Planning projects in Warrumbungle Shire
26 State significant and State-assessed projects in Warrumbungle Shire are listed on the NSW Planning Portal. 1 is on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.
Open for submissions
Closes 13 Nov · 7 days left
MOD 1 - Temporary Worker Accommodation
Addition of Temporary Worker Accommodation Facility for up to 600 workers, adjacent to the approved Project Site.
Dubbo Regional+1 moreSSD-41134610-Mod-1
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Orana Wind Farm
Construction and operation of a wind farm with up to 92 wind turbines, battery storage and associated infrastructure.
Warrumbungle Shire+1 moreSSD-58260958
Prepare EIS
Narragamba Solar Farm
Development of a 320 megawatt (AC) solar project including associated infrastructure.
Mid-Western Regional+1 moreSSD-60575715
Recently assessed or decided
Withdrawn
Dapper Solar Farm
Development of a 300 MW solar farm and associated infrastructure
Warrumbungle Shire+1 moreSSD-52217961
Determination
MOD 1 - Minor Administrative Changes
Minor administrative changes primarily relating to clarifying timing of post approval documentation.
Warrumbungle Shire+3 moreSSI-48323210-Mod-1
Determination
MOD 1 - Minor Administrative Changes
Minor administrative changes primarily relating to clarifying timing of post approval documentation.
Warrumbungle Shire+3 moreSSI-48323210-Mod-1
Determination
MOD 1 - Turbine and infrastructure changes
Increase in maximum tip height to 215 m, decrease in maximum number of turbines from 267 to 185, amendments to infrastructure and the transport route and increase native vegetation clearing limits.
Mid-Western Regional+2 moreSSD-6696-Mod-1
Determination
Birriwa Solar Farm
The development of a 600 MW solar farm, energy storage facility and associated infrastructure. IPC link: https://www.planningportal.nsw.gov.au/major-projects/projects/birriwa-s…
Mid-Western Regional+1 moreSSD-29508870
Determination
Inland Rail - Narromine to Narrabri
This section of the Inland Rail project consists of approximately 300 km of new single track rail line, through private and public property in a “greenfield” environment between Narromine and Narrabri.
Coonamble Shire+4 moreSSI-9487
Determination
MOD 2 - Mudgee Maintenance Facility
Construction and operation of maintenance facility at 1 Marsh Ave, Caerleon
Mid-Western Regional+3 moreSSI-48323210-Mod-2
Determination
MOD 2 - Development Corridor Adjustment
Addition of approximately 16 ha to the development corridor to accommodate micro-siting of access tracks and permanent meteorological monitoring masts
Mid-Western Regional+2 moreSSD-6696-Mod-2
Determination
MOD 4 - Minor change to clearing limits
Modification to increase clearing limits for Leucochrysum albicans
Warrumbungle Shire+3 moreSSI-48323210-MOD-4
Determination
Spicers Creek Wind Farm
Development of a wind energy generation project with up to 117 wind turbines, with energy storage and associated infrastructure. IPC link: https://www.ipcn.nsw.gov.au/cases/2024/07/spicers-creek-wind-farm
Dubbo Regional+1 moreSSD-41134610
Determination
Valley of the Winds Wind Farm
Construction and operation of a wind farm with up to 131 wind turbines, energy storage and associated infrastructure.
Warrumbungle ShireSSD-10461
Determination
MOD 3 - Strategic Offset Delivery Agreement
Modification to allow the project to meet its biodiversity offset obligation via delivery of a Strategic Offset Delivery Agreement (SODA).
Warrumbungle Shire+3 moreSSI-48323210-Mod-3
Determination
Narromine to Narrabri MOD 2 - Credit Retirement
Modification to MCoA E24, to align with MCoA E26 of the Approval for Inland Rail Illabo to Stockinbingal Project (SSI-9406), which allows for the review and reduction the ecosystem and species credit requirements with Planning Secretary approval.
Coonamble Shire+4 moreSSI-9487-Mod-2
Determination
Narromine to Narrabri MOD 1 - Admin Changes
Changes requested to conditions including:1. MCoA E56 Erosion Threshold Velocities (ETV) Report2. MCoA E111 Arrow Travelling Stock Reserve (TSR) Alternative Arrangements3. Other minor amendments to conditions
Coonamble Shire+4 moreSSI-9487-Mod-1
Determination
Central-West Orana REZ Transmission
Development of new twin double circuit 500 kV transmission lines between Wollar and the proposed substations at Merotherie and Elong Elong, and connections from these lines to renewable energy generation and storage projects in the CWO REZ
Warrumbungle Shire+3 moreSSI-48323210
Determination
MOD 3 - Turbine and infrastructure refinements
Reduction in maximum number of turbines from 185 to 173, refinements to infrastructure and public road upgrade development corridor.
Warrumbungle Shire+2 moreSSD-6696-Mod-3
Determination
Dunedoo Solar Farm
Development of a 55 MW solar farm with energy storage and associated infrastructure.
Warrumbungle ShireSSD-8847
Prepare Mod Report
Dunedoo Solar Farm Modification 1
Changes to battery layout and increased battery capacity and updates to general layout and development footprint.
Warrumbungle ShireSSD-8847-Mod-1
Assessment
Cobbora Solar Farm
Development of a 700 MW solar farm with energy storage and associated infrastructure.
Dubbo Regional+1 moreSSD-29491142
Assessment
Sandy Creek Solar Farm
Development of a 700 MW solar farm and associated infrastructure.
Warrumbungle Shire+1 moreSSD-41287735
Assessment
Birriwa Solar - Modification 1
Proposed modification seeks to include additional lots, an alternative secondary access route and upgrade to part of the existing Birriwa Bus Route South road, increase in temporary workers accommodation and increase in BESS capacity and duration
Mid-Western Regional+1 moreSSD-29508870-Mod-1
Make your yarns count.
Build a campaign, share with your community, and see the results.