Planning projects in Goulburn Mulwaree
93 State significant and State-assessed projects in Goulburn Mulwaree are listed on the NSW Planning Portal. 3 are on public exhibition, so anyone can make a submission until it closes. Council-assessed local DAs aren't included.
Open for submissions
Closes 12 Nov · 6 days left
MOD 3 - Increase to project output, footprint and lapse date
Increase to project output, footprint and lapse date
Goulburn Mulwaree+2 moreMP07_0175-Mod-3
Closes 12 Nov · 6 days left
MOD 3 - Increase to project output, footprint and lapse date
Increase to project output, footprint and lapse date
Goulburn Mulwaree+2 moreMP07_0174-Mod-3
Closes 12 Nov · 6 days left
MOD 4 - Increase to project output, footprint and lapse date
Increase to project output, footprint and lapse date
Goulburn Mulwaree+2 moreMP07_0176-Mod-4
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
RFBI Goulburn Masonic Retirement Village
Demolition of existing structures. Construction of a new seniors housing development for a 40 bed Residential Care Facility, 29 hostels and 18 Independent Living Units, including car parking, and landscaping areas.
Goulburn MulwareeSSD-144266491
Prepare EIS
Windellama Quarry and Landfill
Expansion of existing quarry/landfill site with 5.7 million cubic metres new landfill capacity in 8 cells, 400,000 tonnes per annum (tpa) clay extraction, 375,000 tpa receival of general solid non-putrescible, and special and restricted wastes
Goulburn MulwareeSSD-142531990
Prepare EIS
Magpie Hill Solar Farm
Construction, operation, and decommissioning of a Solar Farm with a capacity of up to 450 MW, a battery energy storage system (BESS) with a capacity of up to 450 MW / 3600 MWh, and ancillary infrastructure.
Goulburn Mulwaree+1 moreSSD-124298992
Prepare EIS
Boro Solar Farm
Development of a 150 MW solar farm and associated infrastructure, including battery storage facility.
Goulburn Mulwaree+1 moreSSD-87034971
Prepare EIS
WSC Quarry Marulan
Establish a hard rock quarry to provide up to 1,000,000 tonnes per annum of material over a 30 years.
Goulburn MulwareeSSD-82633224
Prepare EIS
Kerrawary Power Station - Lateral Gas Pipeline
To develop a 35 km underground gas pipeline from the existing Moomba Sydney pipeline to the Kerrawary Gas Fired Power Station near Marulan and associated infrastructure.
Upper Lachlan Shire+1 moreSSI-144719990
Recently assessed or decided
Exhibition
Regional Quarries Carrick Quarry
Material will be won by drill and blast methods and then will undergo crushing and screening to produce a range of hard rock products at a rate of up to 1 Million tonnes per annum.
Goulburn MulwareeSSD-77991709
Withdrawn
Goulburn Base Hospital Redevelopment Modification 1 - Deletion of Condition B8
Deletion of Condition B8, related to unexpected contamination procedure
Goulburn MulwareeSSD-8667-Mod-1
Withdrawn
Carrick Solar Farm
Development of a 144 MW solar farm and associated infrastructure
Goulburn MulwareeSSD-8734
Withdrawn
Jerrara Power Energy from Waste Facility
Construction and operation of an energy from waste facility with capacity to thermally treat up to 330,000 tpa of residual municipal solid waste and commercial and industrial waste, including construction of an overhead 66 kilovolt power line.
Goulburn MulwareeSSD-22879238
Withdrawn
Woodlawn Bioreactor Modification 5
Amendment to contingency measures for managing leachate.
Goulburn MulwareeMP10_0012-Mod-5
Withdrawn
Goulburn Poultry Processing Mixed Use Development
Proposed mixed-use development comprising a cold storage and distribution centre, poultry processing plant, childcare facility and other associated infrastructure at 52 Sinclair St, Goulburn NSW.
Goulburn MulwareeSSD-9143
Determination
MOD 1 - Compressor Station Installation
Installation of two compressor stations
Unincorporated Far West+10 moreSSI-15548591-Mod-1
Determination
Marulan South Limestone Mine Continued Operations Project
Continuation and expansion of open cut limestone mining operations
Goulburn MulwareeSSD-7009
Determination
Modification 1 Mod 1 - Appendix 1, Schedule of Lands - Correction
The amendment is required to properly identify the land to which the consent relates.
Goulburn MulwareeSSD-7009-Mod-1
Determination
Gunlake Extension Project MOD 2 - Increased Trucking
Gunlake Extension Project MOD 2 - Increased Trucking
Goulburn MulwareeSSD-7090-Mod-2
Determination
Moomba to Wilton Pipeline - Mod 3
Installation and use of groundwater bore and site layout amendments at the MW433 compressor station site
Unincorporated Far West+10 moreSSI-15548591-Mod-3
Determination
Woodlawn Bioreactor Expansion MOD-1 Leachate Management
Short-term leachate management strategy
Goulburn MulwareeMP10_0012-Mod-1
Determination
Mod 4 - Temporary Accommodation Camps
Construction and operation of six temporary accommodation camps to facilitate essential maintenance of the Moomba to Wilton Pipeline.
Unincorporated Far West+10 moreSSI-15548591-Mod-4
Determination
Modification 1 Gunlake Quarry Extension Project - MOD 1
The modification seeks to reduce the size of the 'Biodiversity Areas' referred to in condition 32 of Schedule 3 and shown in Appendix 5 of the development consent.
Goulburn MulwareeSSD-7090-Mod-1
Determination
MOD 2 - Compressor Station Installation
Installation of three compressor stations - Stage 3 of the East Coast Grid Expansion
Unincorporated Far West+10 moreSSI-15548591-Mod-2
Make your yarns count.