Councils

Planning projects in Cessnock City

84 State significant and State-assessed projects in Cessnock City are listed on the NSW Planning Portal. 1 is on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.

Open for submissions

  • Closes 11 Nov · 5 days left

    Kurri Kurri Data Centre

    Construction, fit-out and operation of a data centre with a total power consumption of 550.5 megawatts (MW), located at the former Hydro Aluminium Kurri Kurri plant.

    Cessnock CitySSD-128819490

Coming up for exhibition

These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.

  • SEARs

    Resource Recovery Facility Met Recycling - HEZ

    Resource Recovery Facility with a processing capacity of 550,000 tonnes per annum

    Cessnock CitySSD-33648467

  • Prepare EIS

    Huntlee New Town Stage 2

    A Concept Master plan for Stage 2 site including the residue of Town Centre, Villages 2, 3 and 4 and a large lot residential area located to the south of the site on Old North Road. Detailed subdivision application for Village 2 residential area

    Cessnock City+1 moreSSD-54836993

  • Prepare EIS

    Kurri Kurri Battery Energy Storage System

    Development of a 200 MW / 800 MWh battery energy storage facility with associated infrastructure.

    Cessnock CitySSD-113069490

  • Prepare EIS

    Weston Aluminium Autoclave Facility

    Construction and operation of an autoclave facility within the existing Weston Aluminium site.

    Cessnock CitySSD-79012238

Recently assessed or decided

Search all 84 projects in Cessnock City

Make your yarns count.

Build a campaign, share with your community, and see the results.