Councils

Planning projects in Upper Lachlan Shire

47 State significant and State-assessed projects in Upper Lachlan Shire are listed on the NSW Planning Portal. 3 are on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.

Open for submissions

Coming up for exhibition

These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.

  • SEARs

    Wanina Battery Energy Storage System

    Battery Energy Storage System (BESS) with a capacity of approximately 500MW/4000MWh and associated infrastructure.

    Upper Lachlan ShireSSD-153061990

  • Prepare EIS

    Swallow Tail Battery Energy Storage System

    Development of a 375 MW / 1500 MWh battery energy storage system and associated infrastructure and connection works

    Upper Lachlan ShireSSD-78039972

  • Prepare EIS

    Kerrawary Gas Fired Power Station

    Construction and operation of an open cycle gas turbine power station with a nominal capacity of up to 1,200 megawatts (MW) and ancillary infrastructure.

    Upper Lachlan ShireSSD-144680240

  • Prepare EIS

    Bannaby Battery Energy Storage System

    Construction, operation, and decommissioning of a battery energy storage system (BESS) with an estimated capacity of approximately 750MW/3000MWh, and ancillary infrastructure.

    Upper Lachlan ShireSSD-78810458

  • Prepare EIS

    Hanworth Battery Energy Storage System

    Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 1.2GW/4.8GWh and ancillary infrastructure.

    Upper Lachlan ShireSSD-78179499

  • Prepare EIS

    Langley Vale Lerida Solar Farm

    The construction, operation and decommissioning of a 250 MW solar farm with a Battery Energy Storage System with a capacity of 500 MW / 2000 MWh and ancillary infrastructure.

    Upper Lachlan ShireSSD-100679208

  • Prepare EIS

    Kerrawary Power Station - Lateral Gas Pipeline

    To develop a 35 km underground gas pipeline from the existing Moomba Sydney pipeline to the Kerrawary Gas Fired Power Station near Marulan and associated infrastructure.

    Upper Lachlan Shire+1 moreSSI-144719990

Recently assessed or decided

  • Withdrawn

    Mod 1 - Extend Approval Lapsing Date

    Upper Lachlan ShireMP10_0035-Mod-1

  • Withdrawn

    Gunning Solar Farm

    Development of a 316MW solar farm and associated infrastructure.

    Upper Lachlan ShireSSD-8590

  • Withdrawn

    Western Range Solar Farm

    Development of a 100 - 200 MW solar farm with energy storage and associated infrastructure

    Upper Lachlan ShireSSD-10111249

  • Withdrawn

    Barina Hard Rock Quarry (Mod 1) - Time extension

    Extend the life of the quarry by 3 years to March 2024

    Upper Lachlan ShireDA1-01-2000-Mod-1

  • Withdrawn

    MOD 1 - Biodiversity Offset Extension

    Extension of timeframe for finalising the delivery of required biodiversity offsets.

    Upper Lachlan ShireSSD-6695-Mod-1

  • Determination

    Biala Wind Farm

    31 turbine wind farm, with the capacity to generate up to 110 MW of electricity, including ancillary infrastructure.

    Upper Lachlan ShireSSD-6039

  • Determination

    MOD 1 - Compressor Station Installation

    Installation of two compressor stations

    Unincorporated Far West+10 moreSSI-15548591-Mod-1

  • Determination

    MOD 3 - Temporary Concrete Batch Plant

    Installation and operation of a temporary concrete batch plant on the site, enabling a more efficient construction process for the wind farm and significantly reducing heavy vehicle movements in the area by avoiding trucking concrete from Goulburn.

    Upper Lachlan ShireMP10_0156-Mod-3

  • Determination

    MOD 1 - Tip Height Increase

    Increase in maximum tip height to 200 m, decrease in maximum number of turbines to 77 and determine a single transport route for construction traffic.

    Hilltops+2 moreSSD-6693-Mod-1

  • Determination

    Taralga Wind

    Upper Lachlan ShireDA241/04

  • Determination

    Crookwell 2 Wind Farm

    Upper Lachlan ShireDA176-9-2004

  • Determination

    Moomba to Wilton Pipeline - Mod 3

    Installation and use of groundwater bore and site layout amendments at the MW433 compressor station site

    Unincorporated Far West+10 moreSSI-15548591-Mod-3

  • Determination

    Mod 2- Amendment to Development Corridor

    To update development corridor and internal access tracks for the project.

    Hilltops+2 moreSSD-6693-Mod-2

  • Determination

    Mod 4 - Temporary Accommodation Camps

    Construction and operation of six temporary accommodation camps to facilitate essential maintenance of the Moomba to Wilton Pipeline.

    Unincorporated Far West+10 moreSSI-15548591-Mod-4

  • Determination

    Barina Modification 2 Extension to Quarry Life

    Extend operational life by 12 months.

    Upper Lachlan ShireDA1-01-2000-Mod-2

  • Determination

    MOD 2 - Compressor Station Installation

    Installation of three compressor stations - Stage 3 of the East Coast Grid Expansion

    Unincorporated Far West+10 moreSSI-15548591-Mod-2

  • Determination

    MOD 5 - Biodiversity Credits Corrrection

    Biodiversity Credit Calculation Correction

    Unincorporated Far West+10 moreSSI-15548591-Mod-5

  • Determination

    MOD 7 - Staging of Biodiversity Offsets

    Staging of biodiversity credit retirement

    Unincorporated Far West+10 moreSSI-15548591-Mod-7

  • Determination

    Barina hard rock quarry

    Upper Lachlan ShireDA1-01-2000

  • Determination

    MOD 6 - Temporary Accommodation Camps

    Construction and operation of two temporary worker's accommodation camps to facilitate planned maintenance of the Moomba to Wilton Pipeline

    Unincorporated Far West+10 moreSSI-15548591-Mod-6

  • Determination

    Moomba to Wilton Pipeline

    Moomba to Wilton Pipeline

    Unincorporated Far West+10 moreSSI-15548591

  • Determination

    Gunning Solar Farm

    Development of a 250 MW solar farm and associated infrastructure, including battery storage and grid connection

    Upper Lachlan ShireSSD-46668486

  • Determination

    Crookwell 3 Wind Farm

    Development of a wind farm with up to 16 wind turbines and associated infrastructure.

    Upper Lachlan ShireSSD-6695

  • Determination

    MOD 8 - Compressor Station Installation MW733

    Construction and operation of an additional compressor station on the MWP at MW733.

    Unincorporated Far West+10 moreSSI-15548591-Mod-8

Search all 47 projects in Upper Lachlan Shire

Make your yarns count.

Build a campaign, share with your community, and see the results.