Planning projects in Mid-Western Regional
86 State significant and State-assessed projects in Mid-Western Regional are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Mid-Western Regional is on exhibition right now. See everything open across NSW.
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Puggoon Solar Farm
264 MW Solar Farm and 110 MW / 440 MWh Battery Energy Storage System
Mid-Western RegionalSSD-84365208
Prepare EIS
Wilpinjong Continuation Project
Extension of open cut mining activities (Pit 9 and Pit 10), ancillary activities and mine life by 4.5 years (until 2038).
Mid-Western RegionalSSD-125421990
Prepare EIS
Orana Wind Farm
Construction and operation of a wind farm with up to 92 wind turbines, battery storage and associated infrastructure.
Warrumbungle Shire+1 moreSSD-58260958
Prepare EIS
Narragamba Solar Farm
Development of a 320 megawatt (AC) solar project including associated infrastructure.
Mid-Western Regional+1 moreSSD-60575715
Prepare EIS
Yarrabin (Phoenix) Pumped Hydro
Development of a 810 MW / 9,720 MWh pumped hydro energy storage and generation project, grid connection and ancillary infrastructure.
Dubbo Regional+1 moreSSD-59906734
Prepare EIS
Piambong Wind Farm
Construction and operation of the Piambong Wind Farm, which would consist of up to 81 turbines with a maximum tip height of up to 230m and a combined capacity of up to 551MW.
Mid-Western RegionalSSD-64777221
Prepare EIS
Mavis Solar Farm
A 250 MW Solar farm, associated infrastructure and battery energy storage system
Mid-Western RegionalSSD-66675960
Recently assessed or decided
Withdrawn
New Track Between Bylong Loop and Bylong Tunnel
Construction of a new track between the existing Bylong Loop and the western portal of the Bylong Tunnel.
Mid-Western RegionalSSI-5728
Withdrawn
Wilpinjong Modification 1 - Water Supply Infrastructure
Construct and operate additional water supply infrastructure
Mid-Western RegionalSSD-6764-Mod-1
Withdrawn
Mod 1 - Realignment of site access and subdivision for the substation
Relocation of the section of the main site access route which traverses the TransGrid substation lot and for subdivision of land within the solar farm to create a separate parcel for electrical assets
Mid-Western RegionalSSD-9254-Mod-1
Withdrawn
Central West Orana REZ Transmission – Wollar Substation Upgrade
A component of the Central-West Orana REZ Transmission Project, the upgrade of the existing Wollar substation includes expanding the hardstand area and switchyard, electrical works and structural strengthening works.
Mid-Western RegionalSSI-27741480
Withdrawn
Mavis Solar Farm
Development of a 250 MW solar farm and associated infrastructure, including battery storage facility.
Mid-Western RegionalSSD-65032958
Withdrawn
Barneys Reef Wind Farm
Development of a 441 MW wind farm, including 63 turbines (280m), battery storage and associated infrastructure.
Mid-Western RegionalSSD-24106966
Withdrawn
Mod 9 - Proposed Infrastructure Realignment
Amendment of the location of surface infrastructure approved under Mod 6
Mid-Western RegionalMP08_0184-Mod-9
Determination
St Matthews Catholic College
Development proposal to build a new secondary school comprising 5 buildings and associated landscaping works.
Mid-Western RegionalSSD-9872
Determination
Mod 2 - Site Access and Subdivision
Realignment of site access and subdivision, biodiversity offset credits recalculation, increase in over dimensional vehicles and administrative update to schedule of land
Mid-Western RegionalSSD-9254-Mod-2
Determination
Charbon MOD 2 - Rehabilitation
The modification is seeking to allow: - the receipt of Coarse Coal Reject (CCR) from Clarence Colliery by rail for rehabilitation; and - the extension of rail water transfer to Airly Mine until 31 January 2037
Mid-Western RegionalMP08_0211-Mod-2
Determination
Beryl Solar Farm
Development of a 87 MW solar farm and associated infrastructure
Mid-Western RegionalSSD-8183
Determination
MOD 7 - Alternative Offset Site
Modification seeking approval for an alternative biodiversity offset site.
Mid-Western RegionalMP08_0184-Mod-7
Determination
Site Verification Certificate - Bowdens Silver Project Site
Mid-Western RegionalSVC-8701
Determination
MOD 3 – changes to vehicle movements and increase in panel height
Changes to vehicle movements and increase in panel height
Mid-Western RegionalSSD-9254-Mod-3
Determination
Crudine Ridge Wind Farm
Construction and operation of a 37 turbine wind farm, with a capacity to generate up to 135 MW of electricity, plus ancillary infrastructure (including substation, grid connection, access tracks and road upgrades along the project transport route).
Bathurst Regional+1 moreSSD-6697
Determination
MOD 1 - Project layout update
Update the disturbance footprint to align with the constructed project
Mid-Western RegionalSSD-8183-Mod-1
Determination
Moolarben Stage 2 - Mod 4 - UG2 Modification
Minor longwall extension
Mid-Western RegionalMP08_0135-Mod-4
Determination
MOD 1 - Access Road Realignment
Change to the access road location and an associated adjustment to the project boundary
Mid-Western RegionalSSD-10452-Mod-1
Determination
MOD 2 - Workers Accommodation Facility
Incorporate an on-site accommodation facility and to excise four parcels of Crown Land from the development application area
Mid-Western RegionalSSD-6764-Mod-2