Planning projects in Singleton Shire
166 State significant and State-assessed projects in Singleton Shire are listed on the NSW Planning Portal. 2 are on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.
Campaigns running now
- Write your letter
New England REZ Transmission Project
New England REZ Transmission Project · closes Thursday 26 November at 11:59 pm
Open for submissions
Closes 10 Nov · 4 days left
Rix's Creek North Continuation Project
Continuation of mining operations at the Rix's Creek North Mine until 2049
Singleton ShireSSD-60774228
Closes 26 Nov · 20 days left
New England REZ Transmission Project
Development of new dual 500kV transmission lines between Muswellbrook and the New England REZ and new 500kV and 330kV lines to connect five new energy hubs within the New England REZ. This project is declared CSSI.
Muswellbrook Shire+6 moreSSI-74175972
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Huntlee New Town Stage 2
A Concept Master plan for Stage 2 site including the residue of Town Centre, Villages 2, 3 and 4 and a large lot residential area located to the south of the site on Old North Road. Detailed subdivision application for Village 2 residential area
Cessnock City+1 moreSSD-54836993
Prepare EIS
Edderton Solar Farm
Construction and operation of a 350 MW Solar Farm and associated BESS
Muswellbrook Shire+1 moreSSD-69965958
Prepare EIS
CleanEra Mt Thorley Waste Facility
Expansion of existing 24/7 waste facility processing up to 175,000 tpa of liquid and solid wastes and 25,000 tpa of liquid hazardous waste. Refit of equipment within existing buildings to enable increased waste processing and dangerous goods handling
Singleton ShireSSD-142326740
Prepare EIS
East Quarry Extension Project
Expansion of existing hard rock quarry to extract up to 500,000 tonnes per year for 25 years.
Singleton ShireSSD-88252722
Recently assessed or decided
Withdrawn
Glendell Continued Operations Project
Extension of mining including extraction of an additional 140 million tonnes of ROM coal until 2044 at an increased rate of 10 million tonnes per annum.
Singleton ShireSVC-10007
Withdrawn
Mod to Huntlee PA (MP 10_0137 MOD 12)- 4 additional lots
Modification to incorporate 4 additional residential lots.
Cessnock City+1 moreMP10_0137-Mod-12
Withdrawn
HVO South Open Cut Coal Continuation Project
Continuation of mining at the HVO South open cut mining complex until 2045, including mining of deeper coal seams and a reduction in maximum extraction rate (from 20 Mtpa to 18 Mtpa)
Singleton ShireSVC-12713046
Withdrawn
Modification 19 Huntlee Mod 19
Subdivision of Substage 14 and 15 to provide 169 new residential lots, subdivision of superlots 222 and 223 in Substage 16 to provide an additional 33 residential lots. Overall increase of 202 lots. New internal roads are also proposed.
Cessnock City+1 moreMP10_0137-Mod-19
Withdrawn
MOD 18 - Huntlee Town Centre Subdivision
Additional 161 residential allotments
Cessnock City+1 moreMP10_0137-Mod-18
Withdrawn
Ashton Coal Project (MOD 11) - RUM Integration
Allowing access for Ashton Coal Operations Pty Limited to mine a portion of the Ravensworth Underground Mine (RUM) coal reserves.
Singleton ShireGA-43235682
Withdrawn
Whittingham Solar Farm
Proposing development of approximately 100 MW solar farm with potential energy storage and associated infrastructure.
Singleton ShireSSD-10453
Withdrawn
Mod to Huntlee PA (MP 10_0137 MOD 14) - Large Lot Changes
Lot and road layout amendments of Large Lot Residential Stage 5, resulting in deletion of 10 lots
Cessnock City+1 moreMP10_0137-Mod-14
Withdrawn
Mount Owen MOD8 - Biodiversity Offsets
Modification to correct the size of offset areas following detailed boundary surveys.
Singleton ShireSSD-5850-Mod-8
Withdrawn
Bulga Modification 5 - Revised Final Landform.
Amendments to the approved final landform to increase stability.
Singleton ShireSSD-4960-Mod-5
Determination
HVO North Open Cut Coal Continuation Project
Continuation of mining at the HVO North open cut coal mining complex until 2050, including extension of approved mining areas, mining of deeper coal seams and realignment of Lemington Road.
Singleton Shire+1 moreSVC-12575722
Determination
Mod to Hunlee PA (MP 10_0137 MOD 15)- Town Centre boundary changes
Boundary changes to lots in Town Centre
Cessnock City+1 moreMP10_0137-Mod-15