Planning projects in Snowy Valleys
23 State significant and State-assessed projects in Snowy Valleys are listed on the NSW Planning Portal. 1 is on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.
Open for submissions
Closes 1 Dec · 25 days left
MOD 4 - Southern Communication Line
Installation and operation of a 16 km communication line (fibre optic cables) from Marica to the Selwyn Ski Field carpark, replacing a 35 km section of the approved communication line.
Snowy Valleys+1 moreSSI-9687-Mod-4
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Murray Terminal BESS
Construction, operation and decommissioning of a battery energy storage system (BESS) of up to 500 Megawatts (MW) / 2000 MW hour capacity and ancillary infrastructure.
Snowy ValleysSSD-92509458
Prepare EIS
Saddletop Wind Farm
The construction, operation and decommissioning of a wind farm with up to 123 turbines and ancillary infrastructure.
Cootamundra-Gundagai Regional+2 moreSSD-96381708
Prepare EIS
Talbingo Battery Energy Storage System
Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 450MW/1800MWh and ancillary infrastructure.
Snowy ValleysSSD-78355711
Prepare EIS
Bondo Wind Farm
Neoen seeks to construct up to 149 wind turbine generators (WTGs), with an electricity generation capacity of approximately 1.2 gigawatts (GW). Along with two BESS infrastructure both with a capacity of 400 MW / 1600 MWh.
Snowy Valleys+2 moreSSD-86276211
Recently assessed or decided
Determination
Snowy 2.0 - Exploratory Works
Exploratory works for the Snowy 2.0 electric storage and generation project, including construction of an exploratory tunnel and associated infrastructure.
Snowy Monaro Regional+1 moreSSI-9208
Determination
MOD 2 - Tunnelling methodology
Change of exploratory tunnelling methodology from drill and blast to predominantly tunnel boring machine, reduction in use of barging and increasing the Lobs Hole accommodation camp capacity to 250.
Snowy Monaro Regional+1 moreSSI-9208-Mod-2
Determination
Snowy 2.0 - Transmission Connection
New transmission connection between the proposed Snowy 2.0 pumped hydro and generation project to the existing high voltage transmission network.
Snowy ValleysSSI-9717
Determination
MOD 1 - Extension of Biodiversity Offset Timing
Seeking an extension to the timing of the biodiversity offset package
Snowy ValleysSSI-9717-Mod-1
Determination
MOD 7 - Modifications to ancillary operational infrastructure
Modifications to storage and processing capability of ancillary operational infrastructure
Snowy ValleysMP06_0159-Mod-7
Determination
Snowy 2.0 - Main Works
The development of an underground pumped hydro power station and ancillary infrastructure.
Snowy Monaro Regional+1 moreSSI-9687
Determination
MOD 1 - Main Access Tunnel to Marica Services Connection
Modification to permit horizontal directional drilling for utilities/services between the Lobs Hole and Marica areas of the project
Snowy Valleys+1 moreSSI-9687-Mod-1
Determination
MOD 3 - Additional Adit
Modification includes excavating an additional adit at Marica West to facilitate progression through the Long Plain Fault Zone.
Snowy Valleys+1 moreSSI-9687-Mod-3
Determination
MOD 2 - Remediation and Ground Consolidation
Remediation of sinkhole and ground consolidation works to facilitate the progression of TBM Florence at Tantangara
Snowy Valleys+1 moreSSI-9687-Mod-2
Determination
HumeLink
Development of new transmission lines between the existing substations at Wagga Wagga and Bannaby and the proposed Maragle substation, and a new substation at Gugaa.
Wagga Wagga City+5 moreSSI-36656827
Determination
Tumut Paper Expansion MOD 6 - Refueling Facility
The Modification works include the expansion of the existing waste yard, a new paper machine storage shed and relocation of the previously approved refuelling facility.
Snowy ValleysMP06_0159-Mod-6
Determination
Visy Pulp and Paper MOD 4 - Refuelling Relocation
The project description involves an expansion of the wastepaper yard and diversion of the loop road, construction of a storage shed and relocation of a refuelling facility.
Snowy ValleysDA6/98-Mod-4
Determination
Tumut Paper Expansion MOD 5 - Additional Storage
New operational storage structures, workshop and training facility.
Snowy ValleysMP06_0159-Mod-5
Determination
Tumut Paper Expansion MOD 4 - Noise Limits
Inclusion of Noise Limit Exemptions for receivers with Noise Agreements
Snowy ValleysMP06_0159-Mod-4
Determination
Modification 1 Strategic Offset Delivery Agreement
Modification to allow the project to meet its biodiversity offset obligation via delivery of a Strategic Offset Delivery Agreement (SODA).
Wagga Wagga City+5 moreSSI-36656827-Mod-1