ecosystem and species credit requirements with Planning Secretary approval.

    Coonamble Shire+4 moreSSI-9487-Mod-2

  • Response to Submissions

    Wallaby Creek Wind Farm

    Construction and operation of a wind farm with up to 38 wind turbines, battery storage and associated infrastructure.

    Narromine ShireSSD-60247211

Make your yarns count.

Build a campaign, share with your community, and see the results.