Planning projects in Cessnock City
84 State significant and State-assessed projects in Cessnock City are listed on the NSW Planning Portal. 1 is on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.
Open for submissions
Closes 11 Nov · 5 days left
Kurri Kurri Data Centre
Construction, fit-out and operation of a data centre with a total power consumption of 550.5 megawatts (MW), located at the former Hydro Aluminium Kurri Kurri plant.
Cessnock CitySSD-128819490
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
SEARs
Resource Recovery Facility Met Recycling - HEZ
Resource Recovery Facility with a processing capacity of 550,000 tonnes per annum
Cessnock CitySSD-33648467
Prepare EIS
Huntlee New Town Stage 2
A Concept Master plan for Stage 2 site including the residue of Town Centre, Villages 2, 3 and 4 and a large lot residential area located to the south of the site on Old North Road. Detailed subdivision application for Village 2 residential area
Cessnock City+1 moreSSD-54836993
Prepare EIS
Kurri Kurri Battery Energy Storage System
Development of a 200 MW / 800 MWh battery energy storage facility with associated infrastructure.
Cessnock CitySSD-113069490
Prepare EIS
Weston Aluminium Autoclave Facility
Construction and operation of an autoclave facility within the existing Weston Aluminium site.
Cessnock CitySSD-79012238
Recently assessed or decided
Withdrawn
Mod to Huntlee PA (MP 10_0137 MOD 12)- 4 additional lots
Modification to incorporate 4 additional residential lots.
Cessnock City+1 moreMP10_0137-Mod-12
Withdrawn
Modification 19 Huntlee Mod 19
Subdivision of Substage 14 and 15 to provide 169 new residential lots, subdivision of superlots 222 and 223 in Substage 16 to provide an additional 33 residential lots. Overall increase of 202 lots. New internal roads are also proposed.
Cessnock City+1 moreMP10_0137-Mod-19
Withdrawn
MOD 18 - Huntlee Town Centre Subdivision
Additional 161 residential allotments
Cessnock City+1 moreMP10_0137-Mod-18
Withdrawn
DALE Young Parents' School
The Young Parents School is an education facility which seeks to to equip young parents for employment and to prepare their young children for school. The centre also will provide student support services and on site child care for students.
Cessnock CitySSD-8392024
Withdrawn
Modification 13 Waste Shredding
A proposal for the receipt, storage, shredding of up to 20,000 tonnes per annum of end-consumer products (General Solid Waste)
Cessnock CityLEC10397-1995-Mod-13
Withdrawn
Mod to Huntlee PA (MP 10_0137 MOD 14) - Large Lot Changes
Lot and road layout amendments of Large Lot Residential Stage 5, resulting in deletion of 10 lots
Cessnock City+1 moreMP10_0137-Mod-14
Withdrawn
Central Waste Plant Resource Recovery Facility Kurri Kurri
Construction and expansion of an existing resource recovery facility from 90,000 to 300,000 tpa of general solid waste (non-putrescible) , comprising of construction & demolition, commercial & industrial and municipal solid wastes for recycling.
Cessnock CitySSD-10435
Withdrawn
MOD 3 - Diesel Fuel Operation in Year 1
To allow use of diesel fuel for the purpose of generating electrical power from up to 175 cumulative hours per calendar year to up to 1,100 cumulative hours during the first year of operation.
Cessnock CitySSI-12590060-Mod-3
Determination
Hydro Kurri Kurri Aluminium Smelter Remediation
Remediation of the former Hydro Aluminium Smelter, Kurri Kurri including remediation of the site, design, construction and operation of a containment cell for encapsulating contaminated material.
Cessnock CitySSD-6666
Determination
Mod to Hunlee PA (MP 10_0137 MOD 15)- Town Centre boundary changes
Boundary changes to lots in Town Centre
Cessnock City+1 moreMP10_0137-Mod-15
Determination
MOD 4 Bulk Sample Trial Delivery
The modification is seeking approval for the extraction of 840 tonnes of coal fines from the Aberdare East site and transportation via road of that material to the Vales Point Power Station over a two day period for testing.
Cessnock CityMP06_0236-Mod-4
Determination
Huntlee MOD 17- changes to intersection timing
Amendments to Condition E7 to change timing for intersection upgrades.
Cessnock City+1 moreMP10_0137-Mod-17
Determination
Huntlee MOD 16- 41 additional lots
Redesign of stages 8, 9 and 11 including additional 41 lots and changes to road layout.
Cessnock City+1 moreMP10_0137-Mod-16
Determination
Enviroking Liquid Waste Facility
Expansion of an existing liquid waste treatment facility to treat up to 20,000 tonnes per annum of liquid food wastes, grease trap arrestor wastes and industrial oily waters.
Cessnock CityMP07_0048
Determination
MOD 1 - Laydown areas and construction traffic
Temporary extension of the project site boundary for construction activities and increased construction vehicle movements
Cessnock CitySSI-12590060-Mod-1
Determination
Huntlee Mod 20 - Subdivision of Town Centre and Substages 13-16
Lot layout amendments and subdivision of Town Centre Stages 1-5 and Substages 13-16 resulting in 300+ additional allotments. Includes road roads, amendments to conditions, the relocation of an urban square and a small increase to public open space.
Cessnock City+1 moreMP10_0137-Mod-20
Determination
Huntlee New Town Stage 1 - Mod 21 – Expansion of the Stage 1 area and various amendments
Extension of site area to create Town Centre Stage 6 (TC6). Subdivision works for TC6 and subdivision of existing Town Centre 1 and 2 for 7 additional commercial lots. Amendment to delivery of road infrastructure.
Cessnock City+1 moreMP10_0137-Mod-21