Councils

Planning projects in Snowy Monaro Regional

24 State significant and State-assessed projects in Snowy Monaro Regional are listed on the NSW Planning Portal. 1 is on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.

Open for submissions

  • Closes 1 Dec · 25 days left

    MOD 4 - Southern Communication Line

    Installation and operation of a 16 km communication line (fibre optic cables) from Marica to the Selwyn Ski Field carpark, replacing a 35 km section of the approved communication line.

    Snowy Valleys+1 moreSSI-9687-Mod-4

Coming up for exhibition

These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.

  • Prepare EIS

    Coonerang Wind Farm

    Construction and operation of a wind farm with up to 34 wind turbines, battery storage and associated infrastructure.

    Snowy Monaro RegionalSSD-62164459

Recently assessed or decided

  • Withdrawn

    Elysian Wind Farm Project

    The construction, operation and decommissioning of a wind farm with:- a maximum of 30 turbines, a maximum of 200 megawatts (MW) and maximum height of 230 metres (to blade tip) and ancillary infrastructure.

    Snowy Monaro RegionalSSD-10406

  • Withdrawn

    Monaro Solar Farm

    Construction, operation and decommissioning of a 100MW solar farm, 100MW/200MWh battery energy storage system and associated infrastructure.

    Snowy Monaro RegionalSSD-67433711

  • Withdrawn

    Cooma Solar Farm

    Construction, operation, and decommissioning of 100MW solar farm, a battery energy storage system with a capacity of up to 80MW/320MWh, and associated infrastructure.

    Snowy Monaro RegionalSSD-73192208

  • Determination

    Snowy 2.0 - Exploratory Works

    Exploratory works for the Snowy 2.0 electric storage and generation project, including construction of an exploratory tunnel and associated infrastructure.

    Snowy Monaro Regional+1 moreSSI-9208

  • Determination

    Snowy 2.0 - Segment Factory

    Segment factory for the manufacture of tunnel segment linings for the Snowy 2.0 project

    Snowy Monaro RegionalSSI-10034

  • Determination

    MOD 2 - Tunnelling methodology

    Change of exploratory tunnelling methodology from drill and blast to predominantly tunnel boring machine, reduction in use of barging and increasing the Lobs Hole accommodation camp capacity to 250.

    Snowy Monaro Regional+1 moreSSI-9208-Mod-2

  • Determination

    Dongwha Sawmill

    Snowy Monaro RegionalMP07_0161

  • Determination

    New Education Campus at Jindabyne (New Primary and High School)

    A proposed new education campus comprising a new primary school and a new high school.

    Snowy Monaro RegionalSSD-15788005

  • Determination

    MOD 1 - Main Access Tunnel to Marica Services Connection

    Modification to permit horizontal directional drilling for utilities/services between the Lobs Hole and Marica areas of the project

    Snowy Valleys+1 moreSSI-9687-Mod-1

  • Determination

    Snowy 2.0 - Main Works

    The development of an underground pumped hydro power station and ancillary infrastructure.

    Snowy Monaro Regional+1 moreSSI-9687

  • Determination

    MOD 2 - Remediation and Ground Consolidation

    Remediation of sinkhole and ground consolidation works to facilitate the progression of TBM Florence at Tantangara

    Snowy Valleys+1 moreSSI-9687-Mod-2

  • Determination

    MOD 3 - Additional Adit

    Modification includes excavating an additional adit at Marica West to facilitate progression through the Long Plain Fault Zone.

    Snowy Valleys+1 moreSSI-9687-Mod-3

  • Determination

    New Education Campus MOD 2 - Design Amendments

    The modification relates to various design amendments to improve the operations of the schools. Additionally amendments are sought to Conditions B20, B39 and C28.

    Snowy Monaro RegionalSSD-15788005-Mod-2

  • Determination

    New Education Campus MOD 1 - New building & design

    New single storey building and new Agricultural Plot structures. Internal and external changes to approved buildings. Changes to car bays, bus bays and the internal road. Changes to landscaping and civil infrastructure.

    Snowy Monaro RegionalSSD-15788005-Mod-1

  • Determination

    New Education Campus MOD 3 - Access, Design & APZ

    Modification to allow interim transport access arrangements, new signage, minor design amendments and updated Asset Protection Zone Mapping.

    Snowy Monaro RegionalSSD-15788005-Mod-3

  • Determination

    Dongwha Sawmill MOD 4 - Timber Spray System

    Installation of a linear H2F timber spray unit for the treatment of timber framing material

    Snowy Monaro RegionalMP07_0161-Mod-4

  • Determination

    Boco Rock Wind Farm

    Snowy Monaro Regional+1 moreMP09_0103

  • Determination

    MOD 1 - Stage 2 Turbine Changes

    Reducing the overall number of turbines, and increasing dimensions of the Yandra cluster turbines, including a tip height increase from 152 m to 200 m.

    Snowy Monaro Regional+1 moreMP09_0103-Mod-1

  • Determination

    Dongwha Sawmill MOD 3 - Biomass Boiler

    /

    Snowy Monaro RegionalMP07_0161-Mod-3

  • Determination

    Dongwha Sawmill MOD 2 - Wood Fired Boiler

    /

    Snowy Monaro RegionalMP07_0161-Mod-2

Search all 24 projects in Snowy Monaro Regional

Make your yarns count.

Build a campaign, share with your community, and see the results.