Search results

Showing NSW Planning Portal projects in Port Stephens.

102 projects · page 1 of 9

  • Assessment

    Stockton Sand Quarry Dredging

    Boral is seeking approval for continued operations at the site through a State Significant Development (SSD) application. Boral propose to extract sand from a former sandpit by excavator and dredging.

    SSD-9490

  • Assessment

    Residential Flat Building at 42 Donald Street and 5-7 Church Street, Nelson Bay

    The project involves developing a residential flat building with 55 units at 42 Donald Street, Nelson Bay, NSW 2315. The site includes three lots and spans two land use zones.

    SSD-83366960

  • Assessment

    Holcim Salt Ash Sand Operations

    Holcim propose to extract and process up to 550,000 tonnes per annum (tpa) of sand at its Salt Ash site using dry extraction and dredging techniques and to import up to 200,000 tpa of sand from their Tanilba Bay, Anna Bay and other local operations.

    SSD-9099356

  • Response to Submissions

    Bobs Farm Sand Quarry

    Sand extraction project that would up to 530,000 tonnes on sand per year for up to 10 years. The project would involve dry sand extraction only with no extraction at or below the groundwater table.

    SSD-99860959

  • Determination

    Fern Bay Residential MOD 7 - Road Design

    /

    MP06_0250Mod7

  • Determination

    Mod 1 - Irrigation Alteration

    DA05-00-173-Mod-1

  • Prepare Mod Report

    Mackas Sand Continued Operations Modification 4

    Continued extraction of windblow and for another 20 years.

    MP08-0142-Mod-4

  • Determination

    Cabbage Tree Road Sand Quarry MOD 2 - Sand Wash

    Application to install a sand wash plant and ancillary infrastructure on the site

    SSD-6125-Mod-2

  • Prepare EIS

    d’Albora Marina Nelson Bay Hotel

    The demolition of existing structures on site and the construction of a hotel and ancillary uses, including retail and hospitality tenancies, a boat maintenance workshop, an outdoor and rooftop terrace, parking and landscaping.

    SSD-77938524

  • Determination

    Fern Bay Residential MOD 6 - Conditions

    /

    MP06_0250Mod6

  • Determination

    Tanilba Quarry MOD 1 - Revised Offset Strategy

    Silbelco , following consultation with OEH, proposes to alter its approved Biodiversity Offset Strategy , by substituting one parcel of conservation land for another with no loss of conservation values or connectivity.

    MP09_0091-Mod-1

  • Determination

    Tomago Asphalt Facility

    MP07_0031

Make your yarns count.

Build a campaign, share with your community, and see the results.