Planning projects in Bogan Shire
17 State significant and State-assessed projects in Bogan Shire are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Bogan Shire is on exhibition right now. See everything open across NSW.
Recently assessed or decided
Withdrawn
Western Slopes Pipeline
Construction and operation of a high pressure gas pipeline connecting the Narrabri Gas Project to the Moomba-Sydney gas pipeline.
Bogan Shire+6 moreSSI-8272
Withdrawn
Constellation Project
Development of an open cut and underground mining operation.
Bogan ShireSVC-71219248
Withdrawn
Constellation Project
Development of an open cut and underground mining operation.
Bogan ShireGA-71231706
Determination
Tritton Copper Mine Mod 7 - Vent Rises
Construction of two additional vent rises to support underground operations.
Bogan ShireDA41/98-Mod-7
Determination
MOD 8 - Tritton Budgerygar Underground Extension
Extension of underground mining
Bogan ShireDA41/98-Mod-8
Determination
Yarren Hut Solar Farm
Development of a 28 MW solar farm and associated infrastructure
Bogan ShireSSD-10415
Determination
MOD 9 - Optimisation and Integration
Modification to optimise aspects of the Tritton Mine for existing mining activities and to further integrate the mining operations at the Tritton Mine with the other operations in the region.
Bogan ShireDA41/98-Mod-9
Determination
MOD 1 - Minor Infrastructure Relocation
Minor modification to infrastructure locations within the Mine Site to support efficient site establishment and construction activities
Bogan ShireSSD-41579871-Mod-1
Determination
Bogan River Solar MOD 1 - Bogan River Solar
3 year extension to the approval lapse date, deletion of conditions regarding operational noise testing, option of installing tracking/fixed panels, refinement of land allotments, update of references and increased panel height.
Bogan ShireMP10_0123-Mod-1
Determination
Nyngan Solar MOD 1 - Transmission Line Easement
Administrative change to the timing of the easement being created for the transmission line.
Bogan ShireSSD-5355-MOD-1
Determination
Constellation Project
Development of an open cut and underground mining operation.
Bogan ShireSSD-41579871
Prepare Mod Report
Modification 3 - Temporary Ore Transportation
Temporary use of an alternative ore haulage route and increased haulage movements for transport of ore from the Constellation Copper Mine to the Tritton Copper Mine while the approved Mitchell Highway intersection is completed.
Bogan ShireSSD-41579871-Mod-3
Prepare Mod Report
MOD 2 - Optimisation and Expansion
Modification to increase production, expand the open cut pit and waste rock emplacement, enable 24/7 haulage, and update associated mine infrastructure
Bogan ShireSSD-41579871-Mod-2