Councils

Planning projects in Muswellbrook Shire

97 State significant and State-assessed projects in Muswellbrook Shire are listed on the NSW Planning Portal. 1 is on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.

Campaigns running now

  • New England REZ Transmission Project

    New England REZ Transmission Project · closes Thursday 26 November at 11:59 pm

    Write your letter

Open for submissions

  • Closes 26 Nov · 20 days left

    New England REZ Transmission Project

    Development of new dual 500kV transmission lines between Muswellbrook and the New England REZ and new 500kV and 330kV lines to connect five new energy hubs within the New England REZ. This project is declared CSSI.

    Muswellbrook Shire+6 moreSSI-74175972

Coming up for exhibition

These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.

  • Prepare EIS

    Gelston Battery Energy Storage System

    Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 400 MW/1600 MWh, and ancillary infrastructure.

    Muswellbrook ShireSSD-104190458

  • Prepare EIS

    Kayuga Solar Farm

    Construction, operation and decommissioning of a 80-100MW solar farm, 50MW/100MWh battery energy storage system and associated infrastructure.

    Muswellbrook ShireSSD-69489708

  • Prepare EIS

    Muswellbrook Thermal Storage Facility

    The Project will include the installation and operation of up to 30 megawatt thermal (MWt) CST facility with the capacity of 4.99 megawatt electrical (MWe) alternating current (AC), onsite grid connection and ancillary infrastructure

    Muswellbrook ShireSSD-88560713

  • Prepare EIS

    Edderton Solar Farm

    Construction and operation of a 350 MW Solar Farm and associated BESS

    Muswellbrook Shire+1 moreSSD-69965958

  • Prepare EIS

    Hunter Vanadium Flow Battery

    Construction, operation and decommissioning of a flow battery with a capacity of 108MW / 864MWh and ancillary infrastructure.

    Muswellbrook ShireSSD-131053991

  • Prepare EIS

    Muswellbrook Pumped Hydro Energy Storage

    Muswellbrook Pumped Hydro Energy Storage Project, which includes the development of a 500 megawatt pumped hydro power station, upper and lower reservoirs, grid connection and ancillary infrastructure. This project has been declared CSSI.

    Muswellbrook ShireSSI-76014961

  • Prepare EIS

    Bells Mountain Battery Energy Storage System

    Construction of a 750 MW / 1,500 MW-hour battery and associated infrastructure

    Muswellbrook ShireSSD-83968208

Recently assessed or decided

Search all 97 projects in Muswellbrook Shire

Make your yarns count.

Build a campaign, share with your community, and see the results.