Prepare EIS · SSD-134691490 · Major Project

Wagga South Battery Energy Storage System

Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of up to 300 MW / 1200 MWh, and ancillary infrastructure.

Project details

Application
SSD-134691490
Status
Prepare EIS
Type
State Significant Development
Council area
Wagga Wagga City
Property
Lot 1 Dp 1046649, Otherwise Known As 1504 Gregadoo East Road, Gregadoo Nsw.
Development type
Electricity supply

How do you want to help?

Run a campaign for this project

Set up the objections once. Supporters write and lodge their own letters in their own words.

  • Unlimited AI help to build and review your campaign
  • Invite your team to build it with you
  • A public page open to unlimited supporters

Free to set up. $500 when you publish.

Know someone who'd organise this?

Campaigns get far more submissions than individual letters. Send this to a resident group, environment group, or local councillor who could run one.

Just want to object yourself? Lodge on the Planning Portal

Where this project is up to

Environmental Impact Statement in preparation

The applicant is preparing its Environmental Impact Statement. Public submissions open when the project goes on exhibition, so this is the time to organise.

Last checked on the Planning Portal
4 Nov 2026

Other open projects in Wagga Wagga City

  • Prepare EIS

    Livingstone Solar Farm

    Development of a 600 MW solar farm with battery storage and associated infrastructure.

    Wagga Wagga CitySSD-80114208

  • Prepare EIS

    Gugaa Battery Energy Storage System

    Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 1000 MW / 4000 MWh, and ancillary infrastructure.

    Wagga Wagga CitySSD-103829960

  • Prepare EIS

    Calvary Riverina Hospital Extension

    Expansion of the Calvary Riverina Hospital comprising additional floor area across Levels 1 and 2 to expand theatres, clinical areas, and support spaces, including minor internal reconfiguration and refurbishment.

    Wagga Wagga CitySSD-112416742

  • Prepare EIS

    Riverina Storage Pipeline

    Construction and operation of a 112km gas storage pipeline near Wagga Wagga

    Wagga Wagga CitySSI-88716456

  • Prepare EIS

    Ashfords Road Data Centre, Gregadoo

    Construction and 24/7 operation of a data centre campus, comprising four buildings and a total power consumption of up to 1.4 gigawatts (GW). The proposal would also include an accompanying amendment to the Wagga Wagga Local Environmental Plan 2010.

    Wagga Wagga CitySSD-144289240

  • Prepare EIS

    Belhaven Battery Energy Storage System

    Construction and operation of a 400 MW / 3985 MWh Battery Energy Storage System including transmission connection and associated infrastructure

    Wagga Wagga CitySSD-57575973

All projects in Wagga Wagga City

How a campaign works

  1. 01

    Build your campaign

    Research the project, frame the objections, and add your own views.

  2. 02

    Share one link

    Get a public campaign page to share with your community.

  3. 03

    Lodge submissions, fast and easy

    Supporters pick the points that apply, add their own views, and lodge in their own words.

  4. 04

    See what's working

    Follow visits, signups, and lodged letters as they come in, and see which channel brings people in.

Make your yarns count.

Build a campaign, share with your community, and see the results.