Withdrawn · SSI-8272 · Major Project

Western Slopes Pipeline

Construction and operation of a high pressure gas pipeline connecting the Narrabri Gas Project to the Moomba-Sydney gas pipeline.

Project details

Application
SSI-8272
Status
Withdrawn
Type
State Significant Infrastructure
Property
450Km Gas Transmission Pipeline Between The Narrabri Gas Project And The Moomba Sydney Pipeline, Central West Region Of Nsw
Development type
Gas supply

How do you want to help?

Run a campaign for this project

Set up the objections once. Supporters write and lodge their own letters in their own words.

  • Unlimited AI help to build and review your campaign
  • Invite your team to build it with you
  • A public page open to unlimited supporters

Free to set up. $500 when you publish.

Know someone who'd organise this?

Campaigns get far more submissions than individual letters. Send this to a resident group, environment group, or local councillor who could run one.

Just want to object yourself? Lodge on the Planning Portal

Where this project is up to

Withdrawn

This application is no longer going ahead in its current form.

Last checked on the Planning Portal
4 Nov 2026

Other open projects in these council areas

  • Prepare EIS

    Tallebung Project

    An open cut mining operation producing the critical mineral, tin; with silver and tungsten as co-products. The Project will consist of the mine, a processing facility, offices, workshops, power and water infrastructure and a camp.

    Cobar ShireSSD-120153740

  • Prepare EIS

    Narrabri West Solar Farm

    Construction, operation, and decommissioning of a Solar Farm with a capacity of approximately 120 MW, a battery energy storage system (BESS) with a capacity of approximately 120 MW / 240 MWh, and ancillary infrastructure.

    Narrabri ShireSSD-122316741

  • Prepare EIS

    Narrabri Solar Farm

    A 140MW solar farm with a battery energy storage system 100MW/800Mwh

    Narrabri ShireSSD-71855714

  • Prepare EIS

    Cobar Wind Farm

    Construction and operation of a 216MW wind farm, including 30 WTGs up to 280m in height and a 50MW/100MWh BESS.

    Cobar ShireSSD-68084467

All projects in Bogan ShireAll projects in Cobar ShireAll projects in Coonamble ShireAll projects in Lachlan ShireAll projects in Narrabri ShireAll projects in Walgett ShireAll projects in Warren Shire

How a campaign works

  1. 01

    Build your campaign

    Research the project, frame the objections, and add your own views.

  2. 02

    Share one link

    Get a public campaign page to share with your community.

  3. 03

    Lodge submissions, fast and easy

    Supporters pick the points that apply, add their own views, and lodge in their own words.

  4. 04

    See what's working

    Follow visits, signups, and lodged letters as they come in, and see which channel brings people in.

Make your yarns count.

Build a campaign, share with your community, and see the results.