Search results
Showing NSW Planning Portal projects in Strathfield.
42 projects · page 1 of 4
Assessment
Aussie Skips Recycling - Bellfrog St Site upgrades
To increase the capacity of the Bellfrog Street site to receive and process up to 250,000 tonnes of general solid waste per annum
SSD-67497708
Assessment
Mod 16 - Alternative Operational Traffic Volumes
Changes to site‑wide traffic management from fixed vehicle numbers to a Passenger Car Unit (PCU) based framework to support operational flexibility for the future use of undeveloped sites and to maximise the throughput of the ILC.
MP05_0147-Mod-16
Response to Submissions
Enfield Material Recovery Facility Expansion
Increasing throughput at the existing Enfield MRF from 99,900 t/year to 200,000 t/year by increasing utilisation of the existing site equipment and processes
SSD-94439711
Prepare Mod Report
MOD 1 - Change in BESS Technology
Modification to the battery technology to a 150 MW / 600 MWh BESS.
SSD-77443244-Mod-1
Determination
Metro West MOD 1 - Sydney Metro West
An administrative modification to Conditions A11, C10 and D25 to improve clarity of intent and timing requirements.
+6 moreSSI-10038-Mod-1
Determination
Syd Metro - Metro West - Westmead to The Bays - Mod 2 - Clyde
The modification relates to major civil construction at the Clyde stabling and maintenance facility include relocation and extension of the Rosehill dive structure and realignment of Kay and Unwin streets.
+6 moreSSI-10038-Mod-2
Determination
Meriden Senior School Mod 2- Changes to condition A7
Modification to amend the consent relating to the increase of the student capacity to occur following completion of the Design and Creative Arts Building, rather than completion of the development.
SSD-39005127-Mod-2
Determination
Metro West MOD 4 - Admin mod
Proposed amendment to conditions D26 (naming of heritage item) and D122 (the need for updated groundwater report to consider future stages of project).
+6 moreSSI-10038-Mod-4
Determination
Metro West MOD 5 - Metro West Concept and Stage 1
Additional clearing of mangrove communities is required at the Clyde Stabling and Maintenance Facility for site and water management infrastructure. This will required additional biodiversity offset credits to be retired.
+6 moreSSI-10038-Mod-5
Determination
Enfield Intermodal Terminal - Mod 15 - Tarpaulin Factory
To modify the Enfield Intermodal Logistics Centre consent to reflect development consent (DA 2022/68) granted by Strathfield Local Planning Panel on 3 November 2022 for the reuse of the Tarpaulin Factory Building for a garden centre
MP05_0147-Mod-15
Determination
Syd Metro - Metro West - Westmead to The Bays - Mod 3 - Admin
Modification of Conditions A9, E9, E22, E44. Updates to include Unexpected Finds procedures and Notification after scheduling out-of-hours work.
+6 moreSSI-22765520-Mod-3
Make your yarns count.
Build a campaign, share with your community, and see the results.