Search results
Showing NSW Planning Portal projects in Narrabri Shire.
86 projects · page 1 of 8
Assessment
Narrabri Lateral Pipeline
Approximately 55 km long gas pipeline connecting the Narrabri Gas Project to the Queensland Hunter Gas Pipeline
SSI-53307723
Prepare Mod Report
MOD 2 - Bord and Pillar Mining Extension
Extension of the current bord and pillar mining operations at the Narrabri Mine to allow for extraction of additional coal reserves within the Hoskissons Coal Seam.
SSD-10269-Mod-2
Determination
Stoney Creek Battery Energy Storage System
Development of a 125 MW/1000MWh battery energy storage facility with associated infrastructure
SSD-75680468
Determination
MOD 10 - Increase to mine footprint and mine life
Increase in mine disturbance area, recovery of additional 30 million tonnes of ROM coal and increase in mine life.
MP09_0182-Mod-10
Determination
Narromine to Narrabri MOD 1 - Admin Changes
Changes requested to conditions including:1. MCoA E56 Erosion Threshold Velocities (ETV) Report2. MCoA E111 Arrow Travelling Stock Reserve (TSR) Alternative Arrangements3. Other minor amendments to conditions
+4 moreSSI-9487-Mod-1
Determination
Narrabri Underground Mine Stage 3 Extension Project
Extension of the approved Narrabri Underground Coal Mine
SSD-10269
Determination
Narrabri to North Star MOD 1 - Mod Incorrect Condition Ref
Admin mod - Modification 1 Modification to Amend Incorrect References
+2 moreSSI-7474-Mod-1
Prepare Mod Report
MOD 1 Powerline re-alignment and Battery System
Realignment of grid connection route and incorporation of a battery energy storage system
SSD-8387-Mod-1
Make your yarns count.