Withdrawn · MP08_0184-Mod-9 · Major Project

Mod 9 - Proposed Infrastructure Realignment

Amendment of the location of surface infrastructure approved under Mod 6

Project details

Application
MP08_0184-Mod-9
Status
Withdrawn
Type
SSD Modifications
Property
New South Wales Australia
Development type
Coal Mining

How do you want to help?

Run a campaign for this project

Set up the objections once. Supporters write and lodge their own letters in their own words.

  • Unlimited AI help to build and review your campaign
  • Invite your team to build it with you
  • A public page open to unlimited supporters

Free to set up. $500 when you publish.

Know someone who'd organise this?

Campaigns get far more submissions than individual letters. Send this to a resident group, environment group, or local councillor who could run one.

Just want to object yourself? Lodge on the Planning Portal

Where this project is up to

Withdrawn

This application is no longer going ahead in its current form.

Last checked on the Planning Portal
4 Nov 2026

Other open projects in Mid-Western Regional

  • Prepare EIS

    Puggoon Solar Farm

    264 MW Solar Farm and 110 MW / 440 MWh Battery Energy Storage System

    Mid-Western RegionalSSD-84365208

  • Prepare EIS

    Wilpinjong Continuation Project

    Extension of open cut mining activities (Pit 9 and Pit 10), ancillary activities and mine life by 4.5 years (until 2038).

    Mid-Western RegionalSSD-125421990

  • Prepare EIS

    Orana Wind Farm

    Construction and operation of a wind farm with up to 92 wind turbines, battery storage and associated infrastructure.

    Warrumbungle Shire+1 moreSSD-58260958

  • Prepare EIS

    Narragamba Solar Farm

    Development of a 320 megawatt (AC) solar project including associated infrastructure.

    Mid-Western Regional+1 moreSSD-60575715

  • Prepare EIS

    Yarrabin (Phoenix) Pumped Hydro

    Development of a 810 MW / 9,720 MWh pumped hydro energy storage and generation project, grid connection and ancillary infrastructure.

    Dubbo Regional+1 moreSSD-59906734

  • Prepare EIS

    Piambong Wind Farm

    Construction and operation of the Piambong Wind Farm, which would consist of up to 81 turbines with a maximum tip height of up to 230m and a combined capacity of up to 551MW.

    Mid-Western RegionalSSD-64777221

All projects in Mid-Western Regional

How a campaign works

  1. 01

    Build your campaign

    Research the project, frame the objections, and add your own views.

  2. 02

    Share one link

    Get a public campaign page to share with your community.

  3. 03

    Lodge submissions, fast and easy

    Supporters pick the points that apply, add their own views, and lodge in their own words.

  4. 04

    See what's working

    Follow visits, signups, and lodged letters as they come in, and see which channel brings people in.

Make your yarns count.

Build a campaign, share with your community, and see the results.