Planning projects in Dubbo Regional
65 State significant and State-assessed projects in Dubbo Regional are listed on the NSW Planning Portal. 1 is on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.
Open for submissions
Closes 13 Nov · 7 days left
MOD 1 - Temporary Worker Accommodation
Addition of Temporary Worker Accommodation Facility for up to 600 workers, adjacent to the approved Project Site.
Dubbo Regional+1 moreSSD-41134610-Mod-1
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Burroway Wind Farm
Construction, operation and decommissioning of a wind farm with up to 75 wind turbines, battery storage and associated infrastructure
Narromine Shire+1 moreSSD-103903477
Prepare EIS
Wellington Compressed Air Energy Storage System
Development of a 500 MW / 8000 MWh advanced compressed air energy storage facility with associated infrastructure
Dubbo RegionalSSD-124710241
Prepare EIS
Mullion Creek Wind Farm
Development of a wind farm with up to 33 wind turbines and associated infrastructure.
Cabonne Shire+1 moreSSD-100739958
Prepare EIS
Boree Solar Farm
Development of a 250 megawatt solar farm with 200 megawatt / 800 megawatt hour battery energy storage system and associated infrastructure.
Dubbo RegionalSSD-90792956
Prepare EIS
Hampton Park Solar Farm
Development of a 180 megawatt solar farm with an 800 megawatt hour battery energy storage system and associated infrastructure.
Dubbo RegionalSSD-97547209
Prepare EIS
Yarrabin (Phoenix) Pumped Hydro
Development of a 810 MW / 9,720 MWh pumped hydro energy storage and generation project, grid connection and ancillary infrastructure.
Dubbo Regional+1 moreSSD-59906734
Prepare EIS
Aquila Wind Farm
Construction and operation of a wind farm with up to 48 wind turbines, battery storage and associated infrastructure.
Dubbo RegionalSSD-67667971
Prepare EIS
Kerrs Creek Wind Farm
Construction and operation of a wind farm with up to 63 wind turbines and associated infrastructure.
Dubbo RegionalSSD-62199230
Recently assessed or decided
Withdrawn
Wellington Town BESS
Construction of a battery energy storage system (180 MW / 720 MWh) and transmission line connecting to Wellington Town substation plus ancillary works.
Dubbo RegionalSSD-56623466
Withdrawn
Dapper Solar Farm
Development of a 300 MW solar farm and associated infrastructure
Warrumbungle Shire+1 moreSSD-52217961
Determination
MOD 1 - Turbine Removal and Access Track Amendments
- Removal of four turbines and four waterway crossings - Reduction in access track length and clearing required
Dubbo RegionalSSD-6687-Mod-1
Determination
MOD 1 - Battery Energy Storage System
Addition of a Battery Energy Storage System up to 125MW
Dubbo RegionalSSD-8777-Mod-1
Determination
Mod 1 - Project Layout and Processing Changes
Changes to mine layout, infrastructure and reagent transportation, and increase to mine life.
Dubbo RegionalSSD-5251-Mod-1
Determination
MOD 2 - Increase Capacity
Increase to the capacity of the solar farm from 125 MW to 230 MW, including: - changes to panel configuration; and- increase to the capacity of battery storage from 125 MW/375 MWh to 230 MW/375 MWh.
Dubbo RegionalSSD-8777-Mod-2
Determination
MOD 2 - Update to Subdivision Plans
To correct errors within the subdivision plans.
Dubbo RegionalSSD-6687-Mod-2
Determination
MOD 2 - Revised Project Layout
Revised development footprint following additional geotechnical studies and detailed design.
Dubbo RegionalSSD-8573-Mod-2
Determination
Suntop Solar Farm
Development of a 170 MW solar farm and associated infrastructure. Project website: https://suntopsolarfarm.com.au/
Dubbo RegionalSSD-8696
Determination
MOD 1 - Minor Administrative Changes
Minor administrative changes primarily relating to clarifying timing of post approval documentation.
Warrumbungle Shire+3 moreSSI-48323210-Mod-1
Determination
MOD 1 - Minor Administrative Changes
Minor administrative changes primarily relating to clarifying timing of post approval documentation.
Warrumbungle Shire+3 moreSSI-48323210-Mod-1
Determination
Central West Pipeline (Marsden to Dubbo)
Development for the purpose of the construction and operation of a pipeline to convey natural gas known as the ‘PL25 - Central West Pipeline (Marsden to Dubbo)' authorised under Licence No.25 (granted on 1 October 1997)
Dubbo Regional+3 moreSSI-71022719
Determination
Forest Glen Solar Farm
Development of a 90 MW solar farm and associated infrastructure, including battery storage facility.
Dubbo RegionalSSD-9451258
Determination
Dubbo Firming Power Station
60 MW gas fired power station, hydrogen generation plant and 2.5 km and 500 m gas pipelines. https://www.ipcn.nsw.gov.au/cases/2024/03/dubbo-firming-power-station
Dubbo RegionalSSD-28088034
Determination
Modification 1 Orana BESS Modification
Extension of the development footprint to provide an additional laydown area for construction and permanent fill batters around the southern extent of the BESS.
Dubbo RegionalSSD-45242780-Mod-1
Determination
Forest Glen Solar Farm - Modification 2
Seeks a minor increase in the approved development footprint to enable the use and sealing of an internal private access road.
Dubbo RegionalSSD-9451258-Mod-2
Determination
Forest Glen Solar Farm Modification 3
Increase in the BESS capacity from 25MW one hour capacity to a 90MW two-hour capacity.
Dubbo RegionalSSD-9451258-Mod-3
Determination
Orana Battery Energy Storage System - Modification 2
Amendment to approved development footprint and biodiversity offset requirements.
Dubbo RegionalSSD-45242780-Mod-2
Determination
MOD 3 - Minor additional road upgrades
Additional road upgrades along the transport route
Dubbo RegionalSSD-6687-Mod-3
Determination
MOD 2 - Mudgee Maintenance Facility
Construction and operation of maintenance facility at 1 Marsh Ave, Caerleon
Mid-Western Regional+3 moreSSI-48323210-Mod-2
Determination
MOD 4 - Minor change to clearing limits
Modification to increase clearing limits for Leucochrysum albicans
Warrumbungle Shire+3 moreSSI-48323210-MOD-4