Councils

Planning projects in Wagga Wagga City

58 State significant and State-assessed projects in Wagga Wagga City are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.

Open for submissions

Nothing in Wagga Wagga City is on exhibition right now. See everything open across NSW.

Coming up for exhibition

These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.

  • Prepare EIS

    Livingstone Solar Farm

    Development of a 600 MW solar farm with battery storage and associated infrastructure.

    Wagga Wagga CitySSD-80114208

  • Prepare EIS

    Gugaa Battery Energy Storage System

    Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 1000 MW / 4000 MWh, and ancillary infrastructure.

    Wagga Wagga CitySSD-103829960

  • Prepare EIS

    Calvary Riverina Hospital Extension

    Expansion of the Calvary Riverina Hospital comprising additional floor area across Levels 1 and 2 to expand theatres, clinical areas, and support spaces, including minor internal reconfiguration and refurbishment.

    Wagga Wagga CitySSD-112416742

  • Prepare EIS

    Wagga South Battery Energy Storage System

    Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of up to 300 MW / 1200 MWh, and ancillary infrastructure.

    Wagga Wagga CitySSD-134691490

  • Prepare EIS

    Riverina Storage Pipeline

    Construction and operation of a 112km gas storage pipeline near Wagga Wagga

    Wagga Wagga CitySSI-88716456

  • Prepare EIS

    Ashfords Road Data Centre, Gregadoo

    Construction and 24/7 operation of a data centre campus, comprising four buildings and a total power consumption of up to 1.4 gigawatts (GW). The proposal would also include an accompanying amendment to the Wagga Wagga Local Environmental Plan 2010.

    Wagga Wagga CitySSD-144289240

  • Prepare EIS

    Belhaven Battery Energy Storage System

    Construction and operation of a 400 MW / 3985 MWh Battery Energy Storage System including transmission connection and associated infrastructure

    Wagga Wagga CitySSD-57575973

Recently assessed or decided

  • Withdrawn

    Relocation of Retail Ready Meat Products Facility

    This project will see construction of a purpose built facility on the current Teys site including main production areas, storage facilities, plant and equipment rooms, truck parking and loading facilities.

    Wagga Wagga CitySSD-7977

  • Withdrawn

    Modification 3 - Addition of a Blending Tank and Storage Tank

    Addition of a blending tank and a storage tank to produce blended oil

    Wagga Wagga CityMP07_0146-Mod-3

  • Withdrawn

    Mod 1 - Ladysmith Road Quarry

    Greater Hume Shire+1 moreMP08_0139-Mod-1

  • Withdrawn

    Mod 1 - Administrative Description of Lots

    Administrative correction to the 'Schedule of Lands' in Appendix 1 of the conditions of consent.

    Wagga Wagga CitySSD-8825-Mod-1

  • Withdrawn

    MOD 5 - Addition of a Bioenergy Plant

    Construction of a bioenergy plant to use processed engineered fuel (PEF) to deliver steam to support the oil extraction process and to supply electricity via a back pressure turbine to the development.

    Wagga Wagga CityMP07_0146-Mod-5

  • Withdrawn

    Uranquinty Solar Farm

    The proposal involves constructing and operating a solar farm with around 200 MW capacity, battery storage and associated infrastructure.

    Wagga Wagga CitySSD-12154491

  • Withdrawn

    Mates Gully Solar Farm

    Development of a 160 MW Solar Farm with associated infrastructure including battery storage

    Wagga Wagga CitySSD-43606694

  • Determination

    Wagga Wagga Hospital Redevelopment - Stage 3

    Wagga Wagga CitySSD-9033

  • Determination

    Mod 1 - Various design & layout changes

    Wagga Wagga CityDA398-11-2002-Mod-1

  • Determination

    Uranquinty Gas-fired Power Station

    Wagga Wagga CityDA31-2-2004-i

  • Determination

    MOD 1 - Alternative Heavy Vehicle Route

    Additional alternative heavy vehicle transport route via Bomen Rail siding, Jersey Street, Dorset Drive and East Bomen Road; and Additional laydown area at 560 Byrnes Road, Bomen

    Wagga Wagga CitySSD-8835-Mod-1

  • Determination

    Teys (formerly Cargill) Beef Abattoir

    The Minister for Planning has given approval to Cargill Foods Australia Pty Ltd to upgrade and expand its existing abattoir at Bomen Road, Wagga Wagga.

    Wagga Wagga CityDA220-07-2002-i

  • Determination

    MOD 3 - Increase capacity

    The modification seeks to: • Increase the AC capacity from 43MWAC to 65MWAC; • Increase DC capacity from ~52MWDC to ~75MWDC; • Reduce the spacing between solar panel rows by 55cm from 5.50m to 4.95m

    Wagga Wagga CitySSD-8825-Mod-3

  • Determination

    Mod 2 - Transmission Line and Subdivision

    Administrative correction to the 'Schedule of Lands' in Appendix 1 of the conditions of consent, update overhead transmission line connection to underground transmission line and subdivision of lots for the substation.

    Wagga Wagga CitySSD-8825-Mod-2

  • Determination

    Integrated Oilseed Processing Plant

    Riverina Biodiesel

    Wagga Wagga CityMP07_0146

  • Determination

    Culcairn to Wagga Pipeline

    Development for the purpose of the construction and operation of a pipeline to convey natural gas known as the ‘Culcairn to Wagga Pipeline' authorised under Licence No.23 (granted on 1 October 1997 by the Governor of NSW and the Minister

    Wagga Wagga CitySSI-65512969

  • Determination

    Project EnergyConnect (NSW - Eastern Section)

    Development of a new transmission line connecting Buronga Substation and Wagga Wagga Substation, and construction of the new Dinawan Substation (170 km west of Wagga Wagga).

    Wentworth Shire+8 moreSSI-9172452

  • Determination

    MOD 1 - Extension of Offset Timing

    Seeking to extend timing for provision of biodiversity offset package

    Wentworth Shire+8 moreSSI-9172452-Mod-1

  • Determination

    Gregadoo Solar Farm

    Development of a 47 megawatt solar farm and associated infrastructure.

    Wagga Wagga CitySSD-8825

  • Determination

    Inland Rail - Albury to Illabo

    Enhancement works to structures and sections of track along 185 kilometres of existing operational standard gauge rail from the Victorian/New South Wales border to Illabo in regional NSW. The project forms part of the Inland Rail project.

    Albury City+4 moreSSI-10055

  • Determination

    Wagga Wagga Quarry

    Wagga Wagga CityMP07_0069

  • Determination

    Wagga Wagga Quarry MOD 1 - Truck Hours

    /

    Wagga Wagga CityMP07_0069-Mod-1

  • Determination

    HumeLink

    Development of new transmission lines between the existing substations at Wagga Wagga and Bannaby and the proposed Maragle substation, and a new substation at Gugaa.

    Wagga Wagga City+5 moreSSI-36656827

  • Determination

    Albury to Illabo MOD 1 - Kemp Street Bridge

    Revisions to the approved Kemp Street Bridge at Junee, to now provide a single, integrated road and pedestrian bridge.

    Junee Shire+4 moreSSI-10055-Mod-1

Search all 58 projects in Wagga Wagga City