Search results
Showing NSW Planning Portal projects in Penrith.
321 projects · page 1 of 27
Closes 24 Nov · 18 days left
Interlink Distribution Centre
Approval is sought for the construction and 24‑hour operation of a single warehouse and distribution centre. The development includes an ancillary office, associated car parking, landscaping and hardstand areas.
SSD-114570241
Closes 17 Nov · 11 days left
Yiribana Logistics Estate - Warehouses 2 and 4
Construction of two warehouse and distribution centre buildings with ancillary office space, car parking and hardstand areas, landscaping, minor earthworks, site servicing and signage within the Yiribana Logistics Estate
SSD-103574706
Assessment
Barings Luddenham Industrial Park - Mod 1 Bulk Earthworks amendments
The proposed modification involves a range of civil engineering amendments to the approved site preparation works and bulk earthworks activities.
SSD-48438209-Mod-1
Assessment
Aspect Industrial Estate Stage 6 Development (WH4)
Construction and operation of Warehouse 4 in the Aspect Industrial Estate
SSD-98407710
Assessment
SEED - Stage 1B
Construction and operation of 5 warehouses, a cafe and supporting infrastructure.
SSD-99079487
Assessment
Modification 4 - Site Layout and Leachate Treatment
The modification proposes to reduce the area of the Advanced Waste Treatment Facility site to accommodate an expansion to the Elizabeth Drive Landfill, and provide leachate treatment infrastructure to replace leachate ponds to be removed as part of
MP06_0185-Mod-4
Assessment
Aspect Industrial Estate MOD 12 - Reconfiguration of Lots 4 and 5
Change to the warehouse footprint and on-lot configuration of the approved Lot 4 and Lot 5 into a single building identified as “Warehouse 4”.
SSD-10448-Mod-12
Assessment
Mamre Road Data Centre Campus
Construction and operation of a data centre campus with a power capacity of 1 GW including six four-storey data centre buildings, 936 cooling units, 852 diesel back-up generators and 14,430 kl of diesel storage, internal roads and car parking.
SSD-92743706
Assessment
Yiribana Logistics Estate MOD 2 – Civil Works Amendments
The modification proposes changes to the estate road layout, additional bulk earthworks, and revised stormwater infrastructure and retaining walls, without changing the approved land use, warehouse layout, gross floor area or parking.
SSD-10272349-Mod-2
Assessment
Lord Sheffield Circuit, Penrith MOD 2 - Amendments to Level 1
Modifications include the replacement of the childcare with additional commercial space on Level 1, an additional affordable housing unit and administrative amendments to the conditions of consent.
SSD-78665709-Mod-2
Assessment
Yiribana Logistics Estate MOD 3 - Warehouse 3 Design Changes
Modifications to the design of Warehouse 3 to accommodate changes to the approved internal layout, built form, loading dock and driveway arrangements to meet tenant operational requirements, including introduction of a click-and-collect operation.
SSD-10272349-Mod-3
Assessment
DHL Logistics Facility, Badgerys Creek (North)
Construction and fit out of two warehouse buildings and ancillary office space, hardstand, loading docks and car parking, landscaping and signage, located within the Burrah Park estate.
SSD-70817958
Make your yarns count.