Search results
Showing NSW Planning Portal projects in Cessnock City.
80 projects · page 1 of 7
Closes 11 Nov · 5 days left
Kurri Kurri Data Centre
Construction, fit-out and operation of a data centre with a total power consumption of 550.5 megawatts (MW), located at the former Hydro Aluminium Kurri Kurri plant.
SSD-128819490
Assessment
Huntlee New Town - Stage 2
A Concept Master plan for Stage 2 site including the residue of Town Centre, Villages 2, 3 and 4 and a large lot residential area located to the south of the site on Old North Road. Detailed subdivision application for Village 2 residential area
+1 moreSSD-70748466
Assessment
Increase ammonium nitrate (AN) limits and plant upgrades Mod-3
Increase in the ammonium nitrate (AN) storage limits and plant upgrades.
MP09_0090-Mod-3
Response to Submissions
Rothbury Battery Energy Storage System
Construction and operation of a 135MW/540MWh BESS and associated infrastructure
SSD-85939708
Response to Submissions
Sunshine Estate Battery Energy Storage System
Construction, operation and decommissioning of a 120 MW / 480 MWh battery energy storage system (BESS) and associated infrastructure.
SSD-92914712
Determination
Alterations and additions to St Philip's Christian College Cessnock campus
Alterations and additions to existing school buildings, new buildings for the middle and senior schools, new administration centre, new indoor aquatic centre, road network upgrades, improved site access arrangements and increased student numbers.
SSD-10360337
Determination
Weston Waste MOD 7 - Tonnage limit increase
Weston Waste Processing Trial (Mod 7)
LEC10397-1995-Mod-7
Prepare EIS
Kurri Kurri Battery Energy Storage System
Development of a 200 MW / 800 MWh battery energy storage facility with associated infrastructure.
SSD-113069490
Determination
Weston Aluminium MOD 9 - Tonnage limit increase
Weston Aluminium are seeking approval to undertake a 24 month trial of the processing of illicit drug and pharmaceutical wastes in existing furnaces
DA86-04-01-Mod-9
Determination
Enviroking Liquid Waste MOD 3 - Increased processing and storage, amended plans and extended hours
Increase the maximum amount of liquid waste to be processed on the site from 20,000 tonnes per annum to 30,000 tonnes per annum.
MP07_0048-Mod-3