Planning projects in Wollongong City
148 State significant and State-assessed projects in Wollongong City are listed on the NSW Planning Portal. 1 is on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.
Open for submissions
Closes 13 Nov · 7 days left
Mixed use development with in-fill affordable housing - 21 Auburn Street, Wollongong
Mixed use development with in-fill affordable housing, 21 Auburn Street Wollongong.
Wollongong CitySSD-72686208
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Bluescope Steel - HyKembla Project
The development involves the construction and operation of a hydrogen electrolyser plant and associated infrastructure for use within existing iron and steel making processes at the Port Kembla Steelworks and hydrogen refuelling station.
Wollongong CitySSD-45936713
Prepare EIS
Illawarra Firming Power Station
Development of a 300 - 400 MW gas turbine firming power station and associated infrastructure, including turbine control units, gas and transmission line connections, fuel oil storage, water infrastructure and administrative facilities.
Wollongong CitySSD-114188738
Prepare EIS
Shop Top development Kenny Street Wollongong
Demolition of existing structures and construction of a 38 storey shop top development comprising 173 apartments (including 15% affordable housing) with ground floor commercial space and child care centre with basement parking.
Wollongong CitySSD-122410990
Prepare EIS
Mixed Use Development at 7-15 Gladstone Avenue, Wollongong
Demolition of structures, excavation for basement carpark, construction of a mixed-use development with ground floor commercial premise and 163 residential units (inclusive of 22 affordable housing units)
Wollongong CitySSD-128280241
Prepare EIS
22-30 Kenny Street Mixed Use Development
Mixed use development proposing an uplift to an existing consent comprising of a hotel and shot top housing The amendments involve an increase in approved dwellings from 105 to 258 and hotel apartments from 107 to 140.
Wollongong CitySSD-132890240
Prepare EIS
Mixed use with affordable housing - Crown Street
The proposal is for a mixed use development comprising: - retention of heritage facade - construction of an 18-storey building with two levels of retail/commercial and residential above - three levels of basement parking
Wollongong CitySSD-76386708
Prepare EIS
15 Nicholson Road, Woonona
The proposed development is for 3x RFBs comprising approximately 133 units, consisting of 93 three-bedroom, 27 two-bedroom and 13 one-bedroom units, inclusive of 13% of GFA to be dedicated to affordable housing for a period of 15 years.
Wollongong CitySSD-122937240
Prepare EIS
Coalcliff Eco-Tourist Facilities
- 24x eco-tourist cabins (72 guests) and communal pavilion - Multi-purpose amenities building - Public walking track, observation deck/s and parking - Seating areas and potential viewing decks within a cleared area - Vegetation restoration
Wollongong CitySSD-76132994
Prepare EIS
Springhill Battery Energy Storage System
Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 100 MW/200 MWh, and ancillary infrastructure.
Wollongong CitySSD-91409709
Prepare EIS
Escarpment Resort Avondale
A concept development application for the Escarpment Resort Avondale, comprising: - an ecotourist facility - environmental facilities - environmental protection works.
Wollongong CitySSD-69465207
Prepare EIS
Cement Australia Port Kembla Terminal Upgrade
The upgrade of the existing facility will ensure the continued supply of cementitious materials following the closure of the Glebe Island facility.
Wollongong CitySSD-143203240
Prepare EIS
Northcliffe Drive and Stuart Road, Warrawong, Affordable Housing
Demolition of six single dwellings and construction of two 3-storey residential flat buildings, with 54 units and 24 car parking spaces.
Wollongong CitySSD-110146493
Prepare EIS
Residential Flat Building at 378 - 384 Princes Highway, Dapto
Construction of 2 residential flat buildings up to 4 storeys with basement car parking. The proposal includes a concurrent rezoning.
Wollongong CitySSD-124038238
Prepare EIS
Byamee Street, Infill Affordable Housing
Construction of three infill affordable housing buildings ranging in height from 4 to 8 storeys and comprising of 75 units.
Wollongong CitySSD-130203993
Prepare EIS
Metropolitan Continuation Project
12 year extension of Metropolitan Coal Mine, extending the 300 series longwalls to the west of exiting operations and adding 400 series longwalls constructing a Ventilation Air Methane (VAM) abatement plant
Wollongong City+2 moreSSD-141889240
Prepare EIS
In-fill Affordable Housing - Towradgi
The proposed development will seek consent for the demolition of existing structures, construction of residential flat buildings and townhouses, and associated landscaping.
