Showing NSW Planning Portal projects in Mid-Western Regional.
86 projects · page 1 of 8
Assessment
Birriwa Solar - Modification 1
Proposed modification seeks to include additional lots, an alternative secondary access route and upgrade to part of the existing Birriwa Bus Route South road, increase in temporary workers accommodation and increase in BESS capacity and duration
+1 moreSSD-29508870-Mod-1
Assessment
Mayfair Solar Farm
The construction, operation and decommissioning of a 60MW solar farm including associated infrastructure and battery
SSD-60074458
Assessment
Mod 8 - Ulan West Continued Operations.
Extension of the existing underground mine to the west of the approved underground operations including extension to existing longwall panels and addition of four new longwall panels. The modification would extract an addition 38Mt of product coal.
MP08_0184-Mod-8
Assessment
Beryl Battery Energy Storage System
Development of a 100 MW / 200 MWh battery energy storage facility with associated infrastructure.
SSD-61460977
Assessment
MOD 3 - Pit 8 Extension
Extension of existing open-cut mining pits and realignment public infrastructure
SSD-6764-Mod-3
Assessment
Burrendong Wind Farm
Development of a wind farm, with up to 70 wind turbines and associated infrastructure
+1 moreSSD-8950984
Prepare EIS
Narragamba Solar Farm
Development of a 320 megawatt (AC) solar project including associated infrastructure.
+1 moreSSD-60575715
Determination
MOD 1 - Turbine and infrastructure changes
Increase in maximum tip height to 215 m, decrease in maximum number of turbines from 267 to 185, amendments to infrastructure and the transport route and increase native vegetation clearing limits.
+2 moreSSD-6696-Mod-1
Prepare EIS
Piambong Wind Farm
Construction and operation of the Piambong Wind Farm, which would consist of up to 81 turbines with a maximum tip height of up to 230m and a combined capacity of up to 551MW.
SSD-64777221
Prepare EIS
Puggoon Solar Farm
264 MW Solar Farm and 110 MW / 440 MWh Battery Energy Storage System
SSD-84365208
Prepare EIS
Wilpinjong Continuation Project
Extension of open cut mining activities (Pit 9 and Pit 10), ancillary activities and mine life by 4.5 years (until 2038).
SSD-125421990