65 projects · page 1 of 6

  • Closes 13 Nov · 7 days left

    MOD 1 - Temporary Worker Accommodation

    Addition of Temporary Worker Accommodation Facility for up to 600 workers, adjacent to the approved Project Site.

    +1 moreSSD-41134610-Mod-1

  • Assessment

    Burrendong Wind Farm

    Development of a wind farm, with up to 70 wind turbines and associated infrastructure

    +1 moreSSD-8950984

  • Assessment

    Apsley BESS Modification 1

    Increase in BESS capacity, increase in construction period including workers and water requirements, increase in vehicle movements including OSOM and amendments to the development footprint and site access.

    SSD-35160796-Mod-1

  • Assessment

    South Keswick Quarry Continuation Project

    Continued operation of the existing hard rock quarry at an extraction rate of 495,000 tones per annum for an additional 20 years, including expansion of the extraction area and extracting from a total resource of approximately 7.5 million tonnes.

    SSD-61394968

  • Assessment

    Cobbora Solar Farm

    Development of a 700 MW solar farm with energy storage and associated infrastructure.

    +1 moreSSD-29491142

  • Assessment

    MOD 1 - Increased Generation Capacity

    Increase in generation capacity from 64 MW to 180 MW and introduction of reciprocating engines and additional land for gas pipeline connection

    SSD-28088034-Mod-1

  • Assessment

    Sandy Creek Solar Farm

    Development of a 700 MW solar farm and associated infrastructure.

    +1 moreSSD-41287735

  • Response to Submissions

    Wellington North Solar Farm - Modification 1

    Addition of battery energy storage system

    SSD-8895-Mod-1

  • Prepare Mod Report

    Suntop Solar Mod 2 - Battery Storage System

    Development of a 200 MW / 800 MWh battery storage system and ancillary infrastructure.

    SSD-8696-Mod-2

  • Prepare EIS

    Aquila Wind Farm

    Construction and operation of a wind farm with up to 48 wind turbines, battery storage and associated infrastructure.

    SSD-67667971

  • Determination

    Central West Pipeline (Marsden to Dubbo)

    Development for the purpose of the construction and operation of a pipeline to convey natural gas known as the ‘PL25 - Central West Pipeline (Marsden to Dubbo)' authorised under Licence No.25 (granted on 1 October 1997)

    +3 moreSSI-71022719

  • Prepare EIS

    Mullion Creek Wind Farm

    Development of a wind farm with up to 33 wind turbines and associated infrastructure.

    +1 moreSSD-100739958