Planning projects in Yass Valley
19 State significant and State-assessed projects in Yass Valley are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Yass Valley is on exhibition right now. See everything open across NSW.
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Saddletop Wind Farm
The construction, operation and decommissioning of a wind farm with up to 123 turbines and ancillary infrastructure.
Cootamundra-Gundagai Regional+2 moreSSD-96381708
Prepare EIS
Bookham Wind Farm
Construction and operation of a wind farm with up to 99 wind turbines, battery storage and associated infrastructure.
Yass ValleySSD-79885459
Prepare EIS
Derringullen Battery Energy Storage System
Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 400MW/1,600MWh and ancillary infrastructure.
Yass ValleySSD-74177718
Prepare EIS
Bondo Wind Farm
Neoen seeks to construct up to 149 wind turbine generators (WTGs), with an electricity generation capacity of approximately 1.2 gigawatts (GW). Along with two BESS infrastructure both with a capacity of 400 MW / 1600 MWh.
Snowy Valleys+2 moreSSD-86276211
Recently assessed or decided
Withdrawn
Yass Solar Farm
Construction and operation of a 80MW solar farm with ancillary 20MW battery storage facility
Yass ValleySSD-10428
Withdrawn
Yass Solar Farm
The construction, operation and decommissioning of a 100 MW solar photovoltaic energy generating facility with an associated battery energy storage system
Yass ValleySSD-65518239
Determination
Bango Wind (Mod 1)
Subdivision for the wind farm and substation
Hilltops+1 moreSSD-6686-Mod-1
Determination
New Primary School at Murrumbateman
Construction of a new primary school
Yass ValleySSD-11233241
Determination
MOD 1 - Tip Height Increase
Increase in maximum tip height to 200 m, decrease in maximum number of turbines to 77 and determine a single transport route for construction traffic.
Hilltops+2 moreSSD-6693-Mod-1
Determination
Mod 2- Amendment to Development Corridor
To update development corridor and internal access tracks for the project.
Hilltops+2 moreSSD-6693-Mod-2
Determination
Wallaroo Solar Farm
Development of a 100 MW solar farm and associated infrastructure, including battery storage facility. IPC link: https://www.ipcn.nsw.gov.au/cases/2024/06/wallaroo-solar-farm
Yass ValleySSD-9261283
Determination
Springdale Solar Farm
Development of a 100 megawatt solar farm and associated infrastructure – this consent has now lapsed as of 19 February 2026
Yass ValleySSD-8703
Determination
Modification 2 Decentralised BESS
Addition of decentralised battery energy storage systems and associated infrastructure to Yass Valley (Coppabella) Wind Farm.
Hilltops+1 moreSSD-6698-Mod-2
Determination
Coppabella Wind Farm MOD 1 - Turbine Height
Increase in turbine height and project refinement for constructability
Hilltops+1 moreSSD-6698-MOD-1
Determination
HumeLink
Development of new transmission lines between the existing substations at Wagga Wagga and Bannaby and the proposed Maragle substation, and a new substation at Gugaa.
Wagga Wagga City+5 moreSSI-36656827
Determination
Modification 1 Strategic Offset Delivery Agreement
Modification to allow the project to meet its biodiversity offset obligation via delivery of a Strategic Offset Delivery Agreement (SODA).
Wagga Wagga City+5 moreSSI-36656827-Mod-1
Prepare Mod Report
MOD 3 - operational access points and O&M facility
Use of three additional site access points for operation and and construction and use of a permanent operations and maintenance building
Hilltops+2 moreSSD-6693-Mod-3
Make your yarns count.
Build a campaign, share with your community, and see the results.