Wollongong CitySSD-150640740
Prepare EIS
WIN Sports and Entertainment Precinct
Demolition of the existing WIN Arena, North & South stands of WIN stadium & construction & operation of a new WIN Arena, new North and South stands, upgrades to the East hill, works to the southern training field, landscaping and public domain works.
Wollongong CitySSD-144045492
Prepare EIS
New Medical Centre Wollongong
Construction and operation of a six storey medical centre with specialist oncology services and an ancillary café and pharmacy. Associated works include demolition, underground car parking and landscaping.
Wollongong CitySSD-123305238
Recently assessed or decided
Withdrawn
Mod 4 - Russell Vale Preliminary Works Bellambi Creek Gully Flood Mitigation
<p>Modifications to the Russell Vale Colliery Preliminary Works Project Approval regarding requirements for works on Bellambi Creek Gully</p>
Wollongong CityMP10_0046-Mod-4
Withdrawn
Port Kembla to Wilton Gas Pipeline
An approximately 37 km underground high pressure gas pipeline from Port Kembla to Wilton
Wollongong City+1 moreSSI-10043
Withdrawn
Dendrobium Mine Extension Project
Proposed extension of mining within Area 5 and extension of the life of Dendrobium Mine until 2041.
Wollongong City+2 moreSSI-33143123
Withdrawn
Port Kembla General Cargo Handling Facility Mod1
Modification of the existent approval to remove the 2.77 million per annum cap to enable increased delivery of freight by rail, and introducing a cap on the number of tonnes of cargo transported via road annually.
Wollongong CitySSI-60148731
Withdrawn
Port Kembla Power Station
Construction and operation of a gas fired power station
Wollongong CitySSI-30358083
Withdrawn
MOD 2 - Port Kembla Outer Harbour Reconfiguration
Modification to Port Kembla Outer Harbour Concept Plan and Stage 1 approval to realign reclamation area, reconfigure terminal layout, relocate rail infrastructure, enable potential new uses including offshore wind support, and revise project staging.
Wollongong CitySSI-76713713
Withdrawn
MOD 1 - Coal Transport
Transport of coal between Port Kembla Coal Terminal and Dendrobium Coal Preparation Plant via private roads
Wollongong CityMP09_0013-Mod-1
Withdrawn
Wollongong Private Hospital Expansion
Demolition of non-hospital buildings and erection of a nine-storey hospital extension with basement carpark, comprising 191 additional beds, emergency department, expansion of operating theatres, radiology and intensive care units and landscaping.
Wollongong CitySSD-30240120
Withdrawn
Alterations and additions to an approved mixed-use development with in-fill affordable housing - 22-30 Kenny Street, Wollongong
Alterations and additions to an approved mixed use development, to include additional apartments, hotel apartments, parking, an additional 6 levels, alterations to the apartment mix and residential GFA, additional basement level and other internal a
Wollongong CitySSD-83706992
Withdrawn
MOD 4 – Increase Bulk Cargo
Modification to Port Kembla Outer Harbour Concept Plan and Stage 1 approval to realign reclamation area, reconfigure terminal layout, relocate rail infrastructure, enable potential new uses including offshore wind support, and revise project staging.
Wollongong CityMP08_0249-Mod-4
Withdrawn
Modification 2 mine plan reorientation & coal increase
Reorientation of mine plan, 18 month time extension and increase in coal production
Wollongong CityMP09_0013-Mod-2
Withdrawn
Modification 3 Eastern Gully Stormwater Channel
Design modifications to allow for the realignment of the open channel gravity drainage for full length of channel. The change to an open channel gravity drainage would mean that no pond outlet is required.
Wollongong CityMP11_0094-Mod-4
Withdrawn
Shoptop housing with infill affordable housing - Gipps and Flinders Streets, Wollongong
Demolition of existing structures and construction of a mixed-use development including shop top housing development comprising business and retail premises, and 906 apartments (244 affordable) above two basement levels
Wollongong CitySSD-73190458
Withdrawn
120-122 Smith Street, Wollongong - HDA
Shop-top housing development within three towers over podium.
Wollongong CitySSD-83956963
Withdrawn
Residential development with affordable housing - Byamee Street, Dapto
Staged development of multi-dwelling housing, residential flat buildings, open space, civil works, through-site link and subdivision.
Wollongong CitySSD-68374982
Determination
MOD 2 - Compliance Reporting Guideline
Update to Schedule 4, Condition 7 to reference latest compliance reporting guideline
Wollongong CitySSI-9471-Mod-2
Determination
MOD 3 - Addition to Schedule of Land
Change to the Schedule of Land
Wollongong CitySSI-9471-Mod-3
Make your yarns count.