Search results
Showing NSW Planning Portal projects in Goulburn Mulwaree.
93 projects · page 1 of 8
Exhibition
Regional Quarries Carrick Quarry
Material will be won by drill and blast methods and then will undergo crushing and screening to produce a range of hard rock products at a rate of up to 1 Million tonnes per annum.
SSD-77991709
Closes 12 Nov · 6 days left
MOD 3 - Increase to project output, footprint and lapse date
Increase to project output, footprint and lapse date
+2 moreMP07_0174-Mod-3
Closes 12 Nov · 6 days left
MOD 4 - Increase to project output, footprint and lapse date
Increase to project output, footprint and lapse date
+2 moreMP07_0176-Mod-4
Closes 12 Nov · 6 days left
MOD 3 - Increase to project output, footprint and lapse date
Increase to project output, footprint and lapse date
+2 moreMP07_0175-Mod-3
Assessment
Gundary Solar Farm
Development of a 320 MW solar farm with energy storage and associated infrastructure.
SSD-48225958
Assessment
Woodlawn Bioreactor - Modification 7
Construction and operation of a reverse osmosis plant (ROP) adjacent to the existing leachate treatment plant. Transfer of treated water (permeate) from the ROP via pipeline and irrigation of permeate on grazing lands.
MP10_0012-Mod-7
Assessment
Marulan Quarry
Proposal for a new hard rock quarry in Marulan to extract up to 500,000 tonnes per annum of hard rock aggregate products. The quarry is planned to operate for 18 years.
SSD-65146459
Assessment
MOD 3 - Infrastructure and Final Land Use Updates
Ongoing use of as-built infrastructure
MP07_0143-Mod-3
Response to Submissions
Willavale Park Battery Energy Storage System
Development of a 300 MW / 1200 MWh battery energy storage system and associated infrastructure and connection works
SSD-78100252
Response to Submissions
Canyonleigh Battery Energy Storage System
Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 300MW/1200MWh and ancillary infrastructure.
SSD-78247462
Response to Submissions
MOD 4 - Material Source Area
MOD 4 seeks to propose an area of disturbance, to obtain material for use onsite, providing suitable fill to raise the wall of the Woodlawn Tailings Storage Facility 4 (referred to as TSF4). MOD 4 does not propose an increase to the TSF4 wall height.
MP07_0143-Mod-4
Response to Submissions
Modification 4 Ardmore Park Quarry
The proposed modification involves introducing limited controlled blasting within the existing approved extraction area
MP07_0155-Mod-4