Councils

Planning projects in Cobar Shire

24 State significant and State-assessed projects in Cobar Shire are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.

Open for submissions

Nothing in Cobar Shire is on exhibition right now. See everything open across NSW.

Coming up for exhibition

These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.

  • Prepare EIS

    Tallebung Project

    An open cut mining operation producing the critical mineral, tin; with silver and tungsten as co-products. The Project will consist of the mine, a processing facility, offices, workshops, power and water infrastructure and a camp.

    Cobar ShireSSD-120153740

  • Prepare EIS

    Cobar Wind Farm

    Construction and operation of a 216MW wind farm, including 30 WTGs up to 280m in height and a 50MW/100MWh BESS.

    Cobar ShireSSD-68084467

Recently assessed or decided

  • Withdrawn

    Federation Project

    The project involves the development of an underground lead, zinc, copper and gold mine

    Cobar ShireSVC-34035186

  • Withdrawn

    Federation Project

    The project involves the development of an underground lead, zinc, copper and gold mine

    Cobar ShireSVC-36151999

  • Withdrawn

    Federation Project

    The project involves the development of an underground lead, zinc, copper and gold mine

    Cobar ShireSVC-33279956

  • Withdrawn

    Western Slopes Pipeline

    Construction and operation of a high pressure gas pipeline connecting the Narrabri Gas Project to the Moomba-Sydney gas pipeline.

    Bogan Shire+6 moreSSI-8272

  • Determination

    MOD 6 - Ore and Waste Transportation

    Transportation of ore and waste rock between Hera and Peak Mines

    Cobar ShireMP10_0191-Mod-6

  • Determination

    MOD 1 - Compressor Station Installation

    Installation of two compressor stations

    Unincorporated Far West+10 moreSSI-15548591-Mod-1

  • Determination

    Moomba to Wilton Pipeline - Mod 3

    Installation and use of groundwater bore and site layout amendments at the MW433 compressor station site

    Unincorporated Far West+10 moreSSI-15548591-Mod-3

  • Determination

    Mod 4 - Temporary Accommodation Camps

    Construction and operation of six temporary accommodation camps to facilitate essential maintenance of the Moomba to Wilton Pipeline.

    Unincorporated Far West+10 moreSSI-15548591-Mod-4

  • Determination

    MOD 2 - Compressor Station Installation

    Installation of three compressor stations - Stage 3 of the East Coast Grid Expansion

    Unincorporated Far West+10 moreSSI-15548591-Mod-2

  • Determination

    MOD 5 - Biodiversity Credits Corrrection

    Biodiversity Credit Calculation Correction

    Unincorporated Far West+10 moreSSI-15548591-Mod-5

  • Determination

    MOD 7 - Staging of Biodiversity Offsets

    Staging of biodiversity credit retirement

    Unincorporated Far West+10 moreSSI-15548591-Mod-7

  • Determination

    MOD 6 - Temporary Accommodation Camps

    Construction and operation of two temporary worker's accommodation camps to facilitate planned maintenance of the Moomba to Wilton Pipeline

    Unincorporated Far West+10 moreSSI-15548591-Mod-6

  • Determination

    MOD 1 - Biodiversity Offset Staging

    Modification to shift the location of a vent rise and change the staging allocation of biodiversity offset credits

    Cobar ShireSSD-24319456-Mod-1

  • Determination

    Federation Project

    The project involves the development of an underground lead, zinc, copper and gold mine

    Cobar ShireSSD-24319456

  • Determination

    MOD 2 - Ore haulage and processing

    Modification to increase ore haulage to Peak Mine and modify approach to ore processing and tailings handling

    Cobar ShireSSD-24319456-Mod-2

  • Determination

    Moomba to Wilton Pipeline

    Moomba to Wilton Pipeline

    Unincorporated Far West+10 moreSSI-15548591

  • Determination

    MOD 8 - Compressor Station Installation MW733

    Construction and operation of an additional compressor station on the MWP at MW733.

    Unincorporated Far West+10 moreSSI-15548591-Mod-8

  • Determination

    Hera Gold MOD 4 - MOD 4 - Northern Extension

    Extension of Underground mine to the north

    Cobar ShireMP10_0191-Mod-4

  • Determination

    Hera Gold MOD 3 - Increased Production

    Increase in production and processing rate

    Cobar ShireMP10_0191-Mod-3

  • Determination

    Hera Gold MOD 2 - Haulage Route

    Change to haulage route

    Cobar ShireMP10_0191-Mod-2

  • Determination

    New Cobar Complex Project

    Amalgamation of underground mining at New Cobar, Great Cobar, Gladstone, Chesney and Jubilee deposits to create the New Cobar Complex Project.

    Cobar ShireSSD-10419

  • Prepare Mod Report

    MOD 1 - Surface Infrastructure

    Modification to surface infrastructure and minor operational changes

    Cobar ShireSSD-10419-Mod-1