Abercrombie Wind Farm
The project would involve the construction, operation and maintenance and decommissioning of a new wind farm with up to 348 wind turbine generators, associated infrastructure, and battery energy storage systems.
Hay Shire+1 moreSSD-77340978
Prepare EIS
Wanganella Wind Farm
Construction, operation and decommissioning of a wind farm with an estimated capacity of 840 MW, up to 105 turbines and a maximum height of 270m (to blade tip), a 600 MW / 2400 MWh BESS, and temporary worker accommodation
Edward RiverSSD-78102208
Prepare EIS
Conargo Wind Farm
Construction and operation of a 168 MW wind farm, including 28 WTGs up to 270 m in height.
Edward RiverSSD-70611708
Prepare EIS
Booroorban (Saltbush) Wind Farm
Construction and operation of a 400 MW wind farm,including 70 wind turbines up to 280m in height, and a 600 MW / 1200 MWh BESS.
Edward RiverSSD-70636459
Prepare EIS
West Nyangay Solar Farm
Development of a 800MW solar farm with energy storage and associated infrastructure
Edward RiverSSD-74990235
Recently assessed or decided
Determination
Project EnergyConnect (NSW - Eastern Section)
Development of a new transmission line connecting Buronga Substation and Wagga Wagga Substation, and construction of the new Dinawan Substation (170 km west of Wagga Wagga).
Wentworth Shire+8 moreSSI-9172452
Determination
MOD 1 - Extension of Offset Timing
Seeking to extend timing for provision of biodiversity offset package
Wentworth Shire+8 moreSSI-9172452-Mod-1
Determination
Pottinger Wind Farm
Construction and operation of a wind farm with up to 247 wind turbines, battery storage and associated infrastructure.
Edward River+1 moreSSD-59235464
Determination
Billabong Creek Environmental Water Regulators
Replacing two existing weirs along Billabong Creek with two new environmental water regulators. The new regulators would allow for flow regulation and fish passage.
Edward RiverSSI-50831979
Determination
Yanco Delta Wind Farm
Development of a wind farm with up to 208 wind turbines, energy storage and associated infrastructure
Edward River+1 moreSSD-41743746
Determination
Deniliquin Battery Energy Storage System
Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of 120MW/480MWh and ancillary infrastructure.
Edward RiverSSD-72258210
Determination
MOD1 - Correct turbine coordinates
Correct errors in turbine coordinates and project disturbance footprint mapping
Edward River+1 moreSSD-41743746-Mod-1
Determination
Deniliquin Ethanol Plant MOD 1 - Applicant Name
Modify Applicant name
Edward RiverSSD-6281-Mod-1
Determination
Deniliquin East Battery Energy Storage System
Development of a 100 MW battery energy storage facility with associated infrastructure
Edward RiverSSD-61612229
Determination
Tarleigh Park Solar Farm
Development of a 90 MW solar farm and associated infrastructure.
Edward RiverSSD-8436
Determination
Bullawah Wind Farm
Construction and operation of a wind farm with up to 141 wind turbines and associated infrastructure.
Hay Shire+2 moreSSD-50505215
Recommendation
Baldon Wind Farm
Construction and operation of a wind farm with up to 180 wind turbines, battery storage and associated infrastructure.
Murray River+2 moreSSD-40138508
Response to Submissions
Tchelery Wind Farm
Construction and operation of a wind farm with up to 74 wind turbines, energy storage and associated infrastructure.
Edward RiverSSD-59701722
Assessment
Romani Battery Energy Storage System
The construction, operation and decommissioning of a battery energy storage system with a capacity of approximately 200MW/800MWh, and ancillary infrastructure.
Edward RiverSSD-67105475
Assessment
MOD 2 - Worker accommodation facility and infrastructure changes
Addition of an onsite temporary worker accommodation facility, changes to infrastructure, site access and transport routes, increase in disturbance footprint and construction workforce
Edward River+1 moreSSD-41743746-Mod-2
Assessment
Dinawan Wind Farm
Construction and operation of a wind farm with up to 200 wind turbines and associated infrastructure.
Murrumbidgee+1 moreSSD-50725708
Assessment
Victoria to NSW Interconnector West
Development of a new 500kV double circuit transmission lines between the NSW and Victoria border near Murrabit and the new Dinawan substation; and replacement of the existing 330kV transmission line between Wagga substation and new Gugaa substation.
Edward River+3 moreSSI-72887208