Search results
Showing NSW Planning Portal projects in Tamworth Regional.
43 projects · page 1 of 4
Closes 26 Nov · 20 days left
New England REZ Transmission Project
Development of new dual 500kV transmission lines between Muswellbrook and the New England REZ and new 500kV and 330kV lines to connect five new energy hubs within the New England REZ. This project is declared CSSI.
+6 moreSSI-74175972
Assessment
Rushes Ck Mod-6 - Stage 2 Reconfiguration & Water Mgt
The mod seeks to: - delete one farm in Stage 2 - reconfigure Farms 1 & 4 to support the balance of birds for Stage 2 - amend the location of internal roads & associated infrastructure - install a water recycling system and overflow spillway.
SSD-7704-Mod-6
Assessment
Garoo Solar Farm
Construction and operation of a 155 MW Solar Farm and 360 MW / 1,440 MWh Battery Energy Storage System.
SSD-79747209
Assessment
Kingswood BESS - Modification 1
Modification to the project layout, maximum energy storage capacity, transmission line connection options, the site access location and minor adjustments to the existing 66 kV transmission line.
SSD-63207219-Mod-1
Response to Submissions
Bendemeer Solar Farm
Development of a 255 MW solar farm with energy storage and associated infrastructure.
SSD-36651552
Response to Submissions
Tamworth Battery Energy Storage System
Development of a 200 MW battery energy storage facility with associated infrastructure
SSD-23830229
Determination
Baiada Integrated Poultry Processing Facility
Construction and operation of an integrated poultry processing plant with the capacity to process 3 million birds per week.
SSD-9394
Recommendation
Tangaratta Feedmill
Construction and operation of a feedmill with the capacity to process up to 17,500 tonnes pf poultry feed per week. The new feedmill will incorporate a new milling tower, storage silos, boiler house, maintenance workshop and administration building
SSD-58801472
Prepare EIS
Bendemeer Wind Farm
Construction and operation of a wind farm with up to 51 wind turbines and associated infrastructure.
SSD-78015999
Determination
Modification 6 Wastewater Treatment Plant Changes
This modification is seeking approval for the staged delivery of wastewater treatment at the site.
SSD-9394-Mod-6
Determination
Middlebrook Solar Farm MOD 1
Changes to development footprint, relocation of the private property access and increase in height of the on-site substation and switchyard.
SSD-10455-Mod-1
Make your yarns count.