Showing NSW Planning Portal projects in Upper Hunter Shire.
28 projects · page 1 of 3
Closes 26 Nov · 20 days left
New England REZ Transmission Project
Development of new dual 500kV transmission lines between Muswellbrook and the New England REZ and new 500kV and 330kV lines to connect five new energy hubs within the New England REZ. This project is declared CSSI.
+6 moreSSI-74175972
Assessment
Goulburn River Solar Farm MOD 1
The Modification is to enable the subdivision of up to five lots within the Development Footprint to facilitate ownership transfer of the electrical infrastructure assets of the Project.
SSD-33964533-Mod-1
Response to Submissions
Upper Hunter Battery Energy Storage System
Battery Energy Storage System (BESS) with a capacity of 400MW/ 920MWh and associated infrastructure
+1 moreSSD-61707209
Prepare Mod Report
MOD 1 - Battery Energy Storage System
Addition of a Battery Energy Storage System (BESS) and the modifications to sections of the main access route to accommodate OSOM vehicles
+2 moreSSD-10315-Mod-1
Determination
Goulburn River Solar Farm
Development of a 450 MW solar farm, energy storage and associated infrastructure.
SSD-33964533
Determination
Liverpool Range Quarry
A proposed hard rock quarry that would extract, process and transport up to 700,000 tonnes per annum of hard rock material to supply construction material to the approved Liverpool Range Wind Farm (LRWF) Project (SSD-6696).
SSD-68063715
Determination
MOD 1 - Minor Administrative Changes
Minor administrative changes primarily relating to clarifying timing of post approval documentation.
+3 moreSSI-48323210-Mod-1
Determination
Central-West Orana REZ Transmission
Development of new twin double circuit 500 kV transmission lines between Wollar and the proposed substations at Merotherie and Elong Elong, and connections from these lines to renewable energy generation and storage projects in the CWO REZ
+3 moreSSI-48323210
Determination
Hills of Gold Wind Farm.
A wind farm and associated infrastructure located 50 km south-east of Tamworth and 8 km south of Nundle, comprising up to 70 wind turbines, battery storage and grid connection. IPC link: https://www.ipcn.nsw.gov.au/
+2 moreSSD-9679
Determination
MOD 3 - Strategic Offset Delivery Agreement
Modification to allow the project to meet its biodiversity offset obligation via delivery of a Strategic Offset Delivery Agreement (SODA).
+3 moreSSI-48323210-Mod-3
Determination
MOD 1 - Lapse Date Extension
Extension of Project Approval lapse date
+9 moreMP06_0286-Mod-1
Determination
MOD 3 - Turbine and infrastructure refinements
Reduction in maximum number of turbines from 185 to 173, refinements to infrastructure and public road upgrade development corridor.
+2 moreSSD-6696-Mod-3