Planning projects in Murray River
14 State significant and State-assessed projects in Murray River are listed on the NSW Planning Portal. None are on public exhibition right now. Council-assessed local DAs aren't included.
Open for submissions
Nothing in Murray River is on exhibition right now. See everything open across NSW.
Coming up for exhibition
These projects are being prepared for public exhibition. Organisers who start early are ready the day submissions open.
Prepare EIS
Swan Hill Bridge Replacement
Demolition of existing timber bridge between Swan Hill to Murray Downs NSW, construction of temporary bridge and construction of a permanent two-lane bridge.
Murray RiverSSI-100112494
Prepare EIS
Wilan Wind Farm
Development of a wind farm with up to 138 wind turbines, energy storage and associated infrastructure.
Murray River+1 moreSSD-51306206
Recently assessed or decided
Withdrawn
Blessed Carlo College, Moama
A new catholic school for K-12 students for up to 390 students with associated works, car parking, sporting fields and drop-off/pick-up
Murray RiverSSD-24262975
Determination
Limondale Solar Farm
Development of a 250 MW solar farm and associated infrastructure.
Balranald Shire+1 moreSSD-8025
Determination
MOD 2 - Battery Energy Storage System
Development of 200MW / 400MWh battery energy storage system to support existing 250MW Solar Farm
Balranald Shire+1 moreSSD-8025-Mod-2
Determination
Project EnergyConnect (NSW - Eastern Section)
Development of a new transmission line connecting Buronga Substation and Wagga Wagga Substation, and construction of the new Dinawan Substation (170 km west of Wagga Wagga).
Wentworth Shire+8 moreSSI-9172452
Determination
MOD 1 - Extension of Offset Timing
Seeking to extend timing for provision of biodiversity offset package
Wentworth Shire+8 moreSSI-9172452-Mod-1
Determination
Limondale Solar MOD 1 - Panel Height & Subdivision
Subdivision and increase of maximum panel height.
Balranald Shire+1 moreSSD-8025-MOD-1
Determination
Koondrook-Perricoota Forest Flood Works MOD 1 - Koondrook-Perricoota Forest Flood Works
.
Murray RiverMP09_0098-Mod-1
Recommendation
Baldon Wind Farm
Construction and operation of a wind farm with up to 180 wind turbines, battery storage and associated infrastructure.
Murray River+2 moreSSD-40138508
Assessment
Junction Rivers Wind Farm (formerly Burrawong Wind Farm)
Development of a 750 MW wind farm, including 96 turbines (up to 300m), battery storage and ancillary infrastructure.
Murray RiverSSD-30448824
Assessment
Keri Keri Wind Farm
Development of a wind energy generation project with up to 155 wind turbines, with transmission connection, energy storage and associated infrastructure.
Murray RiverSSD-38358962
Assessment
Victoria to NSW Interconnector West
Development of a new 500kV double circuit transmission lines between the NSW and Victoria border near Murrabit and the new Dinawan substation; and replacement of the existing 330kV transmission line between Wagga substation and new Gugaa substation.
Edward River+3 moreSSI-72887208