Councils

Planning projects in Dubbo Regional

65 State significant and State-assessed projects in Dubbo Regional are listed on the NSW Planning Portal. 1 is on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.

Open for submissions

  • Closes 13 Nov · 7 days left

    MOD 1 - Temporary Worker Accommodation

    Addition of Temporary Worker Accommodation Facility for up to 600 workers, adjacent to the approved Project Site.

    Dubbo Regional+1 moreSSD-41134610-Mod-1

Coming up for exhibition

These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.

  • Prepare EIS

    Burroway Wind Farm

    Construction, operation and decommissioning of a wind farm with up to 75 wind turbines, battery storage and associated infrastructure

    Narromine Shire+1 moreSSD-103903477

  • Prepare EIS

    Wellington Compressed Air Energy Storage System

    Development of a 500 MW / 8000 MWh advanced compressed air energy storage facility with associated infrastructure

    Dubbo RegionalSSD-124710241

  • Prepare EIS

    Mullion Creek Wind Farm

    Development of a wind farm with up to 33 wind turbines and associated infrastructure.

    Cabonne Shire+1 moreSSD-100739958

  • Prepare EIS

    Boree Solar Farm

    Development of a 250 megawatt solar farm with 200 megawatt / 800 megawatt hour battery energy storage system and associated infrastructure.

    Dubbo RegionalSSD-90792956

  • Prepare EIS

    Hampton Park Solar Farm

    Development of a 180 megawatt solar farm with an 800 megawatt hour battery energy storage system and associated infrastructure.

    Dubbo RegionalSSD-97547209

  • Prepare EIS

    Yarrabin (Phoenix) Pumped Hydro

    Development of a 810 MW / 9,720 MWh pumped hydro energy storage and generation project, grid connection and ancillary infrastructure.

    Dubbo Regional+1 moreSSD-59906734

  • Prepare EIS

    Aquila Wind Farm

    Construction and operation of a wind farm with up to 48 wind turbines, battery storage and associated infrastructure.

    Dubbo RegionalSSD-67667971

  • Prepare EIS

    Kerrs Creek Wind Farm

    Construction and operation of a wind farm with up to 63 wind turbines and associated infrastructure.

    Dubbo RegionalSSD-62199230

Recently assessed or decided

  • Withdrawn

    Mod 2 - Extend Lapse Date

    Dubbo RegionalMP06_0315-Mod-2

  • Withdrawn

    Wellington Town BESS

    Construction of a battery energy storage system (180 MW / 720 MWh) and transmission line connecting to Wellington Town substation plus ancillary works.

    Dubbo RegionalSSD-56623466

  • Withdrawn

    Dapper Solar Farm

    Development of a 300 MW solar farm and associated infrastructure

    Warrumbungle Shire+1 moreSSD-52217961

  • Determination

    MOD 1 - Turbine Removal and Access Track Amendments

    - Removal of four turbines and four waterway crossings - Reduction in access track length and clearing required

    Dubbo RegionalSSD-6687-Mod-1

  • Determination

    MOD 1 - Battery Energy Storage System

    Addition of a Battery Energy Storage System up to 125MW

    Dubbo RegionalSSD-8777-Mod-1

  • Determination

    Mod 1 - Project Layout and Processing Changes

    Changes to mine layout, infrastructure and reagent transportation, and increase to mine life.

    Dubbo RegionalSSD-5251-Mod-1

  • Determination

    Cobbora Coal Mine

    Mid-Western Regional+2 moreMP10_0001

  • Determination

    MOD 2 - Increase Capacity

    Increase to the capacity of the solar farm from 125 MW to 230 MW, including: - changes to panel configuration; and- increase to the capacity of battery storage from 125 MW/375 MWh to 230 MW/375 MWh.

    Dubbo RegionalSSD-8777-Mod-2

  • Determination

    MOD 2 - Update to Subdivision Plans

    To correct errors within the subdivision plans.

    Dubbo RegionalSSD-6687-Mod-2

  • Determination

    MOD 2 - Revised Project Layout

    Revised development footprint following additional geotechnical studies and detailed design.

    Dubbo RegionalSSD-8573-Mod-2

  • Determination

    Suntop Solar Farm

    Development of a 170 MW solar farm and associated infrastructure. Project website: https://suntopsolarfarm.com.au/

    Dubbo RegionalSSD-8696

  • Determination

    MOD 1 - Minor Administrative Changes

    Minor administrative changes primarily relating to clarifying timing of post approval documentation.

    Warrumbungle Shire+3 moreSSI-48323210-Mod-1

  • Determination

    MOD 1 - Minor Administrative Changes

    Minor administrative changes primarily relating to clarifying timing of post approval documentation.

    Warrumbungle Shire+3 moreSSI-48323210-Mod-1

  • Determination

    Central West Pipeline (Marsden to Dubbo)

    Development for the purpose of the construction and operation of a pipeline to convey natural gas known as the ‘PL25 - Central West Pipeline (Marsden to Dubbo)' authorised under Licence No.25 (granted on 1 October 1997)

    Dubbo Regional+3 moreSSI-71022719

  • Determination

    Forest Glen Solar Farm

    Development of a 90 MW solar farm and associated infrastructure, including battery storage facility.

    Dubbo RegionalSSD-9451258

  • Determination

    Dubbo Firming Power Station

    60 MW gas fired power station, hydrogen generation plant and 2.5 km and 500 m gas pipelines. https://www.ipcn.nsw.gov.au/cases/2024/03/dubbo-firming-power-station

    Dubbo RegionalSSD-28088034

  • Determination

    Modification 1 Orana BESS Modification

    Extension of the development footprint to provide an additional laydown area for construction and permanent fill batters around the southern extent of the BESS.

    Dubbo RegionalSSD-45242780-Mod-1

  • Determination

    Forest Glen Solar Farm - Modification 2

    Seeks a minor increase in the approved development footprint to enable the use and sealing of an internal private access road.

    Dubbo RegionalSSD-9451258-Mod-2

  • Determination

    Forest Glen Solar Farm Modification 3

    Increase in the BESS capacity from 25MW one hour capacity to a 90MW two-hour capacity.

    Dubbo RegionalSSD-9451258-Mod-3

  • Determination

    Orana Battery Energy Storage System - Modification 2

    Amendment to approved development footprint and biodiversity offset requirements.

    Dubbo RegionalSSD-45242780-Mod-2

  • Determination

    MOD 3 - Minor additional road upgrades

    Additional road upgrades along the transport route

    Dubbo RegionalSSD-6687-Mod-3

  • Determination

    MOD 2 - Mudgee Maintenance Facility

    Construction and operation of maintenance facility at 1 Marsh Ave, Caerleon

    Mid-Western Regional+3 moreSSI-48323210-Mod-2

  • Determination

    MOD 4 - Minor change to clearing limits

    Modification to increase clearing limits for Leucochrysum albicans

    Warrumbungle Shire+3 moreSSI-48323210-MOD-4

Search all 65 projects in Dubbo Regional

Make your yarns count.

Build a campaign, share with your community, and see the results.