Closes 26 Nov · 20 days left
New England REZ Transmission Project
Development of new dual 500kV transmission lines between Muswellbrook and the New England REZ and new 500kV and 330kV lines to connect five new energy hubs within the New England REZ. This project is declared CSSI.
+6 moreSSI-74175972
Assessment
Gara Battery Energy Storage System
Development of a 400 MW / 1760 MWh battery storage system and associated infrastructure including grid connection.
SSD-71680710
Response to Submissions
Armidale East Battery Energy Storage System
The construction, operation and decommissioning of a battery energy storage system with a capacity of up to 377 MW / 2,310 MWh, and ancillary infrastructure.
SSD-65058714
Response to Submissions
Ebor Battery Energy Storage System
Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 100 MW/800 MWh and ancillary infrastructure.
SSD-85362210
Response to Submissions
MOD 5 – Extension of Mine Life
Extension of mine life and changes to infrastructure
DA98/35-Mod-5
SEARs
Armidale Water Security Project
Re-construction of Oaky River Dam, construction of a raw water pipeline from Oaky River Dam to Armidale water treater facility, and a potable water pipeline from Armidale to Uralla, and raising of Malpas Dam.
SSI-139387988
Prepare EIS
Kooyong Battery Energy Storage System
Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 200MW/800MWh and ancillary infrastructure.