Search results

Showing NSW Planning Portal projects in Penrith.

321 projects · page 1 of 27

  • Closes 24 Nov · 18 days left

    Interlink Distribution Centre

    Approval is sought for the construction and 24‑hour operation of a single warehouse and distribution centre. The development includes an ancillary office, associated car parking, landscaping and hardstand areas.

    SSD-114570241

  • Closes 17 Nov · 11 days left

    Yiribana Logistics Estate - Warehouses 2 and 4

    Construction of two warehouse and distribution centre buildings with ancillary office space, car parking and hardstand areas, landscaping, minor earthworks, site servicing and signage within the Yiribana Logistics Estate

    SSD-103574706

  • Assessment

    Barings Luddenham Industrial Park - Mod 1 Bulk Earthworks amendments

    The proposed modification involves a range of civil engineering amendments to the approved site preparation works and bulk earthworks activities.

    SSD-48438209-Mod-1

  • Assessment

    Aspect Industrial Estate Stage 6 Development (WH4)

    Construction and operation of Warehouse 4 in the Aspect Industrial Estate

    SSD-98407710

  • Assessment

    SEED - Stage 1B

    Construction and operation of 5 warehouses, a cafe and supporting infrastructure.

    SSD-99079487

  • Assessment

    Modification 4 - Site Layout and Leachate Treatment

    The modification proposes to reduce the area of the Advanced Waste Treatment Facility site to accommodate an expansion to the Elizabeth Drive Landfill, and provide leachate treatment infrastructure to replace leachate ponds to be removed as part of

    MP06_0185-Mod-4

  • Assessment

    Aspect Industrial Estate MOD 12 - Reconfiguration of Lots 4 and 5

    Change to the warehouse footprint and on-lot configuration of the approved Lot 4 and Lot 5 into a single building identified as “Warehouse 4”.

    SSD-10448-Mod-12

  • Assessment

    Mamre Road Data Centre Campus

    Construction and operation of a data centre campus with a power capacity of 1 GW including six four-storey data centre buildings, 936 cooling units, 852 diesel back-up generators and 14,430 kl of diesel storage, internal roads and car parking.

    SSD-92743706

  • Assessment

    Yiribana Logistics Estate MOD 2 – Civil Works Amendments

    The modification proposes changes to the estate road layout, additional bulk earthworks, and revised stormwater infrastructure and retaining walls, without changing the approved land use, warehouse layout, gross floor area or parking.

    SSD-10272349-Mod-2

  • Assessment

    Lord Sheffield Circuit, Penrith MOD 2 - Amendments to Level 1

    Modifications include the replacement of the childcare with additional commercial space on Level 1, an additional affordable housing unit and administrative amendments to the conditions of consent.

    SSD-78665709-Mod-2

  • Assessment

    Yiribana Logistics Estate MOD 3 - Warehouse 3 Design Changes

    Modifications to the design of Warehouse 3 to accommodate changes to the approved internal layout, built form, loading dock and driveway arrangements to meet tenant operational requirements, including introduction of a click-and-collect operation.

    SSD-10272349-Mod-3

  • Assessment

    DHL Logistics Facility, Badgerys Creek (North)

    Construction and fit out of two warehouse buildings and ancillary office space, hardstand, loading docks and car parking, landscaping and signage, located within the Burrah Park estate.

    SSD-70817958

Make your yarns count.

Build a campaign, share with your community, and see the results.