Planning projects in Edward River

23 State significant and State-assessed projects in Edward River are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.

Open for submissions

Nothing in Edward River is on exhibition right now. See everything open across NSW.

Coming up for exhibition

These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.

  • Prepare EIS

    Abercrombie Wind Farm

    The project would involve the construction, operation and maintenance and decommissioning of a new wind farm with up to 348 wind turbine generators, associated infrastructure, and battery energy storage systems.

    Hay Shire+1 moreSSD-77340978

  • Prepare EIS

    Wanganella Wind Farm

    Construction, operation and decommissioning of a wind farm with an estimated capacity of 840 MW, up to 105 turbines and a maximum height of 270m (to blade tip), a 600 MW / 2400 MWh BESS, and temporary worker accommodation

    Edward RiverSSD-78102208

  • Prepare EIS

    Conargo Wind Farm

    Construction and operation of a 168 MW wind farm, including 28 WTGs up to 270 m in height.

    Edward RiverSSD-70611708

  • Prepare EIS

    Booroorban (Saltbush) Wind Farm

    Construction and operation of a 400 MW wind farm,including 70 wind turbines up to 280m in height, and a 600 MW / 1200 MWh BESS.

    Edward RiverSSD-70636459

  • Prepare EIS

    West Nyangay Solar Farm

    Development of a 800MW solar farm with energy storage and associated infrastructure

    Edward RiverSSD-74990235

Recently assessed or decided

  • Withdrawn

    Deniliquin Abattoir

    Edward RiverSSD-6393

  • Determination

    Project EnergyConnect (NSW - Eastern Section)

    Development of a new transmission line connecting Buronga Substation and Wagga Wagga Substation, and construction of the new Dinawan Substation (170 km west of Wagga Wagga).

    Wentworth Shire+8 moreSSI-9172452

  • Determination

    MOD 1 - Extension of Offset Timing

    Seeking to extend timing for provision of biodiversity offset package

    Wentworth Shire+8 moreSSI-9172452-Mod-1

  • Determination

    Pottinger Wind Farm

    Construction and operation of a wind farm with up to 247 wind turbines, battery storage and associated infrastructure.

    Edward River+1 moreSSD-59235464

  • Determination

    Billabong Creek Environmental Water Regulators

    Replacing two existing weirs along Billabong Creek with two new environmental water regulators. The new regulators would allow for flow regulation and fish passage.

    Edward RiverSSI-50831979

  • Determination

    Yanco Delta Wind Farm

    Development of a wind farm with up to 208 wind turbines, energy storage and associated infrastructure

    Edward River+1 moreSSD-41743746

  • Determination

    Deniliquin Battery Energy Storage System

    Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 120MW/480MWh and ancillary infrastructure.

    Edward RiverSSD-72258210

  • Determination

    MOD1 - Correct turbine coordinates

    Correct errors in turbine coordinates and project disturbance footprint mapping

    Edward River+1 moreSSD-41743746-Mod-1

  • Determination

    Deniliquin Ethanol Plant MOD 1 - Applicant Name

    Modify Applicant name

    Edward RiverSSD-6281-Mod-1

  • Determination

    Deniliquin East Battery Energy Storage System

    Development of a 100 MW battery energy storage facility with associated infrastructure

    Edward RiverSSD-61612229

  • Determination

    Tarleigh Park Solar Farm

    Development of a 90 MW solar farm and associated infrastructure.

    Edward RiverSSD-8436

  • Determination

    Bullawah Wind Farm

    Construction and operation of a wind farm with up to 141 wind turbines and associated infrastructure.

    Hay Shire+2 moreSSD-50505215

  • Recommendation

    Baldon Wind Farm

    Construction and operation of a wind farm with up to 180 wind turbines, battery storage and associated infrastructure.

    Murray River+2 moreSSD-40138508

  • Response to Submissions

    Tchelery Wind Farm

    Construction and operation of a wind farm with up to 74 wind turbines, energy storage and associated infrastructure.

    Edward RiverSSD-59701722

  • Assessment

    Romani Battery Energy Storage System

    The construction, operation and decommissioning of a battery energy storage system with a capacity of approximately 200MW/800MWh, and ancillary infrastructure.

    Edward RiverSSD-67105475

  • Assessment

    MOD 2 - Worker accommodation facility and infrastructure changes

    Addition of an onsite temporary worker accommodation facility, changes to infrastructure, site access and transport routes, increase in disturbance footprint and construction workforce

    Edward River+1 moreSSD-41743746-Mod-2

  • Assessment

    Dinawan Wind Farm

    Construction and operation of a wind farm with up to 200 wind turbines and associated infrastructure.

    Murrumbidgee+1 moreSSD-50725708

  • Assessment

    Victoria to NSW Interconnector West

    Development of a new 500kV double circuit transmission lines between the NSW and Victoria border near Murrabit and the new Dinawan substation; and replacement of the existing 330kV transmission line between Wagga substation and new Gugaa substation.

    Edward River+3 moreSSI-72887208