Withdrawn · MP11_0094-Mod-4 · Major Project
Modification 3 Eastern Gully Stormwater Channel
Design modifications to allow for the realignment of the open channel gravity drainage for full length of channel. The change to an open channel gravity drainage would mean that no pond outlet is required.
Project details
- Application
- MP11_0094-Mod-4
- Status
- Withdrawn
- Type
- SSD Modifications
- Council area
- Wollongong City
- Property
- Reddalls Road Kembla Grange New South Wales Australia 2526
- Development type
- Waste collection, treatment and disposal
How do you want to help?
Run a campaign for this project
Set up the objections once. Supporters write and lodge their own letters in their own words.
- Unlimited AI help to build and review your campaign
- Invite your team to build it with you
- A public page open to unlimited supporters
Free to set up. $500 when you publish.
Know someone who'd organise this?
Campaigns get far more submissions than individual letters. Send this to a resident group, environment group, or local councillor who could run one.
Just want to object yourself? Lodge on the Planning Portal
Where this project is up to
Withdrawn
This application is no longer going ahead in its current form.
- Last checked on the Planning Portal
- 4 Nov 2026
Other open projects in Wollongong City
Closes 13 Nov · 7 days left
Mixed use development with in-fill affordable housing - 21 Auburn Street, Wollongong
Mixed use development with in-fill affordable housing, 21 Auburn Street Wollongong.
Wollongong CitySSD-72686208
Prepare EIS
Bluescope Steel - HyKembla Project
The development involves the construction and operation of a hydrogen electrolyser plant and associated infrastructure for use within existing iron and steel making processes at the Port Kembla Steelworks and hydrogen refuelling station.
Wollongong CitySSD-45936713
Prepare EIS
Shop Top development Kenny Street Wollongong
Demolition of existing structures and construction of a 38 storey shop top development comprising 173 apartments (including 15% affordable housing) with ground floor commercial space and child care centre with basement parking.
Wollongong CitySSD-122410990
Prepare EIS
Illawarra Firming Power Station
Development of a 300 - 400 MW gas turbine firming power station and associated infrastructure, including turbine control units, gas and transmission line connections, fuel oil storage, water infrastructure and administrative facilities.
Wollongong CitySSD-114188738
Prepare EIS
Mixed Use Development at 7-15 Gladstone Avenue, Wollongong
Demolition of structures, excavation for basement carpark, construction of a mixed-use development with ground floor commercial premise and 163 residential units (inclusive of 22 affordable housing units)
Wollongong CitySSD-128280241
Prepare EIS
22-30 Kenny Street Mixed Use Development
Mixed use development proposing an uplift to an existing consent comprising of a hotel and shot top housing The amendments involve an increase in approved dwellings from 105 to 258 and hotel apartments from 107 to 140.
Wollongong CitySSD-132890240
How a campaign works
01
Build your campaign
Research the project, frame the objections, and add your own views.
02
Share one link
Get a public campaign page to share with your community.
03
Lodge submissions, fast and easy
Supporters pick the points that apply, add their own views, and lodge in their own words.
04
See what's working
Follow visits, signups, and lodged letters as they come in, and see which channel brings people in.
Make your yarns count.
Build a campaign, share with your community, and see the results.