Planning projects in Snowy Monaro Regional
24 State significant and State-assessed projects in Snowy Monaro Regional are listed on the NSW Planning Portal. 1 is on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.
Open for submissions
Closes 1 Dec · 25 days left
MOD 4 - Southern Communication Line
Installation and operation of a 16 km communication line (fibre optic cables) from Marica to the Selwyn Ski Field carpark, replacing a 35 km section of the approved communication line.
Snowy Valleys+1 moreSSI-9687-Mod-4
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Coonerang Wind Farm
Construction and operation of a wind farm with up to 34 wind turbines, battery storage and associated infrastructure.
Snowy Monaro RegionalSSD-62164459
Recently assessed or decided
Withdrawn
Elysian Wind Farm Project
The construction, operation and decommissioning of a wind farm with:- a maximum of 30 turbines, a maximum of 200 megawatts (MW) and maximum height of 230 metres (to blade tip) and ancillary infrastructure.
Snowy Monaro RegionalSSD-10406
Withdrawn
Monaro Solar Farm
Construction, operation and decommissioning of a 100MW solar farm, 100MW/200MWh battery energy storage system and associated infrastructure.
Snowy Monaro RegionalSSD-67433711
Withdrawn
Cooma Solar Farm
Construction, operation, and decommissioning of 100MW solar farm, a battery energy storage system with a capacity of up to 80MW/320MWh, and associated infrastructure.
Snowy Monaro RegionalSSD-73192208
Determination
Snowy 2.0 - Exploratory Works
Exploratory works for the Snowy 2.0 electric storage and generation project, including construction of an exploratory tunnel and associated infrastructure.
Snowy Monaro Regional+1 moreSSI-9208
Determination
Snowy 2.0 - Segment Factory
Segment factory for the manufacture of tunnel segment linings for the Snowy 2.0 project
Snowy Monaro RegionalSSI-10034
Determination
MOD 2 - Tunnelling methodology
Change of exploratory tunnelling methodology from drill and blast to predominantly tunnel boring machine, reduction in use of barging and increasing the Lobs Hole accommodation camp capacity to 250.
Snowy Monaro Regional+1 moreSSI-9208-Mod-2
Determination
New Education Campus at Jindabyne (New Primary and High School)
A proposed new education campus comprising a new primary school and a new high school.
Snowy Monaro RegionalSSD-15788005
Determination
MOD 1 - Main Access Tunnel to Marica Services Connection
Modification to permit horizontal directional drilling for utilities/services between the Lobs Hole and Marica areas of the project
Snowy Valleys+1 moreSSI-9687-Mod-1
Determination
Snowy 2.0 - Main Works
The development of an underground pumped hydro power station and ancillary infrastructure.
Snowy Monaro Regional+1 moreSSI-9687
Determination
MOD 2 - Remediation and Ground Consolidation
Remediation of sinkhole and ground consolidation works to facilitate the progression of TBM Florence at Tantangara
Snowy Valleys+1 moreSSI-9687-Mod-2
Determination
MOD 3 - Additional Adit
Modification includes excavating an additional adit at Marica West to facilitate progression through the Long Plain Fault Zone.
Snowy Valleys+1 moreSSI-9687-Mod-3
Determination
New Education Campus MOD 2 - Design Amendments
The modification relates to various design amendments to improve the operations of the schools. Additionally amendments are sought to Conditions B20, B39 and C28.
Snowy Monaro RegionalSSD-15788005-Mod-2
Determination
New Education Campus MOD 1 - New building & design
New single storey building and new Agricultural Plot structures. Internal and external changes to approved buildings. Changes to car bays, bus bays and the internal road. Changes to landscaping and civil infrastructure.
Snowy Monaro RegionalSSD-15788005-Mod-1
Determination
New Education Campus MOD 3 - Access, Design & APZ
Modification to allow interim transport access arrangements, new signage, minor design amendments and updated Asset Protection Zone Mapping.
Snowy Monaro RegionalSSD-15788005-Mod-3
Determination
Dongwha Sawmill MOD 4 - Timber Spray System
Installation of a linear H2F timber spray unit for the treatment of timber framing material
Snowy Monaro RegionalMP07_0161-Mod-4
Determination
MOD 1 - Stage 2 Turbine Changes
Reducing the overall number of turbines, and increasing dimensions of the Yandra cluster turbines, including a tip height increase from 152 m to 200 m.
Snowy Monaro Regional+1 moreMP09_0103-Mod-1