Search results

Showing NSW Planning Portal projects in Upper Hunter Shire.

28 projects · page 1 of 3

  • Closes 26 Nov · 20 days left

    New England REZ Transmission Project

    Development of new dual 500kV transmission lines between Muswellbrook and the New England REZ and new 500kV and 330kV lines to connect five new energy hubs within the New England REZ. This project is declared CSSI.

    +6 moreSSI-74175972

  • Assessment

    Goulburn River Solar Farm MOD 1

    The Modification is to enable the subdivision of up to five lots within the Development Footprint to facilitate ownership transfer of the electrical infrastructure assets of the Project.

    SSD-33964533-Mod-1

  • Response to Submissions

    Upper Hunter Battery Energy Storage System

    Battery Energy Storage System (BESS) with a capacity of 400MW/ 920MWh and associated infrastructure

    +1 moreSSD-61707209

  • Prepare Mod Report

    MOD 1 - Battery Energy Storage System

    Addition of a Battery Energy Storage System (BESS) and the modifications to sections of the main access route to accommodate OSOM vehicles

    +2 moreSSD-10315-Mod-1

  • Determination

    Goulburn River Solar Farm

    Development of a 450 MW solar farm, energy storage and associated infrastructure.

    SSD-33964533

  • Determination

    Liverpool Range Quarry

    A proposed hard rock quarry that would extract, process and transport up to 700,000 tonnes per annum of hard rock material to supply construction material to the approved Liverpool Range Wind Farm (LRWF) Project (SSD-6696).

    SSD-68063715

  • Determination

    MOD 1 - Minor Administrative Changes

    Minor administrative changes primarily relating to clarifying timing of post approval documentation.

    +3 moreSSI-48323210-Mod-1

  • Determination

    Central-West Orana REZ Transmission

    Development of new twin double circuit 500 kV transmission lines between Wollar and the proposed substations at Merotherie and Elong Elong, and connections from these lines to renewable energy generation and storage projects in the CWO REZ

    +3 moreSSI-48323210

  • Determination

    Hills of Gold Wind Farm.

    A wind farm and associated infrastructure located 50 km south-east of Tamworth and 8 km south of Nundle, comprising up to 70 wind turbines, battery storage and grid connection. IPC link: https://www.ipcn.nsw.gov.au/

    +2 moreSSD-9679

  • Determination

    MOD 3 - Strategic Offset Delivery Agreement

    Modification to allow the project to meet its biodiversity offset obligation via delivery of a Strategic Offset Delivery Agreement (SODA).

    +3 moreSSI-48323210-Mod-3

  • Determination

    MOD 1 - Lapse Date Extension

    Extension of Project Approval lapse date

    +9 moreMP06_0286-Mod-1

  • Determination

    MOD 3 - Turbine and infrastructure refinements

    Reduction in maximum number of turbines from 185 to 173, refinements to infrastructure and public road upgrade development corridor.

    +2 moreSSD-6696-Mod-3

Make your yarns count.

Build a campaign, share with your community, and see the results.