Search results

Showing NSW Planning Portal projects in Goulburn Mulwaree.

93 projects · page 1 of 8

  • Exhibition

    Regional Quarries Carrick Quarry

    Material will be won by drill and blast methods and then will undergo crushing and screening to produce a range of hard rock products at a rate of up to 1 Million tonnes per annum.

    SSD-77991709

  • Closes 12 Nov · 6 days left

    MOD 3 - Increase to project output, footprint and lapse date

    Increase to project output, footprint and lapse date

    +2 moreMP07_0174-Mod-3

  • Closes 12 Nov · 6 days left

    MOD 4 - Increase to project output, footprint and lapse date

    Increase to project output, footprint and lapse date

    +2 moreMP07_0176-Mod-4

  • Closes 12 Nov · 6 days left

    MOD 3 - Increase to project output, footprint and lapse date

    Increase to project output, footprint and lapse date

    +2 moreMP07_0175-Mod-3

  • Assessment

    Gundary Solar Farm

    Development of a 320 MW solar farm with energy storage and associated infrastructure.

    SSD-48225958

  • Assessment

    Woodlawn Bioreactor - Modification 7

    Construction and operation of a reverse osmosis plant (ROP) adjacent to the existing leachate treatment plant. Transfer of treated water (permeate) from the ROP via pipeline and irrigation of permeate on grazing lands.

    MP10_0012-Mod-7

  • Assessment

    Marulan Quarry

    Proposal for a new hard rock quarry in Marulan to extract up to 500,000 tonnes per annum of hard rock aggregate products. The quarry is planned to operate for 18 years.

    SSD-65146459

  • Assessment

    MOD 3 - Infrastructure and Final Land Use Updates

    Ongoing use of as-built infrastructure

    MP07_0143-Mod-3

  • Response to Submissions

    Willavale Park Battery Energy Storage System

    Development of a 300 MW / 1200 MWh battery energy storage system and associated infrastructure and connection works

    SSD-78100252

  • Response to Submissions

    Canyonleigh Battery Energy Storage System

    Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 300MW/1200MWh and ancillary infrastructure.

    SSD-78247462

  • Response to Submissions

    MOD 4 - Material Source Area

    MOD 4 seeks to propose an area of disturbance, to obtain material for use onsite, providing suitable fill to raise the wall of the Woodlawn Tailings Storage Facility 4 (referred to as TSF4). MOD 4 does not propose an increase to the TSF4 wall height.

    MP07_0143-Mod-4

  • Response to Submissions

    Modification 4 Ardmore Park Quarry

    The proposed modification involves introducing limited controlled blasting within the existing approved extraction area

    MP07_0155-Mod-4