Planning projects in Oberon
24 State significant and State-assessed projects in Oberon are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Oberon is on exhibition right now. See everything open across NSW.
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Oberon Quarries Extension Project
Expansion to access approximately 12.6 million tonnes of basalt resource.
OberonSSD-50436459
Recently assessed or decided
Withdrawn
Paling Yards Wind Farm
Construction and operation of a wind farm comprising up to 55 wind turbines with a maximum blade tip height of 175m and associated infrastructure.
OberonSSD-6699
Determination
Borg Timber Processing Facility Expansion, Oberon
Construction and operation of a particle board facility and continuation of, and alterations and additions to, the existing medium density fibreboard (MDF) facility
OberonSSD-7016
Determination
MOD 1 - Remaining Resource Blasting
Increase the maximum number of holes per blast from 150 to 300.
OberonSSD-6333-Mod-1
Determination
Highland Pine Sawmill - Mod 1
Modification relates to administrative amendments to the approved site plans
OberonDA403-11-001-Mod-1
Determination
Borg Timber Complex Oberon MOD 5 - Alterations
Alerations to the approved mechanics workshop
OberonSSD-7016-Mod-5
Determination
Sawmill Upgrade MOD 2 - Highland Pine
Modification involves an extension to the greenmill building, installation of new equipment including a spiral (Helix) log feeding system as a replacement for the current log step feeder system and additional acoustic measures.
OberonDA403-11-001-Mod-2
Determination
Borg Timber Complex Oberon MOD 4 - Improved layout
Additions and alterations to the existing Borg Panels Timber Processing Facility including reclamation of the remaining spring fed dam , relocation and expansion of the existing mechanic's workshop and improvements to the site's water treatment plant
OberonSSD-7016-Mod-4
Determination
Borg Timber Complex Oberon MOD 3 - Handling Tools
Additional materials handling equipment, addition of awning to Northern Warehouse, changes to the site surface water system and construction of further hardstand.
OberonSSD-7016-Mod-3
Determination
Borg Timber Complex Oberon MOD 2 - Gas Turbine
The modification involves: - installation of an electricity-generating gas turbine - installation of high pressure gas pipe - rationalisation of and changes to particleboard plant ancillary equipment & layout - service road extension
OberonSSD-7016-Mod-2
Response to Submissions
Paling Yards Wind Farm
Development of a wind farm with up to 47 wind turbines and associated infrastructure.
OberonSSD-29064077
Assessment
Modification 2 - Operating Hours
Amend hours of operation to allow loading and dispatch to commence from 5am rather than 6 am Monday to Friday and increase in laden truck movements from 5 am to 7 am and from 6 pm to 10 pm from a maximum of 4 per hour to a maximum of 8 per hour.
OberonSSD-6333-Mod-2
Assessment
Oberon Quarries - Modification 3
0.9 hectare pit extension into cleared paddock
OberonSSD-6333-Mod-3