Assessment · SSI-72887208 · Major Project

Victoria to NSW Interconnector West

Development of a new 500kV double circuit transmission lines between the NSW and Victoria border near Murrabit and the new Dinawan substation; and replacement of the existing 330kV transmission line between Wagga substation and new Gugaa substation.

Project details

Application
SSI-72887208
Status
Assessment
Type
State Significant Infrastructure
Property
Located Between Nsw/Victorian Border Murrabit And Dinawan Substation - Nsw / Wagga Section Located In Gregadoo - Nsw
Development type
Electricity supply

How do you want to help?

Run a campaign for this project

Set up the objections once. Supporters write and lodge their own letters in their own words.

  • Unlimited AI help to build and review your campaign
  • Invite your team to build it with you
  • A public page open to unlimited supporters

Free to set up. $500 when you publish.

Know someone who'd organise this?

Campaigns get far more submissions than individual letters. Send this to a resident group, environment group, or local councillor who could run one.

Just want to object yourself? Lodge on the Planning Portal

Where this project is up to

Under assessment

The Department of Planning is assessing the project against planning controls and the issues raised in submissions.

Last checked on the Planning Portal
4 Nov 2026

Other open projects in these council areas

  • Prepare EIS

    Abercrombie Wind Farm

    The project would involve the construction, operation and maintenance and decommissioning of a new wind farm with up to 348 wind turbine generators, associated infrastructure, and battery energy storage systems.

    Hay Shire+1 moreSSD-77340978

  • Prepare EIS

    Livingstone Solar Farm

    Development of a 600 MW solar farm with battery storage and associated infrastructure.

    Wagga Wagga CitySSD-80114208

  • Prepare EIS

    Gugaa Battery Energy Storage System

    Construction, operation, and decommissioning of a Battery Energy Storage System with a capacity of approximately 1000 MW / 4000 MWh, and ancillary infrastructure.

    Wagga Wagga CitySSD-103829960

  • Prepare EIS

    Calvary Riverina Hospital Extension

    Expansion of the Calvary Riverina Hospital comprising additional floor area across Levels 1 and 2 to expand theatres, clinical areas, and support spaces, including minor internal reconfiguration and refurbishment.

    Wagga Wagga CitySSD-112416742

  • Prepare EIS

    Argoon Wind Farm

    Construction and operation of a wind farm with up to 106 wind turbines, battery storage and associated infrastructure.

    MurrumbidgeeSSD-64935522

  • Prepare EIS

    Wagga South Battery Energy Storage System

    Construction, operation, and decommissioning of a battery energy storage system (BESS) with a capacity of up to 300 MW / 1200 MWh, and ancillary infrastructure.

    Wagga Wagga CitySSD-134691490

All projects in Edward RiverAll projects in Murray RiverAll projects in MurrumbidgeeAll projects in Wagga Wagga City

How a campaign works

  1. 01

    Build your campaign

    Research the project, frame the objections, and add your own views.

  2. 02

    Share one link

    Get a public campaign page to share with your community.

  3. 03

    Lodge submissions, fast and easy

    Supporters pick the points that apply, add their own views, and lodge in their own words.

  4. 04

    See what's working

    Follow visits, signups, and lodged letters as they come in, and see which channel brings people in.

Make your yarns count.

Build a campaign, share with your community, and see the results.