Prepare EIS · SSD-69489708 · Major Project

Kayuga Solar Farm

Construction, operation and decommissioning of a 80-100MW solar farm, 50MW/100MWh battery energy storage system and associated infrastructure.

Project details

Application
SSD-69489708
Status
Prepare EIS
Type
State Significant Development
Council area
Muswellbrook Shire
Property
261 Dorset Road, Kayuga
Development type
Electricity Generation - Solar

How do you want to help?

Run a campaign for this project

Set up the objections once. Supporters write and lodge their own letters in their own words.

  • Unlimited AI help to build and review your campaign
  • Invite your team to build it with you
  • A public page open to unlimited supporters

Free to set up. $500 when you publish.

Know someone who'd organise this?

Campaigns get far more submissions than individual letters. Send this to a resident group, environment group, or local councillor who could run one.

Just want to object yourself? Lodge on the Planning Portal

Where this project is up to

Environmental Impact Statement in preparation

The applicant is preparing its Environmental Impact Statement. Public submissions open when the project goes on exhibition, so this is the time to organise.

Last checked on the Planning Portal
4 Nov 2026

Other open projects in Muswellbrook Shire

  • Closes 26 Nov · 20 days left

    New England REZ Transmission Project

    Development of new dual 500kV transmission lines between Muswellbrook and the New England REZ and new 500kV and 330kV lines to connect five new energy hubs within the New England REZ. This project is declared CSSI.

    Muswellbrook Shire+6 moreSSI-74175972

  • Prepare EIS

    Gelston Battery Energy Storage System

    Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 400 MW/1600 MWh, and ancillary infrastructure.

    Muswellbrook ShireSSD-104190458

  • Prepare EIS

    Muswellbrook Thermal Storage Facility

    The Project will include the installation and operation of up to 30 megawatt thermal (MWt) CST facility with the capacity of 4.99 megawatt electrical (MWe) alternating current (AC), onsite grid connection and ancillary infrastructure

    Muswellbrook ShireSSD-88560713

  • Prepare EIS

    Edderton Solar Farm

    Construction and operation of a 350 MW Solar Farm and associated BESS

    Muswellbrook Shire+1 moreSSD-69965958

  • Prepare EIS

    Hunter Vanadium Flow Battery

    Construction, operation and decommissioning of a flow battery with a capacity of 108MW / 864MWh and ancillary infrastructure.

    Muswellbrook ShireSSD-131053991

  • Prepare EIS

    Muswellbrook Pumped Hydro Energy Storage

    Muswellbrook Pumped Hydro Energy Storage Project, which includes the development of a 500 megawatt pumped hydro power station, upper and lower reservoirs, grid connection and ancillary infrastructure. This project has been declared CSSI.

    Muswellbrook ShireSSI-76014961

All projects in Muswellbrook Shire

How a campaign works

  1. 01

    Build your campaign

    Research the project, frame the objections, and add your own views.

  2. 02

    Share one link

    Get a public campaign page to share with your community.

  3. 03

    Lodge submissions, fast and easy

    Supporters pick the points that apply, add their own views, and lodge in their own words.

  4. 04

    See what's working

    Follow visits, signups, and lodged letters as they come in, and see which channel brings people in.

Make your yarns count.

Build a campaign, share with your community, and see the results.