Planning projects in Wollondilly Shire
66 State significant and State-assessed projects in Wollondilly Shire are listed on the NSW Planning Portal. 1 is on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.
Open for submissions
Closes 12 Nov · 6 days left
MOD 3 - Increase to project output, footprint and lapse date
Increase to project output, footprint and lapse date
Goulburn Mulwaree+2 moreMP07_0174-Mod-3
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Breen Macarthur Resource Recovery Facility and Landfill
Construction and operation of a resource recovery facility and landfill that would receive 280,000 tonnes/year non-putrescible GSW, GSW soil and dredge spoil, and waste tyres, generally from construction and demolition; and landfill rehabilitation
Wollondilly ShireSSD-99769473
Prepare EIS
Barca Metals RRF Razorback
Increase in waste throughput of an approved metal recycling facility from 80,000 tonnes per annum (tpa) to 360,000 tpa
Wollondilly ShireSSD-137193990
Prepare EIS
The Oaks Airport
Airport, Residential Airpark and Tourist complex
Wollondilly ShireSSD-62038476
Prepare EIS
Metropolitan Continuation Project
12 year extension of Metropolitan Coal Mine, extending the 300 series longwalls to the west of exiting operations and adding 400 series longwalls constructing a Ventilation Air Methane (VAM) abatement plant
Wollongong City+2 moreSSD-141889240
Recently assessed or decided
Withdrawn
Brownlow Hill Sustainability Park
To construct and operate a facility to receive and process 370,000 tonnes per year of C&D waste and organic waste and continue to extract 50,000 tpa of sandstone.
Wollondilly Shire+1 moreSSD-10372
Withdrawn
Tahmoor North - Modification 6 extension of 20 mm subsidence contour
<p>Expansion of the 20 mm total subsidence contour for longwalls W3 and W4 into the rail corridor.</p>
Tweed Shire+1 moreDA67/98-Mod-6
Withdrawn
Port Kembla to Wilton Gas Pipeline
An approximately 37 km underground high pressure gas pipeline from Port Kembla to Wilton
Wollongong City+1 moreSSI-10043
Withdrawn
Picton High School Redevelopment Mod 3 - Condition D36(d)
Deletion of Condition D36(d) that requires tree hollows and trunks to be salvaged and retained on the site.
Wollondilly ShireSSD-8640-Mod-3
Withdrawn
Dendrobium Mine Extension Project
Proposed extension of mining within Area 5 and extension of the life of Dendrobium Mine until 2041.
Wollongong City+2 moreSSI-33143123
Withdrawn
Allied Mills Picton - MOD 4 - Extension to Mill
Extension to mill and increase in production and associated works.
Wollondilly ShireDA318-12-2004-Mod-4
Withdrawn
Warragamba Dam Raising
Warragamba Dam Raising is a project to provide temporary storage capacity for large inflow events into Lake Burragorang to facilitate downstream flood mitigation and includes infrastructure to enable environmental flows.
Wollondilly ShireSSI-8441
Withdrawn
Warragamba Dam Environmental Flows
Installation of new, and refurbishment of existing, infrastructure to allow Environmental flow (E-flows) releases of water to occur from Warragamba Dam.
Wollondilly ShireSSI-69205708
Determination
MOD 1 - Compressor Station Installation
Installation of two compressor stations
Unincorporated Far West+10 moreSSI-15548591-Mod-1
Determination
Picton High School Redevelopment
Modification to Condition D36 to delete required tree hollow provision from site
Wollondilly ShireSSD-8640
Determination
MOD 3 - Appin Mine Ventilation and Access Project
Installation of mine ventilation and access infrastructure
Campbelltown+2 moreMP08_0150-Mod-3
Determination
Moomba to Wilton Pipeline - Mod 3
Installation and use of groundwater bore and site layout amendments at the MW433 compressor station site
Unincorporated Far West+10 moreSSI-15548591-Mod-3
Determination
Camden Gas Stage 1B - Kay Park
Camden Gas Stage 1B - Kay Park
Wollondilly ShireDA246-8-2002-I
Determination
Dendrobium Mine Extension Project
Proposed extension to the Dendrobium Coal Mine. Link to the Independent Planning Commission's page for the Project https://www.ipcn.nsw.gov.au/cases/2020/10/dendrobium-extension-project-…
Wollongong City+2 moreSSD-8194
Determination
Tahmoor North Underground Extension
Tahmoor North Underground Extension
Wollondilly ShireDA67/98
Determination
Mod 4 - Temporary Accommodation Camps
Construction and operation of six temporary accommodation camps to facilitate essential maintenance of the Moomba to Wilton Pipeline.
Unincorporated Far West+10 moreSSI-15548591-Mod-4
Determination
Tahmoor South Coal Project
Underground longwall mining to extract coal to the south of existing mining. Independent Planning Commission website: https://www.ipcn.nsw.gov.au/projects/2020/10/tahmoor-south-coal-project-ssd-8445-second-referral
Wingecarribee Shire+1 moreSSD-8445
Make your yarns count.
Build a campaign, share with your community, and see the results.