Planning projects in Snowy Valleys

23 State significant and State-assessed projects in Snowy Valleys are listed on the NSW Planning Portal. 1 is on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.

Open for submissions

  • Closes 1 Dec · 25 days left

    MOD 4 - Southern Communication Line

    Installation and operation of a 16 km communication line (fibre optic cables) from Marica to the Selwyn Ski Field carpark, replacing a 35 km section of the approved communication line.

    Snowy Valleys+1 moreSSI-9687-Mod-4

Coming up for exhibition

These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.

  • Prepare EIS

    Murray Terminal BESS

    Construction, operation and decommissioning of a battery energy storage system (BESS) of up to 500 Megawatts (MW) / 2000 MW hour capacity and ancillary infrastructure.

    Snowy ValleysSSD-92509458

  • Prepare EIS

    Saddletop Wind Farm

    The construction, operation and decommissioning of a wind farm with up to 123 turbines and ancillary infrastructure.

    Cootamundra-Gundagai Regional+2 moreSSD-96381708

  • Prepare EIS

    Talbingo Battery Energy Storage System

    Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 450MW/1800MWh and ancillary infrastructure.

    Snowy ValleysSSD-78355711

  • Prepare EIS

    Bondo Wind Farm

    Neoen seeks to construct up to 149 wind turbine generators (WTGs), with an electricity generation capacity of approximately 1.2 gigawatts (GW). Along with two BESS infrastructure both with a capacity of 400 MW / 1600 MWh.

    Snowy Valleys+2 moreSSD-86276211

Recently assessed or decided